• Title/Summary/Keyword: Pavement Management System

Search Result 137, Processing Time 0.024 seconds

Development of Decision Model and Management System to minimize Pavement Utility Cut for Road Facility (도로시설 재굴착 방지를 위한 의사결정모델 및 관리시스템 개발)

  • Cho, Jin-Young;Jang, Oun-Sung;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.164-171
    • /
    • 2013
  • In urban planning, road facility is used not only for the transportation purpose but also for the utility line space purpose such as electrical, gas, tele communication, heating, water, sewer, and so on. However, since these utilities are built by many different groups, it becomes very difficult to communicate each other. Delay in one party can cause another party's schedule delay but they don't commuicate often. Also, some delay in utility work can cause frequent pavement cut. And, this will impact on construction cost, schedule delay, low quality, user complain and cost. This study developed spatiotemporal decision model to prevent prequent utility cut for mega project such as new urban development project. In addition, this study developed utility cut management system to manage utility cut schedule under pavement. Finally, developed system was applied to new urban development project and verified there effectiveness.

Application and Data Architecture Design for A Pavement Asset Management System based on the Level of Service (서비스수준에 기반한 도로포장자산관리시스템의 응용 및 데이터 아키텍처 설계)

  • Choi, Won-Sik;Lim, Jong-Tae
    • The Journal of the Korea Contents Association
    • /
    • v.11 no.12
    • /
    • pp.919-930
    • /
    • 2011
  • National highway is one of the social infrastructures that continue to be managed in order to serve their full functions. The national highway has been managed by the Pavement Management System (PMS) until now. The PMS manages the highway as a way of facility maintenance and maximizes the service life of the highway with minimum cost. The cost is evaluated mainly with a facility manager's perspective based on engineering judgment. People's needs of quality of life have been increased as their income level is rising and naturally the opinion of citizen as a taxpayer plays an important role in determining national policy. Therefore, the contentment of a user's perspective was the starting point of addressing these needs. The Level of Service began to be used as a measure for the evaluation of the user's perspective. In this thesis we would like to design an application and a data architecture for a pavement asset management system and to show how it meets the requirements of KTAM-40 Systems.

A Study of the Autonomous Driving Path Planning for Concrete Pavement Cutting Operation (콘크리트 도로 표면절삭 작업을 위한 자율주행 진로계획 수립방안)

  • Moon, Sung-Woo;Seo, Jong-Won;Yang, Byong-Soo;Lee, Won-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.929-933
    • /
    • 2007
  • Concrete Pavement Cutting Operation have Labor-intensive features. And Cutting Operation quality and productivity is influenced by operator's experience. Moreover Workers have risk of safety concerns. Therefore we need Concrete Pavement Cutting Operation automation system and system support software development on the economics. First of all we have to develop driving Path Planning for Concrete Pavement Cutting automation system. If result of Path Planning connect with automation system, Weak points is a complement to the existing Path Planning and we can obtain effective automation system. Consequently this paper suggest method of Autonomous Driving Path Planning for Concrete Pavement Cutting Operation And the Path Planning system application.

  • PDF

Skid Resistance Characteristics of Pavement Surface (포장노면 미끄럼 저항특성)

  • Kim, Yong-Seok;Hong, Jae-Cheong;You, Hyeong-Mok
    • International Journal of Highway Engineering
    • /
    • v.14 no.4
    • /
    • pp.1-8
    • /
    • 2012
  • PURPOSES : Skid resistance on pavements plays an important role in reducing the risk of vehicle skidding on wet surface particularly. Almost 9.3 percent of traffic accidents were occurred under rainy condition and these are over-represented in terms of the severity of the crashes. Recently, unusual weather conditions referred widely as the intensified rainfalls justify the need of a systematic management of skid resistance. In this context, the study carried out the observational study on the skid resistance characteristics of different types of pavement with the time passage. METHODS : This study measured the skid resistance with Pavement Friction Tester at three times within five years. The skid resistance measurement has followed the method suggested by ASTM. RESULTS : As the main results under the scope of this study, skid resistance of asphalt concrete has not nearly reduced with time. On the contrary, skid resistance of cement concrete has been rapidly reduced with time though the highest resistance was gained at the early observation. Porous asphalt concrete shows a steady decrease of skid resistance with time, anyway, the reduction rate according to the increase of measurement speeds is relatively lower than the others. CONCLUSIONS : Based on our study, skid resistance of the pavement should be regarded as one of the pavement management system, so periodic measurement should be made to assure road safety as a whole.

Estimation of Performance and Pavement Life using National Highway Pavement Condition Index (NHPCI 지표를 활용한 공용성 추정과 수명 산정)

  • Do, Myung-Sik;Lee, Yong-Jun;Lim, Kwang-Su;Kwon, Soo-Ahn
    • International Journal of Highway Engineering
    • /
    • v.14 no.5
    • /
    • pp.11-19
    • /
    • 2012
  • PURPOSES: The new methodology is proposed for estimation of long-term performance and pavement life based on the national highway database in Daejeon area. Furthermore, this study tried to verify the applicability of performance estimation using NHPCI (National Highway Pavement Condition Index) on tendency of pavement deterioration as time goes by under Korean road environments. METHODS: Reliability theories are applied to estimate the mean life and to determine the appropriate distribution using 3 levels of traffic loads (high, medium, low) based on maintenance and rehabilitation history data for 15 years. RESULTS: As a result, Lognormal distribution is suitable for explanation of pavement lifetime in Daejeon area regardless of traffic loads. In addition, we found that the results of mean life and maintenance timing based on NHPCI for the pavement sections of 3 levels of traffic loads are available. CONCLUSIONS: Based on this study, it was found that mean life of high, medium and low levels of traffic loads are about 8.1 years, 12.2 years and 12.7 years, respectively. Higher level of traffic loads shorten the pavement mean life.

Characteristics of Asphalt Pavement Images and Enhanced Algorithm for Noise Reduction (이미지프로세싱기법을 이용한 포장이미지의 특성과 노이즈제거를 위한 알고리즘 선정)

  • Kim, Jung-Yong;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.3 no.4 s.10
    • /
    • pp.137-146
    • /
    • 2001
  • Pavement distresses are one of the most important data for pavement management systems. Inspection machines and its related programs have been used for operating tools in PMS developed in advanced countries. In Korea imported machines and programs for the length price ale utilized to get information of pavement condition from the field This study is launched for developing the program which can detect cracks on asphalt pavement due to many drawbacks in current PMS operation such as improper maintenance work and long resting period when it was broken. The focus of this study is to define principles to analyze pavement surface with digital image processing techniques, to test property of pavement images and to suggest an algorithm that reduces noises at test. To test images, the camera attached on the Automatic Road Analyser(ARAN) was used. Through the FFT images, histogram and statistical values of pavement images, it was found that the images had many noises with high-frequency components against general images, and it was difficult to subdivide pavement images into background or crack. Through several testing with various filters for noise reduction a 3X3 median filter was suggested to reduce noises effectively.

  • PDF

Development of Korean Life Cycle Cost Analysis Model for Road Pavement Asset Management (도로포장자산관리를 위한 한국형 생애주기비용 모형 개발)

  • Han, Daeseok;Do, Myungsik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1639-1650
    • /
    • 2013
  • Road pavement management is an important activity that affects to national economy, movement and safety of people, and also demands huge amount of budget. Therefore, its management strategy must be established under objective information. In addition, decision support system that produces the management strategy needs to consider practical benefits from various aspects. Considering these aspects, this paper aimed to develop a customized Korean life cycle cost analysis model estimating various effects on road users and socio-environmental costs based on pavement condition. The suggested LCCA model focused on Korean national highway, and tried to adopt a national guideline recommended by Korean government for securing credibility of estimation results. In the development processes, some of the suggestions that do not fit well in the situations of pavement management field were added, altered, or partially modified. These attempts to develop customized asset management system would be an important step to break away from passive attitudes relying on ready-made software, but also to improve awareness about the social benefits from the better maintenance strategy.

A Study on Analysis of Performance Life for Hot Recycled Asphalt Pavements in the National Highway (일반국도의 가열 재활용 아스팔트 포장 공용수명 분석 연구)

  • Lee, Kanghun
    • International Journal of Highway Engineering
    • /
    • v.19 no.5
    • /
    • pp.117-129
    • /
    • 2017
  • PURPOSES : The purpose of this study is to analyze the performance life of hot central plant recycling (HCPR) and hot in-place recycling (HIR) pavements applied to the National Highway for the past 20 years and compare it with conventional hot-mix asphalt (HMA) pavement. METHODS : In order to analyze the performance life of recycling asphalt pavements, a comprehensive literature review was conducted to investigate the government law and official system for the use of recycling asphalt pavement in Korea and foreign countries. Next, the application information of using a hot central plant recycling and hot in-place recycling pavements in the national highway is collected from the database of pavement management system (PMS) and then their field condition is visually surveyed. Finally, the performance life of recycling asphalt pavements in the national highway is analyzed and compared with conventional hot-mix asphalt pavement. RESULTS :Institutions are encouraging the promotion of using recycled asphalt pavement through various legal systems in Korea as well as abroad. Based on analysis results for the average performance life of hot central plant recycling pavement applied to the national highway, the average performance life is estimated to be 10.2 years. However, the average performance life of in-place recycling pavement is estimated to be 6.5 years. However, it is expected to increase performance life after the HIR construction system is modified. CONCLUSIONS : Based on the limited data analysis of the performance life of recycled asphalt pavements, HCPR shows similar performance life to conventional asphalt pavement but HIR shows shorter performance life than conventional asphalt pavement. However, it is noted that all performance life data is very limited and it should be monitored and analyzed further.

Development of AR System for Asphalt Pavement Compaction Operation and Suggestion for Accompanying Education Program (AR을 이용한 아스팔트 포장 다짐공사 지원 시스템 구축 및 교육과정 제안)

  • Kim, Namho;Cho, Namjun;Kim, Noah
    • Journal of Practical Engineering Education
    • /
    • v.11 no.1
    • /
    • pp.33-41
    • /
    • 2019
  • A pavement construction process consists of series of lay-down operation for pavement materials to form a designated thickness and compaction operation for the lay-down layer to form a designated strength. A technological breakthrough in pavement compaction equipment was made in last 15 years in western countries: intelligent compaction roller, that is equipped with GPS along with other pavement response sensors is becoming a game-changer in pavement construction. This paper introduces AR system that may be used in asphalt pavement compaction operation using intelligent compactor. Since AR technology is very new concept in road construction society, a suggestion for accompanying education program was also made for specific task group in pavement compaction operation. Since AR technology has not been introduced in asphalt pavement compaction operation, the AR compaction management would lead the construction quality of asphalt pavement to the beyond level.

Real-Time Pavement Damage Detection Based on Video Analysis and Notification Service (동영상 분석을 통한 실시간 포장 손상 탐지 및 알림 서비스)

  • Park, Juyoung;Lee, Heuisoon;Kang, Kyungtae;Kim, Byung-Hoe
    • KIISE Transactions on Computing Practices
    • /
    • v.24 no.2
    • /
    • pp.59-66
    • /
    • 2018
  • In this paper, we propose a system to detect various damage automatically inflicted on road pavement by collecting and analyzing data from acceleration and camera sensors in real time. The proposed system sends the collected images, acceleration signals, and GPS coordinates to the road manager and the database in the remote server, shortly after detecting the damage to the road pavement. Our study makes three key contributions. The proposed system 1) enables road managers to maintain road conditions quickly, accurately, and conveniently; 2) allows road mangers to take care of various kinds of damage to the road pavement at the initial stage; and finally 3) even makes it possible to track the damage, which suggests that the integration of a high-level decision support function becomes affordable. We tested the sensitivity and precision of the proposed system against real-time data obtained from the vehicles driving on the highway at an average speed of 100 km/h. With ten iterations, the proposed system achieved an average sensitivity of 74% and an average precision of 84% in road pavement damage detection, which is comparable with the best competing schemes.