Korean Journal of Construction Engineering and Management
/
v.14
no.4
/
pp.164-171
/
2013
In urban planning, road facility is used not only for the transportation purpose but also for the utility line space purpose such as electrical, gas, tele communication, heating, water, sewer, and so on. However, since these utilities are built by many different groups, it becomes very difficult to communicate each other. Delay in one party can cause another party's schedule delay but they don't commuicate often. Also, some delay in utility work can cause frequent pavement cut. And, this will impact on construction cost, schedule delay, low quality, user complain and cost. This study developed spatiotemporal decision model to prevent prequent utility cut for mega project such as new urban development project. In addition, this study developed utility cut management system to manage utility cut schedule under pavement. Finally, developed system was applied to new urban development project and verified there effectiveness.
National highway is one of the social infrastructures that continue to be managed in order to serve their full functions. The national highway has been managed by the Pavement Management System (PMS) until now. The PMS manages the highway as a way of facility maintenance and maximizes the service life of the highway with minimum cost. The cost is evaluated mainly with a facility manager's perspective based on engineering judgment. People's needs of quality of life have been increased as their income level is rising and naturally the opinion of citizen as a taxpayer plays an important role in determining national policy. Therefore, the contentment of a user's perspective was the starting point of addressing these needs. The Level of Service began to be used as a measure for the evaluation of the user's perspective. In this thesis we would like to design an application and a data architecture for a pavement asset management system and to show how it meets the requirements of KTAM-40 Systems.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.929-933
/
2007
Concrete Pavement Cutting Operation have Labor-intensive features. And Cutting Operation quality and productivity is influenced by operator's experience. Moreover Workers have risk of safety concerns. Therefore we need Concrete Pavement Cutting Operation automation system and system support software development on the economics. First of all we have to develop driving Path Planning for Concrete Pavement Cutting automation system. If result of Path Planning connect with automation system, Weak points is a complement to the existing Path Planning and we can obtain effective automation system. Consequently this paper suggest method of Autonomous Driving Path Planning for Concrete Pavement Cutting Operation And the Path Planning system application.
PURPOSES : Skid resistance on pavements plays an important role in reducing the risk of vehicle skidding on wet surface particularly. Almost 9.3 percent of traffic accidents were occurred under rainy condition and these are over-represented in terms of the severity of the crashes. Recently, unusual weather conditions referred widely as the intensified rainfalls justify the need of a systematic management of skid resistance. In this context, the study carried out the observational study on the skid resistance characteristics of different types of pavement with the time passage. METHODS : This study measured the skid resistance with Pavement Friction Tester at three times within five years. The skid resistance measurement has followed the method suggested by ASTM. RESULTS : As the main results under the scope of this study, skid resistance of asphalt concrete has not nearly reduced with time. On the contrary, skid resistance of cement concrete has been rapidly reduced with time though the highest resistance was gained at the early observation. Porous asphalt concrete shows a steady decrease of skid resistance with time, anyway, the reduction rate according to the increase of measurement speeds is relatively lower than the others. CONCLUSIONS : Based on our study, skid resistance of the pavement should be regarded as one of the pavement management system, so periodic measurement should be made to assure road safety as a whole.
PURPOSES: The new methodology is proposed for estimation of long-term performance and pavement life based on the national highway database in Daejeon area. Furthermore, this study tried to verify the applicability of performance estimation using NHPCI (National Highway Pavement Condition Index) on tendency of pavement deterioration as time goes by under Korean road environments. METHODS: Reliability theories are applied to estimate the mean life and to determine the appropriate distribution using 3 levels of traffic loads (high, medium, low) based on maintenance and rehabilitation history data for 15 years. RESULTS: As a result, Lognormal distribution is suitable for explanation of pavement lifetime in Daejeon area regardless of traffic loads. In addition, we found that the results of mean life and maintenance timing based on NHPCI for the pavement sections of 3 levels of traffic loads are available. CONCLUSIONS: Based on this study, it was found that mean life of high, medium and low levels of traffic loads are about 8.1 years, 12.2 years and 12.7 years, respectively. Higher level of traffic loads shorten the pavement mean life.
Pavement distresses are one of the most important data for pavement management systems. Inspection machines and its related programs have been used for operating tools in PMS developed in advanced countries. In Korea imported machines and programs for the length price ale utilized to get information of pavement condition from the field This study is launched for developing the program which can detect cracks on asphalt pavement due to many drawbacks in current PMS operation such as improper maintenance work and long resting period when it was broken. The focus of this study is to define principles to analyze pavement surface with digital image processing techniques, to test property of pavement images and to suggest an algorithm that reduces noises at test. To test images, the camera attached on the Automatic Road Analyser(ARAN) was used. Through the FFT images, histogram and statistical values of pavement images, it was found that the images had many noises with high-frequency components against general images, and it was difficult to subdivide pavement images into background or crack. Through several testing with various filters for noise reduction a 3X3 median filter was suggested to reduce noises effectively.
KSCE Journal of Civil and Environmental Engineering Research
/
v.33
no.4
/
pp.1639-1650
/
2013
Road pavement management is an important activity that affects to national economy, movement and safety of people, and also demands huge amount of budget. Therefore, its management strategy must be established under objective information. In addition, decision support system that produces the management strategy needs to consider practical benefits from various aspects. Considering these aspects, this paper aimed to develop a customized Korean life cycle cost analysis model estimating various effects on road users and socio-environmental costs based on pavement condition. The suggested LCCA model focused on Korean national highway, and tried to adopt a national guideline recommended by Korean government for securing credibility of estimation results. In the development processes, some of the suggestions that do not fit well in the situations of pavement management field were added, altered, or partially modified. These attempts to develop customized asset management system would be an important step to break away from passive attitudes relying on ready-made software, but also to improve awareness about the social benefits from the better maintenance strategy.
PURPOSES : The purpose of this study is to analyze the performance life of hot central plant recycling (HCPR) and hot in-place recycling (HIR) pavements applied to the National Highway for the past 20 years and compare it with conventional hot-mix asphalt (HMA) pavement. METHODS : In order to analyze the performance life of recycling asphalt pavements, a comprehensive literature review was conducted to investigate the government law and official system for the use of recycling asphalt pavement in Korea and foreign countries. Next, the application information of using a hot central plant recycling and hot in-place recycling pavements in the national highway is collected from the database of pavement management system (PMS) and then their field condition is visually surveyed. Finally, the performance life of recycling asphalt pavements in the national highway is analyzed and compared with conventional hot-mix asphalt pavement. RESULTS :Institutions are encouraging the promotion of using recycled asphalt pavement through various legal systems in Korea as well as abroad. Based on analysis results for the average performance life of hot central plant recycling pavement applied to the national highway, the average performance life is estimated to be 10.2 years. However, the average performance life of in-place recycling pavement is estimated to be 6.5 years. However, it is expected to increase performance life after the HIR construction system is modified. CONCLUSIONS : Based on the limited data analysis of the performance life of recycled asphalt pavements, HCPR shows similar performance life to conventional asphalt pavement but HIR shows shorter performance life than conventional asphalt pavement. However, it is noted that all performance life data is very limited and it should be monitored and analyzed further.
A pavement construction process consists of series of lay-down operation for pavement materials to form a designated thickness and compaction operation for the lay-down layer to form a designated strength. A technological breakthrough in pavement compaction equipment was made in last 15 years in western countries: intelligent compaction roller, that is equipped with GPS along with other pavement response sensors is becoming a game-changer in pavement construction. This paper introduces AR system that may be used in asphalt pavement compaction operation using intelligent compactor. Since AR technology is very new concept in road construction society, a suggestion for accompanying education program was also made for specific task group in pavement compaction operation. Since AR technology has not been introduced in asphalt pavement compaction operation, the AR compaction management would lead the construction quality of asphalt pavement to the beyond level.
Park, Juyoung;Lee, Heuisoon;Kang, Kyungtae;Kim, Byung-Hoe
KIISE Transactions on Computing Practices
/
v.24
no.2
/
pp.59-66
/
2018
In this paper, we propose a system to detect various damage automatically inflicted on road pavement by collecting and analyzing data from acceleration and camera sensors in real time. The proposed system sends the collected images, acceleration signals, and GPS coordinates to the road manager and the database in the remote server, shortly after detecting the damage to the road pavement. Our study makes three key contributions. The proposed system 1) enables road managers to maintain road conditions quickly, accurately, and conveniently; 2) allows road mangers to take care of various kinds of damage to the road pavement at the initial stage; and finally 3) even makes it possible to track the damage, which suggests that the integration of a high-level decision support function becomes affordable. We tested the sensitivity and precision of the proposed system against real-time data obtained from the vehicles driving on the highway at an average speed of 100 km/h. With ten iterations, the proposed system achieved an average sensitivity of 74% and an average precision of 84% in road pavement damage detection, which is comparable with the best competing schemes.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.