• 제목/요약/키워드: Parallel-Machine Scheduling

검색결과 89건 처리시간 0.025초

동일한 병렬기계 일정계획에서 평균지연시간의 최소화를 위한 Tabu Search 방법 (Applying Tabu Search to Minimize Mean Tardiness in the Parallel Machine Scheduling)

  • 전태웅;강맹규
    • 산업경영시스템학회지
    • /
    • 제18권35호
    • /
    • pp.107-114
    • /
    • 1995
  • This paper proposes the Tabu Search algorithm to minimize mean tardiness in the parallel machine scheduling problem. The algorithm reduces the computation time by employing restricted neighborhood and produces an efficient solution in this problem.

  • PDF

이종병렬기계생산의 일정계획지원 시스템 (A Scheduling Support System for Non-identical Parallel Machine Lines)

  • 정남기;정민영
    • 경영과학
    • /
    • 제17권2호
    • /
    • pp.67-73
    • /
    • 2000
  • This paper describes a scheduling support system for a plant where the machine environment may be modeled as non-identical parallel machine lines (NPML). That is, there are a number of stages in series with various different-capability-machines at each stage. Arriving continuously are jobs with their specific due dates, processing times and candidate processing machines. We’ve developed a real-time scheduling module in conjunction with a supporting production information system which supplies necessary data to the module. This scheduling module is one of the 9 modules in this system, and is composed of both a scheduling interface and a production monitoring interface. This module allows users to generate many candidate schedules by selecting their business policies. The selective arguments which are available consist of allocation costs, batch sizes and machine selection intervals. They are now being implemented at a powder metallurgy plant.

  • PDF

작업투입시점과 순서의존적인 준비시간이 존재하는 병렬기계 일정계획을 위한 개선 개미군집 시스템 (An Improved Ant Colony System for Parallel-Machine Scheduling Problem with Job Release Times and Sequence-Dependent Setup Times)

  • 주철민
    • 대한산업공학회지
    • /
    • 제35권4호
    • /
    • pp.218-225
    • /
    • 2009
  • This paper considers a parallel-machine scheduling problem with job release times and sequence-dependent setup times. The objective of this problem is to determine the allocation policy of jobs and the scheduling policy of machines so as to minimize the weighted sum of setup times, delay times, and tardy times. A mathematical model for optimal solution is derived and a meta heuristic algorithm based on the improved ant colony system is proposed in this paper. The performance of the meta heuristic algorithm is evaluated through compare with optimal solutions using randomly generated several examples.

주어진 구간내의 기계에서만 생산 가능한 병렬기계문제에 대한 2-근사 알고리듬 (2-Approximation Algorithm for Parallel Machine Scheduling with Consecutive Eligibility)

  • 황학진;김규태
    • 대한산업공학회지
    • /
    • 제29권3호
    • /
    • pp.190-196
    • /
    • 2003
  • We consider the problem of scheduling n jobs on m machines with the objective of minimizing makespan. Each job cannot be eligible to all the machines but to its consecutively eligible set of machines. For this problem, a 2-approximation algorithm, MFFH, is developed. In addition, an example is presented to show the tightness of the algorithm.

병렬 기계 공정에서 일정 계획과 투입 계획을 고려한 납기 산정에 관한 연구 (Order Promising Methods Considering Scheduling and Order Releasing in Parallel Machine Shops)

  • 심상오;이근철
    • 경영과학
    • /
    • 제29권3호
    • /
    • pp.157-168
    • /
    • 2012
  • In this study, we consider an order promising problem at parallel machine shops where orders arrive dynamically. We develop methods for the problem, which instantly quote the due-dates of arrived orders. In this study, we first propose methods which can estimate flow times of orders, in which the current and future inventory status as well as the specific scheduling scheme used in the shop are taken into account, and then the due-dates are set by the order promising methods using the estimation results. The quoted due-dates of orders are compared with the actual completion times of those which are obtained from the simulation runs. The series of computational experiments show that the superior performance of the proposed methods in terms of the accuracy of due-date quotation.

순서 독립적인 셋업타임을 가진 동일작업의 병렬기계 배치스케줄링 (Parallel Machine Scheduling with Identical Jobs and Sequence-Independent Setup Times)

  • 최병천;박명주
    • 한국경영과학회지
    • /
    • 제39권3호
    • /
    • pp.83-91
    • /
    • 2014
  • We consider the problem of scheduling identical jobs with sequence-independent setup times on parallel machines. The objective is to minimize total completion times. We present the pseudopolynomial-time algorithm for the case with a fixed number of machines and an efficient approximation algorithm for our problem with identical setup times, which is known to be NP-hard even for the two-machine case.

중소 제조기업을 위한 엑셀기반 스케쥴링 시스템 (An Excel-Based Scheduling System for a Small and Medium Sized Manufacturing Factory)

  • 이창수;최경일;송영효
    • 품질경영학회지
    • /
    • 제36권2호
    • /
    • pp.28-35
    • /
    • 2008
  • This study deals with an Excel-based scheduling system for a small and medium sized manufacturing factory without sufficient capability for managing full-scale information systems. The factory has the bottleneck with identical machines and unique batching characteristics. The scheduling problem is formulated as a variation of the parallel-machine scheduling system. It can be solved by a two-phase method: the first phase with an ant colony optimization (ACO) heuristic for order grouping and the second phase with a mixed integer programming (MIP) algorithm for scheduling groups on machines.

이종 병렬설비에서 총납기지연 최소화를 위한 강화학습 기반 일정계획 알고리즘 (Scheduling Algorithm, Based on Reinforcement Learning for Minimizing Total Tardiness in Unrelated Parallel Machines)

  • 이태희;김재곤;유우식
    • 대한안전경영과학회지
    • /
    • 제25권4호
    • /
    • pp.131-140
    • /
    • 2023
  • This paper proposes an algorithm for the Unrelated Parallel Machine Scheduling Problem(UPMSP) without setup times, aiming to minimize total tardiness. As an NP-hard problem, the UPMSP is hard to get an optimal solution. Consequently, practical scenarios are solved by relying on operator's experiences or simple heuristic approaches. The proposed algorithm has adapted two methods: a policy network method, based on Transformer to compute the correlation between individual jobs and machines, and another method to train the network with a reinforcement learning algorithm based on the REINFORCE with Baseline algorithm. The proposed algorithm was evaluated on randomly generated problems and the results were compared with those obtained using CPLEX, as well as three scheduling algorithms. This paper confirms that the proposed algorithm outperforms the comparison algorithms, as evidenced by the test results.

이종병렬기계로 구성된 변압기 권선공정의 생산일정계획 (A Heuristic Scheduling Algorithm for Transformer Winding Process with Non-identical Parallel Machines)

  • 박창권;장길상;이동현
    • 산업경영시스템학회지
    • /
    • 제26권2호
    • /
    • pp.35-41
    • /
    • 2003
  • This paper proposes a heuristic scheduling algorithm to satisfy the customer's due date in the production process under make to order environment. The goal is to achieve the machine scheduling in the transformer winding process, in which consists of parallel machines with different machine performances. The winding is important production process in the transformer manufacturing company. The efficiency of the winding machines is different according to the voltage capacity and the winding type. This paper introduces a heuristic approach in the transformer winding process where the objective function is to minimize the total tardiness of jobs over due dates. The numerical experiment is illustrated to evaluate the performance.

시뮬레이티드 어닐링을 이용한 이종병렬기계에서의 일정계획 수립 (Job Scheduling for Nonidentical Parallel Machines Using Simulated Annealing)

  • 김경희;나동길;박문원;김동원
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2000년도 춘계공동학술대회 논문집
    • /
    • pp.90-93
    • /
    • 2000
  • This paper presents job scheduling for non-identical parallel machines using Simulated Annealing (SA). The scheduling problem accounts for allotting work parts of L lots into M parallel machines, where each lot is composed of N homogeneous jobs. Some lots may have different jobs while every job within each lot has common due date. Each machine has its own performance and set up time according to the features of the machine, and also by job types. A meta-heuristic, SA, is applied in this study to determine the job sequences of the scheduling problem so as to minimize total tardiness of due. The SA method is compared with a conventional steepest descent(SD) algorithm that is a typical tool for finding local optimum. The comparison shows the SA is much better than the SD in terms tardiness while SA takes longer , but acceptable time.

  • PDF