As the population of persons and automobiles rapidly grows, parking problems also grow in large cities of Korea. The purpose of this paper is to first grasp the status of parking facilities and characteristics in large cities of Korea; and introduce new directions of CBD parking policies in north America cities: and finally recommend the adequate parking management strategies and tactics for improving parking problems in Korea. For this purpose, field survey for parking inventories, patrol survey for parking usage as observed demand and drive interview survey for parking behavior were conducted. Compared with the parking characteristics and polices of foreign cities, many differences of characteristics were found, and existing parking management policies, which should be improved, were identified. Five categories of parking management strategies were set on; a) Reasonable control of CBD parking demand, b) securing of the public parking facilities c) Promotion of privately operated parking facilities d) expansion of financial resources for parking facilities construction and e) Improvement of existing parking management system. And actural seventeen tactics to attain the above strategies were recommended.
Dark and desolate underground parking spaces in commercial facilities are optimal spaces for crime. First, this study reviewed 15 precedent CPTED guidelines and related literatures, and as a result extracted 45 CPTED planning criteria for underground parking facilities. Secondly by field survey, we investigated six parking spaces in commercial facilities whether they were planned properly based on 45 checklist items, in six categories of CPTED principles. In result, target facilities showed average 46.8% relevance ratio, which means less than a half of 45 items of CPTED planning factors were not applied. Guidelines suggest desirable illuminance level of more than 100 lux, however the measurement of illuminance levels in some parking spaces showed below 50 lux. Relatively department stores were keeping CPTED guidelines better than large discount mart and mixed used facilities. Definition of territory of loading dock and customer area should be clarified, clear signage and color scheme in different zones should be represented with higher level of territorial responsibilities and surveillance in mixed used facilities for further improvement.
KSCE Journal of Civil and Environmental Engineering Research
/
v.26
no.3D
/
pp.375-383
/
2006
Nationals Assembly have experiencing unbalance between capacities and demand of parking facilities because of increasing parking demand, free parking policy, long term parking and passenger car use of workers, usage of neighborhood office workers and visitors. The lack of parking facilities cause illegal parking on the street inside and outside of National Assembly which result in the disorder of parking culture. To solve these parking problems, this study suggest parking management system to enter the National Assembly for the short term and charging parking fee, operation by private company, constructing parking building by abrogation of upper limit and construction of ground park, and so on. The study, also, suggested to strengthen weekday or 10 day shift system, to increase shuttle bus and commuting bus, to activation of Han River waterside parking area, public transportation with those new parking management system. For the conclusion, the parking problems of National Assembly should be focused more on parking management than the parking facilities supply.
The Journal of The Korea Institute of Intelligent Transport Systems
/
v.22
no.2
/
pp.44-53
/
2023
Recently, serious parking problems are occurring due to the difficulty of securing sufficient parking space, and it may lead to other traffic or social problems. In order to solve the parking problem in areas and districts beyond a certain range, a study on-roads and off-street parking lots reflecting regional characteristics is necessary. Therefore, this study establishing a parking demand calculation model for use as a basic study in establishing on-road and off-road characteristics. In order to conduct the study, Dong-fu, Daegu Metropolitan City was divided into dongs, and parking facilities and parking demand were investigated. The survey time was divided into daytime and nighttime on weekdays, and the types of vehicles were divided into three types: passenger car, small trucks and buses, large trucks and buses. As explanatory variables for calculating parking demand, the total floor area of buildings for each of six purposes was used, including detached houses, apartment houses, neighborhood living facilities, cultural and assembly facilities, business facilities, and sales facilities. As a result of the correlation analysis, among the six explanatory variables, the total area of neighborhood living facilities showed a significant correlation with on- and off-street parking demand. A regression analysis model was constructed using the total area of neighborhood living facilities as an explanatory variable, and statistically significant results were obtained.
Parking lot within housing site contains public interest of relieving parking space shortage problem and subject to public restriction. If auctioned off at higher price by excessive competition in general competitive bid for land bidders, the development of parking lot will be made against its original purpose supply. The core issue is that a bid price is quite often to be blown out of proportion by 150%~ 250% due to extreme competition and, could face serious problem if a winning bidder runs sale business. If it is rental business, although about 30% of the total floor space of the whole building to be used as neighborhood facilities, too high winning bid price cause to lose transparency. In case of sale at aggregate buildings, most business operators would sell 30% of the neighborhood facilities, spare the parking lot and manages thereof separately. According to Aggregate Buildings Act, neighborhood facilities are allowed for individual registration and ownership of parking lot by business operator or designated person by business operator. In this case, the parking lot becomes 70% of the total floor space of the whole building and 70% of the land share which makes the mortgage very valuable and easier for business operator to get financial loan. There used to be many cases such as owners of neighborhood facilities (aggregate buildings partial owners) who run parking lot to repay their loan running parking lot to repay loan, but found that very tough and reached auction and relatively disadvantaged. For parking lot within housing site, it is recommend to exclude the public factors that land has and take into account of public restriction in area (housing site). Business opportunity for operators and protection of property rights for buyers in aggregate buildings, land supply method is recommended to replace from highest bid method into draw or private contract. In terms of price, supply at estimated price (construction price) and restriction on usage (Co-ownership of parking lot) proposals are submitted.
Journal of the Korean Institute of Rural Architecture
/
v.17
no.1
/
pp.73-81
/
2015
The purpose of this study is to analyze the approach characteristics, relation to other facilities, and current status focusing on 28 total of exhibition-culture facilities in Gangneung. The results are following as. First, 19 facilities are located in urban area and nine are located in country side. With locational characteristics of Gangneung which is mountains in west and sea to east, three are located in high hill side and four are in sea shore among nine facilities. Facilities in urban area converge to Gungpodae and Ojukhuk which are symbol space in Gangneung. Those facilities started to have been increased from 1990s and rapidly increased from 2000s. The reason is that people have been interested in culture and art in society in general. In building structure, buildings related with traditional contents were constructed with wooden structure while buildings have been mainly constructed with modern ways such as steel and reinforced concrete structure. Second, the 28 facilities are classified into three types by function of other space or facilities within same a site or a building. The three types are themselves usage only, multi-function, and park type. The multi-function type is re-classified into two; public type and commercial type. Those functions have changed according to changes of society and times. Finally, for approaching to the exhibition-culture facilities with general transportation, the mean distance from the closest bus stop to those facilities each is 280m and 27 facilities are located within 670m from the closest bus stop. For approaching way using by car creates movement along road-building site-parking space-main entrance of building. When based on main entrance by the movement, parking space located in front side of main entrance is the largest, next is in the side, and the least is in back side. Various factors such as approaching form from road to parking space and space size between main entrance and parking space influence to approaching ways of exhibition-culture facilities in Gangneung.
Journal of the Korean Institute of Rural Architecture
/
v.13
no.3
/
pp.29-36
/
2011
The purpose of this study was analyzing with present conditions and content analysis of the parking area for the handicapped people. The researcher investigate to that establishment ratio, accessibility, the induction and guidance, and safe walking passage security, and proper space of the parking area for the handicapped people was established by lawfully. The results as follows. In spite of the regulation established by law, regulations was not established 40% on region government. The parking area for the handicapped people established Properly consider to the accessibility. But the size and height of the stand-up guide plate of the induction and guidance which corresponds in legal establishment standard of the handicapped people. then this research analyzes problems and suggests alternatives of the facilities.
KSCE Journal of Civil and Environmental Engineering Research
/
v.30
no.1D
/
pp.37-44
/
2010
The present annexed parking lot standards for buildings in Parking Act are categorized in 9 groups with 13 parking standards in terms of recreation, culture and assembly, housing, factory, warehouse, and so on, in which same grouped facilities have same parking standards. These days diversity in building types and functions need more fractionated parking standards; however, most local governments focusing merely on applying strengthened parking standards in general without systematic rules of consistency. The current problem of parking standards being used is lack of regarding facility characteristics; expecially, a large sized high-tech manufacturing facility located in industrial site is still applied by same parking standards as normal manufacturing facility, even though most part of manufacturing process is automated and hence less manpower is employed. This paper presents a parking generation forecasting model for factory facilities in industrial site in terms of facility use and scale characteristics.
The main topic of this paper is to show a possibility of indoor air quality enhancement and the fan energy savings in underground parking facilities by applying the demand-controlled ventilation (DCV) strategy based on the real-time variation of the traffic load. The established ventilation rate is estimated by considering the passing distance, CO emission rate, idling time of a vehicle, and the floor area of the parking facility. However, they are hard to be integrated into the real-time DCV control. As a solution to this problem, the minimum ventilation rate per a single vehicle is derived in this research based on the actual ventilation data acquired from several existing underground parking facilities. And then its applicability to the DCV based on the real-time variation of the traffic load is verified by simulating the real-time carbon monoxide concentration variation. The energy saving potentials of the proposed DCV strategy is also checked by comparing it with those for the current underground parking facility ventilation systems found in the open literature.
KSCE Journal of Civil and Environmental Engineering Research
/
v.41
no.5
/
pp.551-557
/
2021
Attached parking lots installation criteria is determined by use, total floor area, etc. according to the Parking Lot Act and local government ordinances. However, with traffic demand increase inconvenience about use of culture and assembly facilities have been raised. When planning number of parking lots for cultural and assembly facilities, legal parking lots and unit parking lots are used, but this causes inconvenience and traffic problems on the surrounding roads, because reality and convenience are not considered. Therefore, this study intend to present an realistic number of parking lots calculating equation for movie theater in Gwangju Metropolitan City. After investigating number of parking lots, number of screens, number of seats, total floor area, bus route and illegal parking for a cultural facility in Gwangju Metropolitan City, prediction model for calculating number of parking lots was presented using SPSS regression analysis. As a result of comparing prediction model and unit method, the prediction model was be closer actual cumulative parking space, so prediction model verification was completed. Based on the model verified in this study, Realistic number of parking lots will be installed. However, due to limitations of research on specific areas, research on various facilities should continue in consideration of regional, population, and urban characteristics
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.