• Title/Summary/Keyword: Peak discharge

Search Result 624, Processing Time 0.026 seconds

Forecasting of Peak Flood Stage at Downstream Location and the Flood Travel Time by Hydraulic Flood Routing (수리학적 홍수추적에 의한 댐 방류시 하류수위 및 주요 하도구간별 홍수도달 시간의 예측)

  • 윤용남;박무종
    • Water for future
    • /
    • v.25 no.3
    • /
    • pp.115-124
    • /
    • 1992
  • The peak flood discharge at a downstream station and the flood travel time between a pair of dams due to a specific flood release from the upper reservoir are computed using a hydraulic river channel routing method. The study covered the whole reservoir system in the Han River. The computed peak flood discharges and the travel times between dams were correlated with the duration and the magnitude of flood release rate at the upstream reservoir, and hence a multiple regression model is proposed for each river reach between a pair of dams. The peak flood discharge at a downstream location can be converted to the peak flood stage by rating curve. Hence, the proposed regression model could be used to forecast the peak flood stage at a downstream location and the flood travel time between dams using the information on the flood release rate and duration from the upper dam.

  • PDF

A Study on the Characteristic of Work Roll texturing for the Temper Rolling (조질압연용 Work roll의 조도가공 특성에 관한 연구)

  • 전태옥;전언찬;김순경
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1993.10a
    • /
    • pp.505-511
    • /
    • 1993
  • The results were obtained with changes according to the surface roughness of work roll and method to make the peak count on the roll in the temper rolling, and factors to affect to the work roll surface in actual rolling machine(ie. Temper mill). Conclusions are as follows. 1. E.D.T(Electro-discharge texturing)roll is more uniform roughness distribution than shot blasted roll and it's life time is two timees longer than that of shot blasted because it has more sine wave roughness. 2. The higher peak count of surface roughness, the more time is necessary to work roll texturing In shot blasting method, Surface roughness is relating to the grit size,impeller speed and hardness of roll material, But is can't control the peak count. 3. In shot blast texturing, Surface roughness of temper rolled strip which is transfered surface roughness of work roll is more ununiform than that of E.D.T roll 4. E.D.T roll has more uniform than the shot blasted roll and has more peak count than that of shot blasted roll. The surface of painted strip to image clarity is superior to that of shot blasted roll because E.D.T roll has more peak count and smooth surface.

  • PDF

Derivation of the Instantaneous Unit Hydrograph and Estimation of the Direct Runoff by Using the Geomorphologic Parameters (지상인자에 의한 순간단위도 유도와 유출량 예측)

  • 천만복;서승덕
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.32 no.3
    • /
    • pp.87-101
    • /
    • 1990
  • The purpose of this study is to estimate the flood discharge and runoff volume at a stream by using geomorphologic parameters obtained from the topographic maps following the law of stream classification and ordering by Horton and Strahier. The present model is modified from Cheng' s model which derives the geomorphologic instantaneous unit hydrograph. The present model uses the results of Laplace transformation and convolution intergral of probability density function of the travel time at each state. The stream flow velocity parameters are determined as a function of the rainfall intensity, and the effective rainfall is calculated by the SCS method. The total direct runoff volume until the time to peak is estimated by assuming a triangular hydrograph. The model is used to estimate the time to peak, the flood discharge, and the direct runoff at Andong, Imha. Geomchon, and Sunsan basin in the Nakdong River system. The results of the model application are as follows : 1.For each basin, as the rainfall intensity doubles form 1 mm/h to 2 mm/h with the same rainfall duration of 1 hour, the hydrographs show that the runoff volume doubles while the duration of the base flow and the time to peak are the same. This aggrees with the theory of the unit hydrograph. 2.Comparisions of the model predicted and observed values show that small relative errors of 0.44-7.4% of the flood discharge, and 1 hour difference in time to peak except the Geomchon basin which shows 10.32% and 2 hours respectively. 3.When the rainfall intensity is small, the error of flood discharge estimated by using this model is relatively large. The reason of this might be because of introducing the flood velocity concept in the stream flow velocity. 4.Total direct runoff volume until the time to peak estimated by using this model has small relative error comparing with the observed data. 5.The sensitivity analysis of velocity parameters to flood discharge shows that the flood discharge is sensitive to the velocity coefficient while it is insensitive to the ratio of arrival time of moving portion to that of storage portion of a stream and to the ratio of arrival time of stream to that of overland flow.

  • PDF

Influence of the Peace-Dam Construction on the Flood Discharge and the Flood Stage of the Hwachun-Dam (화천댐의 홍수량 및 수위에 미치는 평화댐의 영향 분석)

  • 전병호;신현석;이재철;윤용남
    • Water for future
    • /
    • v.26 no.1
    • /
    • pp.93-101
    • /
    • 1993
  • Because of the Keumkangsan-Dam and the Peace-Dam constructed in recent years, it is expected that the peak flood discharge and the peak flood stage at the Hwachun-Dam site have been changed. In this study, two methods were used to simulate and compare the effects of the upstream dam construction on the change of the discharge and the stage. One is the storage function method widely used for the hydrological routing in this country. The other is the DWOPER (Dynamic Wave Operational Model) package developed by the U.S. NWS for the hydraulic routing. Flood routing simulations have been performed on four different scenarios:1) Before the construction of the Keumkangsan-Dam and the peace-Dam, 2) The exclusion of the Keumkangsan-Dam watershed (before the construction of the Peace-Dam), 3) The exclusion of the Keumkangsan-Dam watershed (after the construction of the Peace-Dam), 4) The exclusion of the Peace-Dam watershed. The results of the four test cases from the two methods show that the peak flood discharge and the peak flood stage at the Hwachun-Dam site are reduced due to the construction of the Peace-Dam. From these findings, it is suggested that the operational criteria for the optimal dam-operation of the hwachun-Dam need to be modified.

  • PDF

Determination of Design Flood Levels for the Tidal Reach of the Han River

  • Jun, Kyungsoo;Li, Li
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.173-173
    • /
    • 2015
  • The flood water level in tidal river is determined by the joint effects of flood discharge and tidal water levels at downstream boundary. Due to the variable tidal boundary conditions, the evaluated design water levels associated with a certain flood event can be significantly different. To avoid determining of design water levels just by a certain tidal boundary condition and remove the influence of variability in boundary condition from the evaluation of design water levels, a probabilistic approach is considered in this study. This study focuses on the development of a method to evaluate the realistic design water levels in tidal river with taking into account the combined effects of river discharge and tidal level. The flood water levels are described by the joint probability of two driving forces, river discharge and tidal water levels. The developed method is applied to determine design water levels for the tidal reach of the Han River. An unsteady flow model is used to simulate the flow in the reach. To determine design water levels associated with a certain flood event, first, possible boundary conditions are obtained by sampling starting times of tidal level time series; then for each tidal boundary condition, corresponding peak water levels along the channel are computed; and finally, design water levels are determined by computing the expectations of the peak water levels. Two types of tides which are composed by different constituents are assumed (one is composed by $M_2$, and the other one is composed by $M_2$ and $M_2$) at downstream boundary, and two flood events with different maximum flood discharges are considered in this study. It is found that (a) the computed design water levels with two assumed tides have no significant difference for a certain flood event, though variability of peak water levels due to the tidal effect is considerably different; (b) tidal effect can reach to the Jamsil submerged weir and the effect is obvious in the downstream reach of the Singok submerged weir; (c) in the tidally affected reach, the variability of peak water levels due to the tidal effect is greater if the maximum flood discharge is smaller.

  • PDF

Variations of Annual Evapotranspiration nnd Discharge in Three Different Forest-Type Catchments, Gyeonggido, South Korea (임상이 다른 3개 산림소유역의 장기 증발산량과 유출량의 변화)

  • Kim Kyong-Ha;Jeong Yong-Ho
    • Korean Journal of Agricultural and Forest Meteorology
    • /
    • v.8 no.3
    • /
    • pp.174-182
    • /
    • 2006
  • This study was to clarify the effects of forest stand changes on hydrological components of evapotranspiration and discharge. The forest-hydrological experimental stations in Gwangneung and Yangju, Gyeonggido near metropolitan Seoul have been operated by the Korea Forest Research Institute since 1979 to clarify the effects of forest types and practices on the water resources and nutrient cycling and soil loss. The hydrological regime of the forested catchments may change as forests develop. The ranges of change may be different depending on forest types. Evapotranspiration can be estimated to 679mm, 580mm and 368mm in planted young coniferous (PYC), natural old-growth deciduous (NOD) and rehabilitated young mixed (RYM), respectively. The slope of the discharge-duration curve shows the capacity of discharge control in a specific catchment. The slope tended to be steeper in RYM than NOD, the better forest condition. The slope in RYM became more gentle as the forest stand developed. Forests can modulate peak flows through interception, evapotranspiration and soil storage opportunity. PYC and RYM showed 100 and 50mm of threshold rainfall for modulating peak flows, respectively. The deciduous forest did not represent sudden changes of peak flow rates to rainfall, even 200 mm rainfall Forest development in PYC may play an important role in modulation of peak flows because peak flow rates reduced after 10 years.

Estimation of Flood Discharge and Forecasting of Flood Stage in Small-Medium Urban Basin (중소도시유역의 홍수량산정 및 홍수위 예측)

  • Kim, min-jeong;Kim, byeong-chan;Lee, jong-seok
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2009.05a
    • /
    • pp.432-436
    • /
    • 2009
  • Recently, damage of flood is increased because of a short of time of concentration by development and a rise in runoff discharge by frequently heavy rain. The increase of runoff discharge is resulted in not only rise of water level but also damage of lives and property around river. Therefore, it is should be the first to estimate the exact runoff discharge. And based on the estimated flood discharge, flood damage is prevented by estimating inundated area of flood. In this study, flood stage is forecasted using HEC-HMS and HEC-RAS for Namdae-stream. The peak discharges were determinated by probability rainfall with the return period. The peak discharges obtained from HEC-HMS were inputted boundary conditions for the channel routing. Flood stages were evaluated using HEC-RAS.

  • PDF

A Method for Determination of 3D-Electrical Discharge Machining Parameters Using Z-map (Z-map을 이용한 3차원 방전가공조건의 결정방법)

  • 주상윤;이건범
    • Korean Journal of Computational Design and Engineering
    • /
    • v.4 no.4
    • /
    • pp.355-359
    • /
    • 1999
  • This paper presents a method for determining machining parameters in electrical discharge machining process (EDM) based on discharge area. The parameters are the peak value of currents, the pulse-on time, and the pulse-off time, on which the EDM performance depends chiefly. The optimal machining parameters are closely related on discharge area, which can be calculated from a tool electrode and a discharge height. In the paper the discharge area is obtained from NC code for machining the tool electrode instead of its geometric model. The method consists of following three steps. First a Z-Map model is constructed from the NC code. Secondly, the discharge area is obtained from the Z-Map model and a Z-height. Finally, the machining parameters are calculated from the discharge area. An introduced example shows that the machining parameters are calculated by the using a Z-map model obtained from the machining data for a tool electrode.

  • PDF

The Characteristics of the Discharge According to ITO Gap by the CLHS Driving Method in AC PDP (AC PDP에서 CLHS 구동 방법에 의한 ITO Gap에 따른 방전 특성)

  • Shin, Jae-Hwa;Choi, Myung-Gyu;Kim, Gun-Su
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.1
    • /
    • pp.83-89
    • /
    • 2013
  • In order to reduce the power consumption in international standard IEC62087, the luminance efficiency should be improved at the low discharge load rather than at the high discharge load. Thus, this paper analysed the characteristics of the discharge at the panels with ITO Gap of $65{\mu}m$, $80{\mu}m$, and $100{\mu}m$ in 50-inch PDP with FHD resolution. It was well known that the long gap panel improves the luminance and the luminous efficiency. However, it is very difficult to drive the panel due to high driving voltage. When the normal driving method was applied at the panel with ITO gap of $100{\mu}m$, the phenomenon of the double peak was generated in the sustain period. We confirmed that main factor of the double peak is the self-erasing discharge. When the CLHS driving method was applied at the panel with ITO gap of $100{\mu}m$, the self-erasing discharge was improved in the sustain period. Also, the $V_S$ and $V_A$ minimum voltage of the CLHS driving method decreased about 9V and 12V compared with those of the normal driving method. Moreover, when the CLHS driving method was applied to the panel with ITO gap of $100{\mu}m$, the luminance and the luminous efficiency increased compared with those of the normal driving method. The luminance and the luminous efficiency greatly increased at the low discharge load. The less discharge load, the higher increase rate of the luminance and the luminous efficiency. Especially, the luminous efficiency at ITO gap of $100{\mu}m$ increased about 26.3% at the discharge load of 4% compared with that at ITO gap of $65{\mu}m$.

Determination of Parameters for 3-Dimensional Electrical Discharge Machining by a Tool Electrode Surface (공구전극곡면에 의한 3차원 방전가공조건의 결정)

  • 주상윤;이건범
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.17 no.1
    • /
    • pp.27-33
    • /
    • 2000
  • This paper presents a method for determining machining parameters in 3-dimentional electrical discharge machining(EDM). The parameters are the peak value of currents, the pulse-on time, and the pulse-off time. It is known that they influence the performance of EDM more than the other else. The parameters are determined from the discharge area between a tool electrode and a work piece. The discharge area is directly influenced by the geometry of a tool surface and the tool discharge position. The discharge area on a tool discharge position is calculated from intersection curves between the tool surface and a horizontal plane. The grid search method is applied to determine the intersection curves. An example is introduced to show that the machining parameters are obtained from the surface geometry of a tool electrode.

  • PDF