• 제목/요약/키워드: Parallel Testing

검색결과 231건 처리시간 0.022초

Applying Parallel Processing Technique in Parallel Circuit Testing Application for improve Circuit Test Ability in Circuit manufacturing

  • Prabhavat, Sittiporn;Nilagupta, Pradondet
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2005년도 ICCAS
    • /
    • pp.792-793
    • /
    • 2005
  • Circuit testing process is very important in IC Manufacturing there are two ways in research for circuit testing improvement. These are ATPG Tool Design and Test simulation application. We are interested in how to use parallel technique such as one-side communication, parallel IO and dynamic Process with data partition for circuit testing improvement and we use one-side communication technique in this paper. The parallel ATPG Tool can reduce the test pattern sets of the circuit that is designed in laboratory for make sure that the fault is not occur. After that, we use result for parallel circuit test simulation to find fault between designed circuit and tested circuit. From the experiment, We use less execution time than non-parallel Process. And we can set more parameter for less test size. Previous experiment we can't do it because some parameter will affect much waste time. But in the research, if we use the best ATPG Tool can optimize to least test sets and parallel circuit testing application will not work. Because there are too little test set for circuit testing application. In this paper we use a standard sequential circuit of ISCAS89.

  • PDF

전력 조류 계산의 분산 병렬처리기법에 관한 연구 (A Development of Distributed Parallel Processing algorithm for Power Flow analysis)

  • 이춘모;이해기
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 학술대회 논문집 전문대학교육위원
    • /
    • pp.134-140
    • /
    • 2001
  • Parallel processing has the potential to be cost effectively used on computationally intense power system problems. But this technology is not still available is not only parallel computer but also parallel processing scheme. Testing these algorithms to ensure accuracy, and evaluation of their performance is also an issue. Although a significant amount of parallel algorithms of power system problem have been developed in last decade, actual testing on processor architectures lies in the beginning stages. This paper presents the parallel processing algorithm to supply the base being able to treat power flow by newton's method by the distributed memory type parallel computer. This method is to assign and to compute teared blocks of sparse matrix at each parallel processors. The testing to insure accuracy of developed method have been done on serial computer by trying to simulate a parallel environment.

  • PDF

전력 조류 계산의 병렬처리에 관한 연구 (A Development of Parallel Processing for Power Flow analysis)

  • 이춘모
    • 전기학회논문지P
    • /
    • 제51권2호
    • /
    • pp.55-59
    • /
    • 2002
  • Parallel processing is able to be used effectively on computationally intense power system problems. But this technology is not still available is not only parallel computer but also parallel processing scheme. Testing these algorithms to ensure accuracy, and evaluation of their performance is also an issue. Although a significant amount of parallel algorithms of power system problem have been developed in last decade, actual testing on parallel computer architectures lies in the beginning stages because no clear cut paths. This paper presents Jacobian modeling method to supply the base being able to treat power flow by newton's method by the computer. This method is to assign and to compute teared blocks of sparse matrix at each parallel processors. The testing to insure accuracy of developed method have been done on serial computer by trying to simulate a parallel environment.

무기체계 오류 검증을 위한 실시간 시스템 병렬시험 기법 (Real-Time System Parallel Testing Techniques for Weapon System Error Verification)

  • 김동준
    • 전자공학회논문지
    • /
    • 제53권11호
    • /
    • pp.130-138
    • /
    • 2016
  • 본 논문은 무기체계의 오류를 검증할 때 필요한 실시간 시스템 병렬시험 기법에 대해서 제안한다. 이전에 국방분야에서 사용되는 야전시험장비는 무기체계를 순차적으로 검증하는 방식을 사용하였다. 오류를 순차적으로 검증하는 방식은 내부유닛간의 상호 간섭에 의한 부분의 오류검증은 할 수 없었다. 이러한 이유로 인해 본 논문에는 기존에 무기체계 오류 검증 시 사용되는 순차적 시험기법이 아닌 임베디드 장치를 이용한 실시간 시스템 병렬시험 기법을 제안한다. 임베디드 모듈이 탑재된 스위칭 제어카드는 병렬시험을 수행하고 그 결과를 사용자의 제어장치로 전달한다. 이러한 방식은 기존의 방식에 비해 좀 더 정확하게 무기체계 내부의 상호 간섭에 대한 오류 검증을 할 수 있다.

병렬팽창 냉동시스템의 성능실험에 관한 실험적 연구 (An Experimental Study on the Performance Testing of Parallel Expansion Refrigeration System)

  • 구창대
    • 한국산업융합학회 논문집
    • /
    • 제14권2호
    • /
    • pp.79-85
    • /
    • 2011
  • This study has been experimented about refrigeration capacity difference. It has been used 3 method, Manual expansion valve, thermostatic expansion valve and capillary expansion valve, and tested under the same condition by using the performance testing of parallel expansion. In temperature change of the temperature room, thermostatic expansion valve method displayed the most lower temperature, $-18^{\circ}C$. In addition, the temperature, just before the expansion, also displayed the best result which was $4^{\circ}C$ lower than other expansion valve. In these results, it can be used for performance testing of parallel expansion refrigeration system.

인터넷을 이용한 면진 교량의 원격 병렬 유사동적실험 (Remote Parallel Pseudo-dynamic Testings Using Internet on Base-Isolated Bridge)

  • Chung-Bang. Yun;Park, Dong-Uk.;Eiichi Watanabe;Kazutoshi Nagata
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2003년도 봄 학술발표회 논문집
    • /
    • pp.521-528
    • /
    • 2003
  • This paper presents the results of a cooperative research on remote parallel pseudo-dynamic testing on a base-isolated bridge with multiple piers using Internet between KAIST, Korea and Kyoto Univ., Japan. Experimental facilities located at two institutions were parallelly used to test the nonlinear behavior of the base-isolators. Two data communication schemes for parallel tests were developed and the performance is compared. The results indicate that the elapsed time may vary widely depending on the data communication and testing schemes : i.e. 1-25sec for each time step. But it is fairly comparable with the time required for pseudo-dynamic testing. The testing method can become more powerful, as the data communication and monitoring techniques through Internet improve further.

  • PDF

병렬 운동 기구의 미끄럼 볼 조인트 개발에 관한 연구 (A Study on the Sliding Ball Joint of Parallel Kinematic Mechanism)

  • 유대원;이재학
    • 대한기계학회논문집A
    • /
    • 제33권9호
    • /
    • pp.982-989
    • /
    • 2009
  • Parallel Kinematic Mechanism (PKM) is a device to perform the various motion in three-dimensional space and it calls for six degree of freedom. For example, Parallel Kinematic Mechanism is applied to machine tools, medical equipments, MEMS, virtual reality devices and flight motion simulators. Recently, many companies have tried to develop new Parallel Kinematic Mechanism in order to improve the cycle time and the precisional tolerance. Parallel Kinematic Mechanism uses general universal joint and spherical joint, but such joints have accumulated tolerance problems. Therefore, it causes position control problem and dramatically life time reduction. This paper focused on the rolling element to improve sliding precision in new sliding ball joint development. Before the final design and production, it was confirmed that new sliding ball joint held a higher load and a good geometrical structure. FEM analysis showed a favorable agreement with tensile and compressive testing results by universal testing machine. In conclusions, a new sliding ball joint has been developed to solve a problem of accumulated tolerance and verified using tensile and compressive testing as well as FEM analysis.

MPI-GWAS: a supercomputing-aided permutation approach for genome-wide association studies

  • Paik, Hyojung;Cho, Yongseong;Cho, Seong Beom;Kwon, Oh-Kyoung
    • Genomics & Informatics
    • /
    • 제20권1호
    • /
    • pp.14.1-14.4
    • /
    • 2022
  • Permutation testing is a robust and popular approach for significance testing in genomic research that has the advantage of reducing inflated type 1 error rates; however, its computational cost is notorious in genome-wide association studies (GWAS). Here, we developed a supercomputing-aided approach to accelerate the permutation testing for GWAS, based on the message-passing interface (MPI) on parallel computing architecture. Our application, called MPI-GWAS, conducts MPI-based permutation testing using a parallel computing approach with our supercomputing system, Nurion (8,305 compute nodes, and 563,740 central processing units [CPUs]). For 107 permutations of one locus in MPI-GWAS, it was calculated in 600 s using 2,720 CPU cores. For 107 permutations of ~30,000-50,000 loci in over 7,000 subjects, the total elapsed time was ~4 days in the Nurion supercomputer. Thus, MPI-GWAS enables us to feasibly compute the permutation-based GWAS within a reason-able time by harnessing the power of parallel computing resources.

NOC 인터커넥트를 활용한 메모리 반도체 병렬 테스트 효율성 개선 (Improving Parallel Testing Efficiency of Memory Chips using NOC Interconnect)

  • 홍찬의;안진호
    • 전기학회논문지
    • /
    • 제68권2호
    • /
    • pp.364-369
    • /
    • 2019
  • Generally, since memory chips should be tested all, considering its volume, the reduction in test time for detecting faults plays an important role in reducing the overall production cost. The parallel testing of chips in one ATE is a competitive solution to solve it. In this paper, NOC is proposed as test interface architecture between DUTs and ATE. Because NOC can be extended freely, there is no limit on the number of DUTs tested at the same time. Thus, more memory can be tested with the same bandwidth of ATE. Furthermore, the proposed NOC-based parallel test method can increase the efficiency of channel usage by packet type data transmission.

인터넷을 이용한 원격병렬 유사동적실험 : 면진교량에 대하여 (Remote Parallel Pseudo-Dynamic Testings Using Internet on Base Isolated Bridge)

  • 윤정방;김재민;김남식;심종민;구기영
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2000년도 봄 학술발표회논문집
    • /
    • pp.304-307
    • /
    • 2000
  • This paper presents a numerical simulation study for remote parallel pseudo-dynamic testings using Internet. In this testing method, experimental facilities located at different places can be parallelly used for testing a large-scale structure with many components subjected to severe nonlinear behavior. Example analysis is carried out on a base- isolated bridge for earthquake loading. The results indicate that the time required for data communication between two facilities located 250km apart through Internet for t 000 time steps is about 20 minutes, which is fairly equivalent to the time required for pseudo-dynamic testing. This testing method can be more powerful, as the data transmitting technique through Internet improves.

  • PDF