Park, Jin-Gu;Oh, Kyung-Taek;Ryu, Gyu-Seok;Jung, In-Su;Lee, Chan-Sik
International conference on construction engineering and project management
/
2009.05a
/
pp.1559-1563
/
2009
Despite the serious lack of parking lots, studies on parking lot expansion are insufficient; research on users' satisfaction following parking lot expansion is practically nonexistent. Therefore, this study sought to provide basic data for the parking lot expansion of old apartments by comparatively analyzing users' satisfaction before and after the parking lot expansion through a questionnaire survey that targeted residents benefiting from the expanded parking lot. Results revealed a low post-occupancy satisfaction with the parking lot expansion despite the parking lot expansion and improvement of the parking lot environment. This was because the parking lot was not expanded up to the second basement floor due to the lack of appropriate parking space. Other factors included the construction cost burden and lack of connectivity of the basement parking lot with elevators. The results actually raise the need for the establishment of an optimally suitable expansion plan and development of method and technology requiring lower cost and shorter construction period in the design and construction processes for parking lot expansion. Through post-occupancy evaluation (POE) after parking lot expansion, this study quantitatively identified the problems associated with the parking lots of old apartments and ensuing expansion effects. The findings in this study can be used as basic data to seek a suitable diagnosis and evaluation method for the parking lots of old apartments.
Park, Myoung Hwan;Jeong, Byung Yong;Park, Cha-O-Rum
Journal of the Ergonomics Society of Korea
/
v.34
no.5
/
pp.427-436
/
2015
Objective: This study aims to analyze occupational accidents of parking lot attendants by parking lot type. Background: Recently, efforts are made to analyze accident characteristics by occupation type targeting the workers engaged in the same work. Method: This study analyzes 303 occupational accidents of parking lot attendants occurring from 2010 to 2012. Parking lots are grouped into two groups according to the work environment. One is public/ground type which comprises road side or open area parking lots and the other is building/mechanical type which comprises a multi-story parking building with connecting ramps and/or mechanical parking system. The characteristics of occupational accidents by parking lot type are analyzed. Results: Accident characteristics showed the difference between public/ground type and building/mechanical type on the size of enterprise, age, gender and work experience of the injured. Also the accident type, source of accident and parts of body affected are different between the two parking lot types. Conclusion and Application: The findings of accident characteristics according to parking lot types can be used as baseline data for establishing systemized preventative policies for occupational accidents of parking lot attendants.
In past, parking lot was placed on the ground and for the reason air quality was not in problem. But recently parking lot has been placed under the ground and the air quality becomes problem. So in this study, the ventilation performance on the underground parking lot was estimated by using CFD software and alternative system was suggested. Three case studies are handled in this study. 1st case is just an underground parking lot. 2nd case is about an underground parking lot where has 4 fan rooms on each floor and 3rd case is about an underground parking lot where has 4 fan rooms and 30 guidance fans on each floor.
Parking lot within housing site contains public interest of relieving parking space shortage problem and subject to public restriction. If auctioned off at higher price by excessive competition in general competitive bid for land bidders, the development of parking lot will be made against its original purpose supply. The core issue is that a bid price is quite often to be blown out of proportion by 150%~ 250% due to extreme competition and, could face serious problem if a winning bidder runs sale business. If it is rental business, although about 30% of the total floor space of the whole building to be used as neighborhood facilities, too high winning bid price cause to lose transparency. In case of sale at aggregate buildings, most business operators would sell 30% of the neighborhood facilities, spare the parking lot and manages thereof separately. According to Aggregate Buildings Act, neighborhood facilities are allowed for individual registration and ownership of parking lot by business operator or designated person by business operator. In this case, the parking lot becomes 70% of the total floor space of the whole building and 70% of the land share which makes the mortgage very valuable and easier for business operator to get financial loan. There used to be many cases such as owners of neighborhood facilities (aggregate buildings partial owners) who run parking lot to repay their loan running parking lot to repay loan, but found that very tough and reached auction and relatively disadvantaged. For parking lot within housing site, it is recommend to exclude the public factors that land has and take into account of public restriction in area (housing site). Business opportunity for operators and protection of property rights for buyers in aggregate buildings, land supply method is recommended to replace from highest bid method into draw or private contract. In terms of price, supply at estimated price (construction price) and restriction on usage (Co-ownership of parking lot) proposals are submitted.
Nowadays, insufficient parking lots give rise to a serious problem. Cars are increased in geometrical progression, but parking lots that takes in cars are relatively limited. Often we spend a lot of time to look for a parking lot because of limited parking lot. To solve this problem, we can use real time parking lot information system provided from mobile vehicles. In this paper, we will tell you how to deliver the parking lot information in real time by construction wireless network environment to be provided real time information and making XML data that is easy to share and to exchange data between applications.
Proceeding of Spring/Autumn Annual Conference of KHA
/
2006.11a
/
pp.316-321
/
2006
Multiplex use facility emphasized the importance of indoor air environment because many people using that place. People using parking lot of multiplex use facility in little time, but a pollutant of in indoor air menacing user health. This study measure and analyze the CO, $CO_2$ for better air quality of an indoor parking lot in the multiplex user facility. As a result, two-way opened above ground parking lot is higher numerical value of CO, $CO_2$ than an underground parking lot. And a parking lot of square form is higher numerical value of $CO_2$ than a parking lot of rectangle form.
Crowdsensing technologies can improve the efficiency of smart parking system in comparison with present sensor based smart parking system because of low install price and no restriction caused by sensor installation. A lot of sensing data is necessary to predict parking lot saturation in real-time. However in real world, it is hard to reach the required number of sensing data. In this paper, we model a saturation predication combining a time-based prediction model and a sensing data-based prediction model. The time-based model predicts saturation in aspects of parking lot location and time. The sensing data-based model predicts the degree of saturation of the parking lot with high accuracy based on the degree of saturation predicted from the first model, the saturation information in the sensing data, and the number of parking spaces in the sensing data. We perform prediction model learning with real sensing data gathered from a specific parking lot. We also evaluate the performance of the predictive model and show its efficiency and feasibility.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.1039-1042
/
2007
The number of vehicle has been increased due to growth of economy. Consequently, the needs for parking area has been increasing. there is a serious problem in aged-apartments. It result from observing a parking lot law at that times. That is the reason why residents demand parking lot expansion. Parking lot addition is being studied on a lots different standpoint to solve the present parking lot condition. Parking lot expansion is limited by housing complex characteristics. This study analyzed the housing complex characteristics of aged-apartment. It is analyzed that the number of house holders, distance between buildings, and level of site for finding housing complex characteristics. The result are as follows. the complex lower than 300 households is about 35% in the Number of households. The buildings which has a moving distance from 41m to 50 is nearly 23%. Them the 멕스둣 house located on the flat is 82%. This study will become a reference data for the parking lot expansion.
Kim, Jung-Hee;Park, Jin-Sook;Joo, Chan-Uhng;Choi, Ki-Chul
Quality Improvement in Health Care
/
v.4
no.1
/
pp.116-124
/
1997
Background : As parking problem caused by increasing owner-driver and patients concentrating to a general hospital is becoming one of the dissatisfactions in medical care. It is time that a general hospital should solve the parking problem in a desirable way. The purpose of this survey is to let the clients understand the basic motivation of the pay parking and develop the better parking system. Methods : Clients of a tertiary care hospital in Chon-ju were surveyed by means of a questionnaire. All in all, 193 subjects answered the questionnaire. Results : In relation to previous experiences, 39.6% of the subjects experienced inconvenience with confused parking lot and the shortage of parking space. Under the current parking system, the subjects who felt the available parking space was enough were more than those who didn't 62.7% of the subjects answered that they could find the parking lot easily. 33.2% of the subjects mentioned that it was not easy to drive in the parking area ; The reasons were pointed out the shortage of space, disordered parking, and insufficient guide. 12.8% of the subjects satisfied with the current administering system of parking lot. The outpatients were more affirmative than the admitted patients about the charging system. As for the parking fee, 64% of the subjects answered that it is expensive, and 89.5% of the subjects thought imposing of parking fee is irrational. Conclusion : To say as a whole, the basic purpose of the charging system are more or less accepted. However, the management details like parking facilities and payment method are dissatisfactory, so it is necessary to improve the management system. It is also noted that the inpatients showed more negative attitude than the outpatients with the charging system. To secure a more convenient parking, the parking system should be considered in relation to the information service, kind guidance, improve facilities, personnel cooperation, fix outpatient scheduling system, etc.
Automobiles and parking lots have greatly been increased by the continuous development of new towns and residential districts. There were not enough parking lots; and although there were off-street parking lots available for sale, they were not easily sold. Through a parking regulation, local governments can require parking spaces for more than a certain rate in developing areas. Despite local governments should require parking spaces within the parking demand and regulation, they did not investigate parking demands. Off-street parking spaces are not easy to sell because they don't consider the parking demand. In this study, we analyzed the factors that affect the parking management in order to increase sales of the off-street parking. The factors were "the characteristics of the parking lots", "the accessibility of the off-street parking", and "the traffic environment around off-street parking." We have derived suggestions for these factors. In addition, this study has derived nine variables affecting the parking operation in these three factors, and suggested a logistic regression model and the influence of each factors. According to the analysis, "parking signs" were the most influential. Next were "land uses" and "lanes on road".
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.