• Title/Summary/Keyword: PV capacity

Search Result 188, Processing Time 0.025 seconds

Re-estimation of PV hosting capacity by improving parameters for voltage controls of the smart inverter (스마트인버터 전압제어의 파라미터 개선을 통한 PV hosting capacity 재추정 방법)

  • Juhyeon Kim;Gihwan Yoon;Yoondong Sung;Hak-Geun Jeong;Jongbok Baek;Moses Kang
    • Journal of IKEEE
    • /
    • v.27 no.4
    • /
    • pp.657-667
    • /
    • 2023
  • This paper proposes two-stage optimization framework to re-estimate the photovoltaic (PV) hosting capacity (HC) by improving parameters for voltage controls of the smart inverter. In the first stage, PV HC is estimated considering Volt-Var (VV) and Volt-Watt (VW) controls, aligning with IEEE Std 1547-2018 guidelines. In the second stage, adjust parameters of VV and VW to improve HC. To investigate the performance of the proposed algorithm, simulations conducted using OpenDSS on an IEEE 37-bus system. The results demonstrate that effectively increases PV HC.

An Optimal Decision Model for Capacity and Inclining Angle of Residential Photovoltaic Systems (주택용 태양광발전시스템의 적정 용량 및 설치각 선정을 위한 최적화 모델 연구)

  • Jeon, Jeong-Pyo;Kim, Kwang-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.6
    • /
    • pp.1046-1052
    • /
    • 2010
  • In residential house, photovoltaic (PV) system among various alternatives in renewable energy system is the most efficient and feasible solution for reducing energy consumption and electricity cost. However, relatively high initial cost make people reluctant to install PV system in their houses. Therefore, in the initial state for PV system installation in the house, it is very important to decide proper capacity of the PV system considering the expected energy usage and solar energy supplying condition with the house. This paper proposes a novel optimization model for deciding appropriate capacity of the PV system for residential house. The objective function of the model is to minimize the annual cost including electricity bill, operation and maintenance cost, and annual fixed cost calculated from the initial installation cost based on capital recovery factor (CRF). The model also shows the optimal inclining angle of PV panels of the system. In this paper, we estimate the PV output using PVWATTS (PV simulator of Office of Energy Efficiency and Renewable Energy) and find optimal solutions by Sequential Quadratic Programming (SQP) method using MATLAB software. The proposed approach is finally applied to a residential model house in Gangneung, Gangwon-Do and verified its feasibility for adopting to PV system design for residential houses.

Study on the Elicitation of Parameter in Designing each Capacity of PV System for Power Industry (전력산업용 PV System의 각 용량별 설계 파라미터 도출에 관한 연구)

  • Kim, ByeongMan;Lee, KilSong;Yang, YeonWon;Shin, HyunWoo;Kim, EuiHwan
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.78.1-78.1
    • /
    • 2010
  • Recently, as much supplied with new-renewable energy, as much invested in PV system. PV system consists of PV module, PCS and Monitering system, and also could be classified into the type and the capacity by installation method and cost etc. When various systems are installed in the field, it is needed to research for applying in the field and establish infrastructure in order to ensure stable efficiency and reliability. In this study, as the basic design of the demonstration test facility, it is designed the basic PV systems for each capacity to test each PCS. In addition, It is drew the climatic conditions such as insolation, temperature and the design parameters such as installation angle, shades for the local demonstration project and expected the generation of each PV system.

  • PDF

A Study on the Algorithm for Interconnection of PV System on Power Distribution System Considering Reliability (신뢰도를 고려한 태양광시스템의 배전계통 연계 알고리즘에 관한 연구)

  • Moon, Jong-Fil
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.60 no.4
    • /
    • pp.241-245
    • /
    • 2011
  • In this paper, when photovoltaic (PV) systems are connected to power distribution system, most effective capacity and connected-point of PV system are presented considering power distribution system reliability. The reliability model of PV system is presented considering the duration of sunshine. Also the model of time-varying load and reliability test system bus2 model are used. To simulate the effects of PV system, various cases are selected; (1) base case which is no connection of PV system to power distribution system when faults are occurred, (2) 3MW case which is 3[MW] connection of PV system (3) 4[MW] case, and (4) 20[MW] case which is 20[MW] connection of PV system to the bus of power distribution system. The capacity limit of connected PV system is settled to 14[MW] for all cases except case 4. The reliability for residential, general, industrial, and educational customer is evaluated.

A Study on Enhancement Method of Hosting Capacity for PV System Based on Primary Feeder Reconfiguration (배전선로 절체에 의한 태양광전원의 수용성 향상방안에 관한 연구)

  • Lee, Myung-Geun;Lee, Hu-Dong;Ferreira, Marito;Park, Ji-Hyun;Tae, Dong-Hyun;Rho, Dae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.11
    • /
    • pp.239-249
    • /
    • 2019
  • Recently, the Korean government has implemented a policy to expand renewable energy sources. Large-scale PV systems are being actively interconnected with the distribution system. On the other hand, when a large-scale PV system is installed and operated, the customer voltages could violate the allowable voltage limit due to reverse power flow of the PV system. To overcome these problems, an enhancement method for hosting the capacity of the PV system in a distribution system is being actively conducted. Therefore, to improve the hosting capacity of the PV system, this paper proposes a model of a reconfiguration of the distribution system, which is composed of three sections and three connections based on PSCAD/EMTDC S/W, and proposes an evaluation algorithm for the feeder reconfiguration to maximize an adaption of the PV system. In addition, this paper presents the optimal method of the feeder reconfiguration section to evaluate the maximum capacity of the PV system to keep customer voltages within the allowable voltage limits based on various operation scenarios, such as the capacity of a PV system and section of feeder reconfiguration. From the simulation results based on the PSCAD/EMTDC modeling and evaluation algorithm, it was confirmed that they are a useful and practical tool to enhance hosting the capacity of a PV system in a distribution system.

Ripened Persimmon Vinegar with Mountain-cultivated Ginseng Ingestion Reduce Blood Lipids and Enhance Anti-oxidants Capacity in Rats (산양삼 혼입숙성 감식초 섭취에 의한 흰쥐의 혈중지질 감소와 항산화능 개선)

  • Jeon, Byung-Duk;Kim, Pan-Gi;Ryu, Sungpil
    • Journal of Korean Society of Forest Science
    • /
    • v.102 no.2
    • /
    • pp.182-188
    • /
    • 2013
  • In this study we investigated that the mountain-cultivated ginseng into persimmon vinegar fused material on blood lipids and anti-oxidant capacity in rats. A 4-year-old mountain-cultivated ginseng was ripened with 4-year-matured persimmon vinegar, and then it was diluted 5 times and orally administerd to rats. The rats were divided into a control group (CON), a persimmon vinegar group (PV) and a mountain-cultivated ginseng + persimmon vinegar fusion material group (MPV). The body weight was found to be low in MPV, and amount of the stored fats were also low in PV and MPV. Blood lipids were found to be low in PV and MPV compared to the CON. HDL-C (high density lipoprotein cholesterol) was found to be significantly high in these two groups. Liver Cu,Zn-SOD (superoxide dismutase) and GPx (glutathione peroxidase) were CON < PV < MPV, in sequence, with significance. Especially, it was the highest in MPV. Liver MDA (malondialdehyde) concent was MPV < PV, CON, in sequence, with significance. These results suggested that the fusion material lowers blood lipids and enhance anti-oxidant capacity. We carefully thought that it might be used effectively as a health food.

Economy Analysis and Optimized Capacity Evaluation of Photovoltaic-Related Energy Storage System (태양광 에너지저장장치(ESS) 경제성 분석 및 최적 용량 평가)

  • Lee, Young-Hun;Sung, Tae-Hyun
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.2_2
    • /
    • pp.209-218
    • /
    • 2022
  • The purpose of this study is to analyze an economic assessment of PV-ESS systems based on the power generation performance data of solar power (PV) operating in domestic area, and to calculate the optimal capacity of the energy storage system. In this study, PVs in Gyeonggi-do, Jeollabuk-do, and Gyeongsangbuk-do were targeted, and PVs in this area were assumed to be installed on a general site, and the research was conducted by applying weights based on the facility's capacity. All the analysis was conducted using the actual amount of KPX transactions of PVs in 2019. In order to calculate the optimal capacity of PCS and BESS according to GHI, PV with a minimum/maximum/central value was selected by comparing the solar radiation before the horizontal plane between three years (2017-2019) of the location where PV was installed. As a result of the analysis, in Gyeonggi-do, if the REC weight decreases to 3.4 when there is no change in the cost of installing BESS and PCS, it is more economical to link BESS than PV alone operation of PV. In Jeollabuk-do, it was analyzed that if the REC weight was reduced to 3.6, it was more likely to link BESS than PV operated alone. In Gyeongsangbuk-do, it was analyzed that if the REC weight was reduced to 3.4, it was more likely to link BESS than PV operated alone.

Evaluation algorithm for Hosting Capacity of PV System using LDC Method of Step Voltage Regulator in Distribution Systems (배전계통에 있어서 선로전압조정장치의 LDC방식에 의한 태양광전원의 수용성 향상 평가알고리즘)

  • Lee, Se-Yeon;Lee, Hu-Dong;Tae, Dong-Hyun;Rho, Dae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.7
    • /
    • pp.20-28
    • /
    • 2020
  • According to the 3020 RE (renewable energy) policy of the Korean Government, distributed generators, including PV (photovoltaic) and WP (wind power) systems, have been installed and operated in distribution systems. On the other hand, if large-scale PV systems are interconnected in a distribution system, the spread of PV systems may be postponed due to a reduction of the hosting capacity in PV systems because of the over-voltage phenomena at the customer end by violating the allowable voltage limits. Under these circumstances, this paper proposes an evaluation algorithm of the hosting capacity of a PV system based on the LDC (line drop compensation) method of SVR (step voltage regulator) to improve the hosting capacity when large-scale PV systems are installed in a distribution system. Moreover, this paper presents a modeling of a complex distribution system, which is composed of a large-scale PV system and SVR with the LDC method using PSCAD/EMTDC. The simulation results confirmed that the proposed algorithm and modeling are useful and practical tools for improving the hosting capacity of a PV system because the customer voltages are maintained within the allowable voltage limits even if 6.5[MW] of the PV system is installed in a distribution system with the LDC method of SVR.

Techno-Economic Analysis of Water Electrolysis System Connected with Photovoltaic Power Generation (태양광 발전 연계 수전해 시스템의 경제성 분석)

  • HWANG, SUNCHEOL;PARK, JIN-NAM
    • Journal of Hydrogen and New Energy
    • /
    • v.32 no.6
    • /
    • pp.477-482
    • /
    • 2021
  • Hydrogen production, hydrogen production cost, and utilization rate were calculated assuming four cases of hydrogen production system in combination of photovoltaic power generation (PV), water electrolysis system (WE), battery energy storage system (BESS), and power grid. In the case of using the PV and WE in direct connection, the smaller the capacity of the WE, the higher the capacity factor rate and the lower the hydrogen production cost. When PV and WE are directly connected, hydrogen production occurs intermittently according to time zones and seasons. In addition to the connection of PV and WE, if BESS and power grid connection are added, the capacity factor of WE can be 100%, and stable hydrogen production is possible. If BESS is additionally installed, hydrogen production cost increases due to increase in Capital Expenditures, and Operating Expenditure also increases slightly due to charging and discharging loss. Even in a hydrogen production system that connects PV and WE, linking with power grid is advantageous in terms of stable hydrogen production and improvement of capacity factor.

A Study on the Priority Decision for Interconnection of PV System on Power Distribution System considering Customer Interruption Costs (정전비용 고려한 PV시스템의 배전계통 연계 우선순위 결정에 관한 연구)

  • Son, Chang-Nam;Han, Woon-Dong;Moon, Jong-Fil
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.63 no.3
    • /
    • pp.163-168
    • /
    • 2014
  • In this paper, when photovoltaic systems are connected to distribution system, most effective capacity and location of PV system are studied considering customer interruption costs of power distribution system. The reliability model of PV system considering the duration of sunshine, the model of time-varying load and Roy Billinton test system (bus2 model) are used. To simulate the effects of PV system, various cases are selected; (1) base case which is no connection of PV system to power distribution system when faults are occurred, (2) 3MW case which is 3[MW] connection of PV system (3) 4[MW] case, and (4) 20[MW] case which is 20[MW] connection of PV system to the bus of power distribution system. The capacity limit of connected PV system is settled to 14[MW] for all cases except case 4. The reliability and customer interruption costs for residential, general, industrial, and educational customer is evaluated.