This paper describes the Utility Interactive PV (UIPV) system which can improve the peak-cut effect by adding an energy storage device of batteries to the power converter. The proposed system has three possible operation modes depending on relative condition of PV output, which can have the power shaping function covering the peak power for 3 hours. A new power circuit and an application algorithm have been applied to the UIPV system which is based on working PV system during a 3-hour peak time. The energy relationship by the proposed system is analyzed theoretically and experimentally. The proposed system is evaluated at the viewpoint of cost and total spacing, which enables the proposed UIPV system to have the reduction of the peak power demand and hence to improve the power capacity of peak cut.
Islanding of PV systems occurs when the utility grid is removed but local sources continue to operate and provide power to local loads. Islanding is one of the serious problems in an electric power system connected with dispersed power sources. Also, this can present safety hazards and the possibility of damage to other electric equipments. If the real and reactive power of RLC load and PV system are closely matched, islanding phenomena can't be detected by the passive methods. Several active methods were proposed to detect islanding phenomena. The most effective method is SFS method which was suggested by Sandia National Laboratory. In this paper, a new anti-islanding algorithm is proposed and its validity is verified through simulation and experimental results for utility interconnection of PV system.
This study aims to evaluate application of a heat recovery ventilator(HRV) using photovoltaic(PV) system. To this end, we analyzed performance of a PV system, which it was evaluated by monthly power wattage and conversion efficiency according to design capacity of a HRV. The results of this study can be summarized as follows. (1) A conversion efficiency of the PCS was evaluated about 86% in rated power. (2) A maximum, minimum and average output power were respectively analyzed 49.2W, 47.3W, and 48.8W. (3) Total power wattage of 200W PV system was 211kW and it was 316kW in case of 300W PV system. (4) Insufficient electrical power of a duct and window type ventilation system was respectively calculated 133.5kW and 147.7kW.
So J.H.;Jung Y.S.;Yu G.J.;Jung M.W.;Kang G.H.;Choi J.Y.
Proceedings of the KIPE Conference
/
2003.07b
/
pp.516-519
/
2003
3kW photovoltaic (PV) systems and data acquisition system are constructed for performance analysis of PV system at field demonstration test center (FDTC) of Korea. As climatic and irradiation conditions are varied, the performance characteristics of PV system are collected and analyzed in data acquisition system. From these results, the performances of gird-connected power conditioning system (PCS) fur PV system have been evaluated and analyzed. Furthermore, performance indices of grid-connected PCS e.g. output power, efficiency, loss factor, and the other index at the site are reviewed.
In order to increase the power generation efficiency of the photovoltaic system, a new algorithm that can follow the maximum power point of the photovoltaic power generation system having nonlinear output characteristics is proposed. Conventional maximum power point tracking (MPPT) algorithms such as Perturbation and Observation (P&O) and InCond (Increment and Conductance) schemes can not find the global maximum power point at a plurality of pole points in the unmatched state of unbalanced PV modules. However, even if the global maximum power point is found at a plurality of pole points, the global maximum power that can not be the real maximum power by the photovoltaic generation system. In order to solve this problem, a few PV companies propose installing several small PV inverters instead of if big one. However, since this will require additional costs, we herein propose a Multi-MPPT system using individual 3-point MPPT to track true MPPT at a plurality of pole points in the unmatched state of unbalanced PV modules.
PV 시뮬레이터는 제한된 공간에서 PCS(Power Conditioning System)의 성능을 평가하거나, 고장유무를 검사하는데 필수적인 장비이다. PV 시뮬레이터가 PV 어레이와 동일한 동작을 하기 위해서는 다양한 재질의 PV cell에 대하여 모델링이 가능해야한다. 본 논문은 EN50530에 규정되어 있는 최대전력운 전범위인 $V_{MPP}{\pm}10%$ 구간에서 발생하는 오차를 다른 PV cell 모델링 알고리즘과 비교하고 제안한 알고리즘의 우수함을 증명하였다.
Seo, Hyo-Ryong;Kim, Kyung-Hun;Park, Min-Won;Yu, In-Keun
Proceedings of the KIEE Conference
/
2007.07a
/
pp.212-213
/
2007
Grid-connected PV(Photovoltaic) power generation system has experienced increasing attention in recent years. But the growing number of non-linear equipments, such as, inverters, has been demanding the compensation for the disturbances caused by them. These non-linear loads may cause poor power factor and high degree of harmonics. Installation of an AF(active filter) can be one of the solutions to mitigate the line distortion, but it requires additional costs. On the other hand, many PV systems have been interconnected to the distribution system. So, the PV system combined with the function of the active filter system can be useful for the application in the power distribution system. In this paper, PV-AF system using DSP (Digital Signal Processing) controller confirmed that it is possible to combine the AF theory to the three phase PV system connected to the utility under various irradiation conditions.
Park, Eun Bee;Cho, Geun Yuoung;Cho, Sung Bae;Kim, Hyun Jun;Yu, Jeong Jae;Park, Chi Hong
Current Photovoltaic Research
/
v.4
no.4
/
pp.159-163
/
2016
Piled snow upon PV module interferes with Photoelectric Effect process through photovoltaic directly. As a result of this phenomenon, its generation efficiencies keep decreasing or are stuck at zero power generating status. In addition, PV facilities have been installed on those places such as water surface, roof-top, and other isolated places, dealing with conditions of "Securing high REC weighted value", "Difficulty of securing land" and so forth. Through this study, we are able to actualize the function of heating over PV modules when it snows. We adopted laminating method through heating film and modules, guaranteeing warranty more than for 25 years. Also we are trying remote control systemically, not by hardware control, to run parallel with automatic driving and monitoring system which enable to control operation time, insolation, amount of snowfall automatically. We applied analysis of actual proof to both snow removal PV system and general PV power system, and these led to bear power consumption analysis while snow-removing, and its comparison after finishing the task as "One stone, two birds." In the long run, we could carry out economic analysis against snow removal system, and this helps to verify the most maximized control method for snow removal conditons on a basis of weather information. this study shall let prevent people from negligent accidents, and improve power generation problems as mentioned from the top. Ultimately, we expect to apply this system to heavy snowfall regions in winter season in spite of its limited system installaion in Korean territory, initially.
Journal of the Architectural Institute of Korea Structure & Construction
/
v.35
no.8
/
pp.177-184
/
2019
Recently, electric power usages and peak loads from buildings are increasing due to higher outdoor air temperatures and/or abnormal climate during the summer period. As one of the eco-friendly measures, a renewable energy system has been received much attention. Particularly, interest on a photovoltaic (PV) system using solar energy has been rapidly increasing in a building sector due to its broad applicability. In using the PV system, one of important factors is the PV efficiency. The normal PV efficiency is determined based on the STC(Standard Test Condition) and the NOCT(Nominal Operating Cell Temperature) performance test. However, the actual PV efficiency is affected by the temperature change at the module surface. Especially, higher module temperatures generally reduce the PV efficiency, and it leads to less power generation from the PV system. Therefore, the analysis of the relation between the module temperature and PV efficiency is required to evaluate the PV performance during the summer period. This study investigates existing algorithms for calculating module surface temperatures and analyzes resultant errors with the algorithms by comparing the measured module temperatures.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.27
no.2
/
pp.14-21
/
2013
Today, energy problem has become an important issue, and a development of renewable energy is urgent. In architectural fields, a research of the energy efficient lighting system using renewable energy is in progress. The energy efficient lighting system could be realized by integrating a daylight responsive LED lighting control system and a blind PV system. This system is able to save and generate electric energy. Efficiency of this system depends on control methods of blind PV. As a preliminary research, this research analyzed power generation and inflow of available daylight according to control method of blind PV.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.