• 제목/요약/키워드: Parametric Quantity and Cost Take-Off

검색결과 3건 처리시간 0.016초

Surface 및 Solid 방식의 비교를 통한 Parametric 기법의 토공물량산출 방법 (Parametric Quantity Take-Off of Earthwork by Comparing the Use of Surface and Solid Models)

  • 황희석;이재홍;김태영
    • 한국BIM학회 논문집
    • /
    • 제8권1호
    • /
    • pp.56-62
    • /
    • 2018
  • There exists no precedented case of quantity take-off, using parametric modeling, from BIM-based irregular structures. Civil 3D provides earthwork quantity take-off based on surface modeling. Generally, designers should enter data into the specification additionally after extracting quantity estimation from earthwork modeling design. The objective of this report is to suggest the method from quantity take-off to specification of BIM-based earthwork quantities. We intend to investigate earthwork take-off method by Civil3D and explain why parametric information extraction is required for quantity estimation and specification and how information of earthwork quantity based on solid and surface modeling is connected to open quantity take-off module. It is highly expected that this suggestion would be the practical methodology of earthwork quantity take-off and specification in the field of civil engineering.

A measure for activating BIM by actual application analysis of integrated utilization process of quantity, process(4D), and construction cost(5D) in view of life-cycle

  • Lee, Jae-Hong;Kim, Tae-Young
    • 한국컴퓨터정보학회논문지
    • /
    • 제25권12호
    • /
    • pp.1-15
    • /
    • 2020
  • 본 논문에서는 토목 분야 설계와 시공 단계에서의 기존의 2D 프로세스들을 향후 BIM 방식의 프로세스들로 전환하기 위한 새로운 방법을 제안한다. 먼저, 생애주기 관점의 토공 및 도로 구조물의 BIM 설계와 시공 단계에서의 수량-공정(4D)-공사비(5D) 연계 활용의 전체 프로세스에 대하여 기존 2D 방식의 성과품과 3D BIM 방식의 성과품들의 실적용 과정을 비교 분석한다. 제안하는 방법은 IFC 국제 공통 표준 파일 정보와 CBS/OBS/WBS 표준 분류 체계 정보를 연계하여 설계 단계의 성과품을 만들고 수량-공정(4D)-공사비(5D) 연계 활용 모듈을 활용하여 시공 단계의 성과품을 만든다. 궁극적으로는 제안하는 방법을 사용하여 토목 분야 BIM 설계와 시공의 단계별 기술들을 상용화하고자 한다.

A Development of Unified and Consistent BIM Database for Integrated Use of BIM-based Quantities, Process, and Construction Costs in Civil Engineering

  • Lee, Jae-Hong;Lee, Sung-Woo;Kim, Tae-Young
    • 한국컴퓨터정보학회논문지
    • /
    • 제24권2호
    • /
    • pp.127-137
    • /
    • 2019
  • In this study, we have developed a calculation system for BIM-based quantities, 4D process, and 5D construction costs, by integrating object shape attributes and the standard classification system which consist of Cost Breakdown System(CBS), Object Breakdown System(OBS) and Work Breakdown System(WBS) in order to use for the 4 dimensional process control of roads and rivers. First, a new BIM library database connected with the BIM library shape objects was built according to the CBS/OBS/WBS standard classification system of the civil engineering field, and a integrated database system of BIM-based quantities, process(4D), and construction costs(5D) for roads and rivers was constructed. Nextly, the process classification system and the cost classification system were automatically disassembled to the BIM objects consisting of the Revit-family style elements. Finally, we added functions for automatically generating four dimensional activities and generating a automatic cost statement according to the combination of WBS and CBS classification system The ultimate goal of this study was to extend the integrated quantities, process(4D), and construction costs(5D) system for new roads and rivers, enabling the integrated use of process(4D) and construction costs(5D) in the design and construction stage, based on the tasks described above.