• 제목/요약/키워드: Park Development Plan

검색결과 1,279건 처리시간 0.024초

보건의료발전계획 수립의 시급한 필요성 (The Urgent Need to Establish the Plan for Development of Health and Medical Services)

  • 박은철
    • 보건행정학회지
    • /
    • 제29권3호
    • /
    • pp.245-247
    • /
    • 2019
  • Although 19 years have passed since the enforcement of the Framework Act on Health and Medical Services, the Plans for Development of Health and Medical Services has not been established. This Plan is a 5-year basic long-term plan that covers the whole of health and medical services. This Plan should point to the direction of 30 long-term plans of healthcare, and this Plan should serve as a combination and coordination of 30 long-term plans and 22 related laws. The United States, the United Kingdom, and Japan have established long-term healthcare plans (4-, 10-, and 20-year plans, respectively). The long-term health plan of the United States has been approached bottom-up, those of the United Kingdom and Japan have been approached top-down. The rapid environmental changes that Korea is and will be experiencing emphasize urgently the need for establishing the Plan for Development of Health and Medical Services.

Some Design Approaches for Practical Use of Small Urban Spaces

  • Kim, Do-Kyong;Hong, Hyung-Soon;Suh, Joo-Hwan
    • Journal of the Korean Institute of Landscape Architecture International Edition
    • /
    • 제1호
    • /
    • pp.192-201
    • /
    • 2001
  • Today, the availabity of usable pieces of land in urbanized areas is very limited. Specifically, it is very difficult to secure a piece of land to be used as a park for the public, mainly due to the high price of land in cities. However, the City of Seoul has carried out three action plans to secure land deemed for insufficient parks and to vitalize these small piece of land in downtown areas such as following: 1. Ssamzie-park(Korean version of a 'vest pocket park') Development Plan in 1990 through 1991. 2. Modernization Plan for Children's Parks since 1994. 3. Maeul-madang (Korean version of 'community garden')Development Plan since 1996. The purpose of this study was to present some design approaches for practical use of small urban spaces by articulating the concepts of Modernization Plan for Children's Park and Maeul-madang Development Plan of the winning entries and by describing how the concepts were actualized in reality.

  • PDF

수질오염총량관리제의 성과평가: 개발/삭감계획의 이행실적 및 단위유역의 수질 현황 (Performance Appraisal of Total Maximum Daily Loads: Performance on Development/Reduction Plan and Water Quality Status of Unit Watershed)

  • 박재홍;박준대;류덕희;정동일
    • 한국물환경학회지
    • /
    • 제25권4호
    • /
    • pp.481-493
    • /
    • 2009
  • This study was conducted to performance appraisal of Total Maximum Daily Loads (TMDLs), especially in terms of performance on development & reduction plan and water quality status of unit watershed. Because load allocations for pollution sources were predicted redundantly by uncertainty of prediction, TMDLs master plan has been frequently changed to acquire load allocation for local development. Therefore, It need to be developed more resonable prediction techniques of water pollution sources to preventing the frequent change. It is suggested that the reduction amount have to be distributed properly during the planning period. In other words, it has not to be concentrated on the specific year (especially final year of the planning period). The reason why, if the reduction amount concentrate on the final year of the planning period, allotment loading amount could not be achieved in some cases (e.g., insufficiency of budget, extension of construction duration). If the development plan was developed including uncertain developments, it is necessary to be developed reduction plan considered with them. However, some of the plans in the reduction plan could not be accomplished in some case. Because, it is not considered financial abilities of local governments. Consequently, development plan must be accomplished to avoid uncertain developments, and to consider financial assistance to support the implementation of effective plan. Water quality has been improved in many unit watersheds due to the TMDLs, especially in geum river and yeongsang/seomjin river.

화옹지구 간척생태공원 토지이용계획 (Hwaong Eco-park Land Use Plan in Consideration of Reclamation)

  • 성지영
    • 한국농공학회:학술대회논문집
    • /
    • 한국농공학회 2005년도 학술발표논문집
    • /
    • pp.443-449
    • /
    • 2005
  • As sustainable development and environment-friendly efforts in large-scale development projects emerge as major interests at home and abroad, man-made wetlands and eco-park facilities have been newly planned or created when developing reclamation districts recently. In this study, based on findings from a comprehensive review of relevant studies and planning cases, the basic direction and objectives of the plan were developed. A comprehensive analysis on the status of ecological environment and demographic and social environment showed that the planned site is in a process of migrating from early stages of reclamation to middle stages. It was planned for the eco-park to function as a major base along an ecological network consisting a freshwater lake and rivers and streams flowing into the lake in Hwaong District. Through a master plan and sectoral plans were planned according to desalination levels after reclamation. Then, habitats for livings organisms were also planned. The eco-park, the planned site, is also in a process of migrating from the early stages to middles stages. By creating an eco-park that considers post-reclamation ecological environment changes, natural succession processes will be preserved, which is expected to help local ecosystems to restore their functions on their own over a relatively long period of time and enable to observe the restoration process.

  • PDF

광양항 동측배후단지 2단계 사업지구 상징공원 및 수변공원 설계 (A Design for the Symbol Park and the Waterfront Park for the Second Stage Development in the Eastern Rear Complex of Gwangyang Harbor)

  • 홍형순;김도경;정한호
    • 한국조경학회지
    • /
    • 제34권3호
    • /
    • pp.104-119
    • /
    • 2006
  • The eastern rear business complex of the Gwangyang Harbor (second stage) has undergone the 'alternative bid' process by which a construction company is selected based on their suggestions for an alternative plan and the bid for the construction expenses is based on the previously completed original plan, thereby implicitly accepting the arrangement and scale of the park which was presented in the original plan. It is possible, however, that the concept and plan of each park needs to be approached in a new way within the extent of given design guidelines. This study focuses on the alternative plan process and the Symbol Park (the second neighborhood park) and Waterfront Park (the third neighborhood park) among the five neighborhood parks in the eastern rear business complex (second stage). These two parks provide scale and function for the structure of the park and greenways system at the eastern rear complex. The neighboring waterway is a significant resource for emphasizing the pre-development features of the site. The alternative plan process focuses on determining the resources for the park's plan based on the environmental analyses of the site and utilizing the results. That is, through an analysis of the current state, all available resources are determined and the facilities and activities are derived based on these results. By this, Symbol Park and Waterfront Park reflect the regional features of the eastern rear complex, and these parks will feasibly perform the role of the region's key parte. The limit of this study is the fact that there is no chance for landscape architecture to actively play a role in the creation of the master plan, land utilization plan, and plan for the complex. Therefore there is a problem that the function scale and location of the park are not distributed appropriately in the rear complex. Also the plan for protecting the waterway's shore, a significant resource, only considers the structural stability of the engineering works, degrading the visual and ecological quality. These experiences will be used as a case for further designing the industrial complex and for the resulting park plan.

지구단위계획 지구에서의 건축디자인 결정에 관한 연구 - 광주 수완지구 공동주택을 중심으로 - (A Study on Architectural Design Decision in District Unit Plan Area - with Apartment Houses at Suwan District in Gwangju -)

  • 박현주;김윤학;윤인중;박주연;조용준
    • 한국주거학회:학술대회논문집
    • /
    • 한국주거학회 2008년 추계학술발표대회 논문집
    • /
    • pp.273-277
    • /
    • 2008
  • Architectural design guideline of Korea prescribed that district unit plan was established for development over fixed scale since 2000 and it was based on the intention to make district view contextually. But, it was not applicable to practice and as a result of research, setting of district image was not clear when development of district unit plan was completed and elements and contents of district unit plan for embodying it were finite or theoretical. In addition, architectural design neglected contextual view of the whole district based on district unit plan and was inclined to individual view within district, and architectural deliberation was also inclined to individual view within the district rather than contextual view rather than contextual view. Therefore, district unit plan requires decision of element and range as design management for setting image and embodying it when development is completed and architectural design or deliberation must be also premised on district view.

  • PDF

Roles of Park and Green Space Planning for Establishing Livable Communities in the Environmental Age through Encouraging Linkage of Academic and Practical Approaches

  • Yoritaka Tashiro
    • Journal of the Korean Institute of Landscape Architecture International Edition
    • /
    • 제2호
    • /
    • pp.74-80
    • /
    • 2004
  • The significance and means of parks and green space planning have been changed dramatically in this century in Japan. The first priority must be given to define the means and purposes of planning., especially the role of ecological, social and economical management with the increasing trend of environmental concern, and the method to estimate values of park and green space from the point of view of regenerative society development. The role of planning parks and green space is reviewed in the following three aspects; as tools for land use control (master plan), as tools for finding appropriate lands for purchasing land (development plan) and tools for application of individual development technique of green space and landscapes(site plan and design). It is a serious issue that the existence of parks in urban setting which used to be considered as a top priority, is now being challenged in terms of economical, social and environmental benefits. In such processes, the most important issue is to define what makes parks and green spaces attractive and ecological to obtain social support to be developed.

  • PDF

왕동.황룡강권 개발 기본계획 - 남도만향기행 (Development Plan of Wangdong and Hwangryong-River District)

  • 박원규;박명권;신지훈
    • 한국조경학회지
    • /
    • 제31권5호
    • /
    • pp.108-118
    • /
    • 2003
  • There are plenty of ecological and traditional resources around Wandong and the Hwangryong-River district, and so the purpose of this development plan is to preserve ecological resources and traditional culture, and to utilize potential value of recreation in this site. Two major concepts are established in this plan one is “Green-Tourism”, the other is “Blue-Recreation”. In this development plan “Green-Tourism” means the effective tourism using ecological and traditional resources, while “Blue-Recreation” means the active tourism using waterfront and cultural facilities. The concept of “Green-Tourism” is applied to the Wangdong area, which is comprised of 6 theme zones. The concept of “Blue-Recreation” is applied to the Hwangryong-River area, which is composed of 4 theme zones. In total, 10 theme zones are planned according to characteristics found in the regional surroundings and cultural facilities of each zone.

A Support System for Design and Routing Plan

  • Park, Hwa-Gyoo;Shon, Ju-Chan;Park, Sung-Gin;Baik, Jong-Myung
    • 한국전자거래학회:학술대회논문집
    • /
    • 한국전자거래학회 1999년도 학술대회지 vol.2
    • /
    • pp.607-614
    • /
    • 1999
  • In this paper, we demonstrate the implementation case using component based development tool under development process for application developments. The tool suggested provides the programming environment for the development of distributed manufacturing applications primarily. The development tool is classified into visual component, logic component, data component, knowledge component, neural net component, and service component which is a core component for the support component edit and execution. We applied the tool to the domain of the design and routing plan to retrieve existing similar design models in database, initiate a model, generate a process plan, and store the new model in the database automatically. Utilizing the tool, it integrates a geometric modeler, engineering/manufacturing database, and knowledge sources over the Internet.

  • PDF

The Surrey Research Park: A Case Study of Strategic Planning for Economic Development

  • Parry, Malcolm
    • World Technopolis Review
    • /
    • 제1권3호
    • /
    • pp.206-225
    • /
    • 2012
  • The development of the Surrey Research Park by the University of Surrey is an addition to a number of existing strategies to collaborate with industry that it has developed over its 120 year history. The potential to undertake this development was based on owning a substantial land holding that the University acquired when the Borough Council for the town of Guildford invited the University to relocate from Battersea in London to its new location in 1966. Initial plans for the Park in 1979 were accelerated in 1981 in response to plans by the then government to reduce funding for Higher Education in the UK. Beyond a broad master plan for the site that was based on topography and access to the site the plans that were developed were based on a survey of 100 companies that were deemed to be in the target market for the site and a review of the other 7 science parks that were being developed in the UK in 1981. The findings from this proved to be important in developing the master plan for the site. Another important influence on the project was the objectives that were defined for the 3 stakeholders in the project of the University, the tenant companies and the planning authority relate to economic development, a competitive advantage of tenant companies, knowledge transfer, the profile for the University and the capacity to generate income proved to be a valuable framework on which to develop a master plan. These details were underpinned by five objectives which served the three stakeholders in the site. Those for the University included commercial potential, knowledge transfer and image and reputation; those for the town primarily related to economic development and the plan was to help tenants gain a competitive advantage by locating on the site. In addition a number of success indicators were defined for the project against which to measure performance and have remained as a useful set of parameters on which to base the assessment of the performance of the site. In combination with these indicators a further analysis deals with the success factors that are considered as important in influencing performance. The paper sets details the history of the park and covers the success indicators and factors and reviews these in the context of the original objectives for the site.