• Title/Summary/Keyword: Payback period method

Search Result 38, Processing Time 0.031 seconds

Engineering and Economic Evaluation of Production of MgO Nanoparticles using a Physicochemical Method

  • Priatna, Deri;Nandiyanto, Asep Bayu Dani
    • International journal of advanced smart convergence
    • /
    • v.8 no.4
    • /
    • pp.26-33
    • /
    • 2019
  • We conducted research to evaluate economically and engineering about the synthesis of Magnesium Oxide, MgO, nanoparticles using physicochemical methods. The method used was economic evaluation by calculating GPM, BEP, PBP, and CNPV. The other method used was engineering perspective. MgO nanoparticles were synthesized by reacting Mg(NO3)2 and NaOH with a mole ratio 1: 2. Mg(OH)2 formed was heated and calcined to remove water content and to oxidation to form MgO. An economic evaluation by calculating GPM and CNPV for the production of MgO nanoparticles on an industrial scale shows that the payback period (PBP) occur in the third year and profits increase each year. Tax variations show that the higher of tax, the lower profits received. When there was an increase of selling prices, the profit was greater. The variable cost used is the price of raw material. When there was an increased in the variable cost price, the payback period was longer and the profits was reduced. The benefit of this research is knowing the industrial production of MgO nanoparticles is beneficial. The function of MgO nanoparticles is a material for the manufacture of ceramics and can be used as an antimicrobial in the water filtration process.

A Study on Economic benefits for Water Control Device Installed with a Flush Valve on a Toilet (세척밸브 급수제어장치 설치에 따른 경제적 효과 분석)

  • Park, Kang-Hyun;Kim, Su-Min
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.23 no.10
    • /
    • pp.656-661
    • /
    • 2011
  • The amount of water resources that can be used tend to be decreased gradually. In contrast, the rapidly increasing water consumption is a problem that need to be addressed. Renovation and equipment replacement to improve energy efficiency and to reduce expenditure for building usage is required. But the excessive initial investment cost and the prolonged of pay back period may be uneconomical choice. Water usage for cleaning the toilet bowl accounts for 27%of the total water usage. Water-saving valve that can select the amount of water for cleaning toilet bowl can be reduced expenditure. After installing water-saving valve, analysed the economic effects. Water-saving valves compared with flush valves, and researched the amount of water usage. Then analyzed for the economic effects. Water-saving valve was used 5.6 ${\ell}$/time for cleaning toilet bowl. In contrast, flush valve was consumed 8.4 ${\ell}$/time. Water-saving valve's water-saving rate was 33.3%. The initial payback period for Water-saving valve was 459.5 days. By a small investment in water saving valve, the economic benefits can be obtained.

Energy Efficiency Evaluation of Heating and Cooling Systems as Space Program in Renovated Library (도서관의 공간사용 특성에 따른 냉난방설비 리모델링의 경제성 평가)

  • Park, Kang-Hyun;Cha, Jung-Hoon;Kim, Su-Min;Park, Kyung-Won
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.24 no.3
    • /
    • pp.205-211
    • /
    • 2012
  • Unlike the previous approaches, we analyzed for economic efficiency of renewed heating and cooling systems as the characteristics of space. The purpose of this study is to analysis the energy consumption and economical efficiency of absorption chillers and EHP systems in renovated library. It is important that equipment selection should be considering energy cost as well as space program. In recently, many EHP systems were installed in the building for reducing the energy cost and for seeking the convenience of individual control. In contrast, though absorption chillers have the disadvantage of a central control, absorption chillers are appropriate for the conditions of the library that needs simultaneous operation. The results by payback period method, show that selection of heating and cooling systems should be consider for space program and the characteristics of space.

An Economic Analysis on Dual-fuel Engine Generation for Peak Load (피크부하용 혼소엔진발전의 경제성 분석)

  • Lee, Ok-Bae;Ahn, Jae-Kyoung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.9
    • /
    • pp.1260-1268
    • /
    • 2012
  • Recently, lack of power reserve margin was observed quite often. In this paper, we studied the method to secure power source for a short time, to cut the utility power peak load, and to reduce the users electricity bills. Emergency diesel generator of an office building is to be converted into a dual-fuel engine generator which is responsible for a portion of the peak load. Compared to the conventional diesel fuel generator, the proposed dual-fuel engine is able to reduce the generation power cost by dual-fuel combustion, and it also mitigates the building's utility power peak load by charging the building's peak load. If the dead resources (a group of emergency dual-fuel engine generators), as a Virtual Power Plant, are operating in peak time, we can significantly reduce future large power development costs. We investigated the current general purpose electricity bills as well as the records of the building electric power usage, and calculated diesel engine generator renovation costs, generation fuel costs, driving conditions, and savings in electricity bills. The proposed dual-fuel engine generation method reduces 18.1% of utility power peak load, and turned out to be highly attractive investment alternative which shows more than 27% of IRR, 76 million won of NPV, and 20~53 months of payback periods. The results of this study are expected to be useful to developing the policy & strategy of the energy department.

A Study on Economic Analysis Algorithm for Energy Storage System Considering Peak Reduction and a Special Tariff (피크저감과 특례요금제를 고려한 ESS 경제성 분석 알고리즘에 관한 연구)

  • Son, Joon-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.10
    • /
    • pp.1278-1285
    • /
    • 2018
  • For saving electricity bill, energy storage system(ESS) is being installed in factories, public building and commercial building with a Time-of-Use(TOU) tariff which consists of demand charge(KRW/kW) and energy charge(KRW/kWh). However, both of peak reduction and ESS special tariff are not considered in an analysis of initial cost payback period(ICPP) on ESS. Since it is difficult to reflect base rate by an amount of uncertain peak demand reduction during mid-peak and on-peak periods in the future days. Therefore, the ICPP on ESS can be increased. Based on this background, this paper presents the advanced analysis method for the ICPP on ESS. In the proposed algorithm, the representative days of monthly electricity consumption pattern for the amount of peak reduction can be found by the k­means clustering algorithm. Moreover, the total expected energy costs of representative days are minimized by optimal daily ESS operation considering both peak reduction and the special tariff through a mixed-integer linear programming(MILP). And then, the amount of peak reduction becomes a value that the sum of the expected energy costs for 12 months is maximum. The annual benefit cost is decided by the amount of annual peak reduction. Two simulation cases are considered in this study, which one only considers the special tariff and another considers both of the special tariff and amount of peak reduction. The ICPP in the proposed method is shortened by 18 months compared to the conventional method.

A Case Study on the Installation and Operation of the Standing Column Well Method (우물관정형(SCW공법) 지열히트펌프 시스템의 설치 및 운영사례)

  • Na, Sang-Min;Park, Si-Sam;Park, Jong-Hun;Rhee, Keon-Joong;Kim, Tae-Won
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.06a
    • /
    • pp.592-595
    • /
    • 2009
  • In recent years, geothermal heat pump (GHP) systems have become increasingly popular for heating and cooling in buildings. The Standing Column Well (SCW) method is one of the most efficient GHP system. Because it use groundwater for heat transfer material. In SCW systems, water is re-circulated between the well and the building (heat pump). It is only a short time since this method has been applied in domestic. So we have to refer to the developed countries' guides and manuals of SCW. In this paper, several design and construction points of SCW method are filed. We used real operation data of SCW system at Chong-Ju Univ. site for economical efficiency analysis. As a result, the payback period of Chong-Ju Univ. site is calculated at 7.23 years.

  • PDF

A Technical and Economic Evaluation of Cobalt-rich Manganese Crusts (심해저 망간각 개발의 경제성 평가)

  • Park, Se-Hun;Yang, Hee-Cheol
    • Ocean and Polar Research
    • /
    • v.31 no.2
    • /
    • pp.167-176
    • /
    • 2009
  • Cobalt-rich manganese crusts on seamounts have received an increasing amount of attention as future resources for Co, Ni, Cu, and Mn. A dearth of detailed information regarding the relevant distribution characteristics, mining technologies, and ore processing technologies, however, has precluded potential evaluations of the technical and economic advantages of these crusts. In the past 4 years, Korea has undertaken a survey of the cobalt-rich manganese crusts in and around the Magellan Seamount and Mid-Pacific Mountains. This paper introduces the preliminary feasibility study of the distribution features and R&D results centered around the development of the cobalt-rich manganese crusts. The evaluation model was developed by modifying the model for the manganese nodules. In addition to considering the geological and geophysical differences between the manganese nodules and the cobalt-rich manganese crusts, an ore dressing subsystem was installed in the model. The mining subsystem is composed of a self-propelled collector--a pipeline with submersible hydraulic pumps for crust lifting. The smelting and chlorine leach method was selected for metallurgical processing. The production scales were established at 2,500t/y of cobalt metal. The production of three metals--cobalt, nickel, and copper--was considered in terms of metallurgical processing. The economic feasibility analyses demonstrated that the payback period was 11.4 years, the NPV was 36M$, and the IRR was 9.6% with the economic factors in the case of a cobalt price of US$ 25/lb. It was also demonstrated in this study that the payback period was 8.6 years, the NPV was 154M$, and the IRR was 14.0% in the case of a cobalt price of US$ 30/lb. This indicates that the approach under consideration appears to offer greater potential given the predicted metal prices.

Economic analysis of Frequency Regulation Battery Energy Storage System for Czech combined heat & power plant (체코 열병합발전소 주파수조정용 배터리에너지저장장치 경제성 분석)

  • KIM, YuTack;Cha, DongMin;Jung, SooAn;Son, SangHak
    • Journal of Energy Engineering
    • /
    • v.29 no.2
    • /
    • pp.68-78
    • /
    • 2020
  • According to the new climate change agreement, technology development to reduce greenhouse gases is actively conducted worldwide, and research on energy efficiency improvement in the field of power generation and transmission and distribution is underway [1,2]. Economic analysis of the operation method of storing and supplying surplus electricity using energy storage devices, and using energy storage devices as a frequency adjustment reserve power in regional cogeneration plants has been reported as the most profitable operation method [3-7]. Therefore, this study conducted an economic analysis for the installation of energy storage devices in the combined heat and power plant in the Czech Republic. The most important factor in evaluating the economics of battery energy storage devices is the lifespan, and the warranty life is generally 10 to 15 years, based on charging and discharging once a day. For the simulation, the ratio of battery and PCS was designed as 1: 1 and 1: 2. In general, the primary frequency control is designed as 1: 4, but considering the characteristics of the cogeneration plant, it is set at a ratio of up to 1: 2, and the capacity is simulated at 1MW to 10MW and 2MWh to 20MWh according to each ratio. Therefore, life was evaluated based on the number of cycles per year. In the case of installing a battery energy storage system in a combined heat and power plant in the Czech Republic, the payback period of 3MW / 3MWh is more favorable than 5MW / 5MWh, considering the local infrastructure and power market. It is estimated to be about 3 years or 5 years from the simple payback period considering the estimated purchase price without subsidies. If you lower the purchase price by 50%, the purchase cost is an important part of the cost for the entire lifetime, so the payback period is about half as short. It can be, but it is impossible to secure profitability through the economy at the scale of 3MWh and 5MWh. If the price of the electricity market falls by 50%, the payback period will be three years longer in P1 mode and two years longer in P2 and P3 modes.

Economic Feasibility of a Hypothetical Shrimp Farm a Combination of Semi-Closed Raceways and Ponds (시범 새우양식장의 경제적 타당성 연구)

  • 이재후
    • The Journal of Fisheries Business Administration
    • /
    • v.13 no.1
    • /
    • pp.85-97
    • /
    • 1982
  • This study involves a blending of intensive and extensive shrimp culture techniques for a hypothetical shrimp farm which uses a combination of heated raceway nurseries and extensive grow-out ponds per year. The present value method of economic analysis is used to determine economic feasibility. The biological data in this reports were obtained from published or personal communications from leaders in the field of shrimp aquaculture. The proposed system showed economic feasibility using the present value method with discount rates of 10% and 12%. The most profitable scenario, the culture of three crops of Penaeus vannamei showed a 1.26 year payback period and 120% annual average rate of return. The breakeven price was $1.25/1b., which is $1.52 less than the market price of $2.77. Breakeven production was 724 1bs/acre, which is 8761bs. less than the assumed 1,600 1bs/acre. All other scenarios 1.2 and 3 crops for P. stylirostris and P. setiferus showed economic feasibility also.

  • PDF

Economic Assessment of a Wind Farm Project Using Least Square Monte-Carlo (LSMC) Simulation (최소자승몬테카를로 시뮬레이션을 이용한 풍력발전설비 투자계획)

  • Kim, Jin-A;Lee, Jong-Uk;Lee, Jae-Hee;Joo, Sung-Kwan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.1
    • /
    • pp.32-35
    • /
    • 2011
  • The economic value of a wind farm project is influenced by various risk factors such as wind power output and electricity market price. In particular, there is uncertainty in the economic evaluation of a wind farm project due to uncertain wind power outputs, which are fluctuated by weather factors such as wind speed, and volatile electricity market prices. This paper presents a systematic method to assess the economic value and payback period of a wind farm project using Least Square Monte-Carlo (LSMC) simulation. Numerical example is presented to validate the effectiveness of the proposed economic assessment method for a wind farm project.