• Title/Summary/Keyword: PROJECT MANAGEMENT

Search Result 7,152, Processing Time 0.032 seconds

A Study on the Integrated Conceptual Model of Software Development Project Management System (소프트웨어 개발을 위한 통합 프로젝트 관리의 개념적 모형에 관한 연구)

  • Mun, Yong-Eun;Lee, Jae-Beom
    • Asia pacific journal of information systems
    • /
    • v.6 no.1
    • /
    • pp.241-267
    • /
    • 1996
  • The problems like exceeding estimated cost, late due-date, expensive maintenance, insuffiency of experts and low productivity are becoming emphasized related with the software development. In order to overcome these problems and to develop the highly qualified software within the limited resources, a project management tool is used. The purpose of this study is to develop a conceptual model of the project management system which can plan, analyze and control the software development projects effectively. The model is constructed with plan and track management system, cost management system and operation management system for the efficient project management. It is named by LSD-PMS : Large-scale Software Development Project Management System. We reviewed 5 cases of project management. LSD-PMS is evaluated and reviewed by the project managers in the field. It is proved that LSD-PMS is a tool which can help project managers develop software successfully given budget and time schedule. In the future, this system should be further developed as an integrated model with system implementation tools such as CASE products.

  • PDF

Development and Application of Integrated Management System in Nuclear Power Plant Construction Project

  • Lee, Sang Hyun;Byon, Su Jin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.700-701
    • /
    • 2015
  • Nuclear power plant construction project can be called essential to establish a systematic project management system compared to other construction projects, taking into account the size and complexity and safety. To develop into a project management system for the Korea situation with the ongoing construction of the nuclear power plant was directed to promote nuclear power project management. In this paper, we introduce a comprehensive project management system for nuclear power projects. Currently considering the nuclear life cycle design, construction, and was developed by considering the flow of information to operate, and test each step linkage. The systems in English were developed to meet owner's requirements for advancing into overseas projects. Another point is that the systems were developed by management module, so that functions of each area can be selectively applied. It is expected that the system will establish itself as one that can be used for the entire lifecycle of nuclear power plants through gradual and systematic establishment of necessary data.

  • PDF

A Study to improve old water supply facilities in Airforce Base through the Smart Water management vs WASCO Project (스마트 물관리 시스템과 WASCO 사업을 통한 공군기지 노후 상수도 개선사업의 실증 연구)

  • Park, Sung-Su;Kim, Chang-Eun
    • Journal of the Korea Safety Management & Science
    • /
    • v.22 no.4
    • /
    • pp.53-64
    • /
    • 2020
  • The purpose of this study is to analyze outcome of the project to improve old water supply facilities in Airforce Base to improve water revenue rate. To achieve the objective of this study, First, literature review is conducted to clearly define the concept of water revenue rate improve project. Second, WASCO project on 2 Airforce base review and smart water management pilot project on 1 Airforce base is conducted. Third, economical analysis of project is conducted to examine the outcome. As a result, WASCO and smart water management pilot project on Airforce base was effective to improve water revenue rate. Finally, the improvements were suggested after investigating the key factors on water revenue rate improve project. In the future, this study will be used as a baseline for developing water revenue rate improve project.

NEW TREND OF SCHEDULING IN LINEAR CONSTRUCTION PROJECT

  • S. Sankar;J. Senthil
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.917-923
    • /
    • 2005
  • Scheduling is one of the main functions in construction project to determine the sequence of activities necessary to complete a project. The scheduling techniques provide important information crucial to a project's success. Highway construction project the paving activity can be considered a linear activity. Linear scheduling technique may be better suited for linear projects than other scheduling techniques. A new type of scheduling in linear project is calling Linear Scheduling Model (LSM). The Project monitoring and controlling is very ease to identify that all the stage of linear project and have more advantages.

  • PDF

A Study on the Impact of the PMS Quality on Performance in Information Systems Project (IS프로젝트에서 PMS 품질이 성과에 미치는 영향에 대한 연구)

  • Jeong, Cheonsu;Ahn, Hyunchul
    • Knowledge Management Research
    • /
    • v.13 no.3
    • /
    • pp.79-103
    • /
    • 2012
  • Recently because the IS development project is large scale and complicated, the necessity of tools that can manage effectively smooth communications and the harmonized project between the interested parties is exposed. According to this fact, many companies are investing enough to the PMS (Project Management System) for the sake of the systematic management of the IS development project, and also this PMS is emerging as one of the indispensable tools for the successful IS development project by casting off from a auxiliary means for the past project management. However, as had been expected, whether the introduction of the PMS is possible to facilitate communications within a project team, and a main motivation that can derive individual performance and organizational performance that participated in the IS development project is induced or not are not verified still empirically and apparently. With respect to this, a survey was conducted to examine how PMS quality affected user satisfaction, communication, individual performance and project performance. The effects of the data gathered were verified by structural equation model analysis.

  • PDF

Exploratory Study on Risk Factors by Project Performance Areas in Software Project Management (정보시스템 프로젝트의 성과영역별 위험요인에 관한 탐색적 연구)

  • Lee Seogjun;Kim HaeJung;Suh Hyunsuk
    • Journal of Information Technology Applications and Management
    • /
    • v.11 no.4
    • /
    • pp.103-120
    • /
    • 2004
  • Identifying validated risk factors in software risk management is imperative for project managers. Although validated risk lists were provided by previous researchers, risk list associated with software project performance areas was not provided as yet. This paper represents a first step toward understanding risk lists by various project performance areas (time, cost, and quality) to help project managers alleviating the possibility of software project failure. Four simultaneous exploratory surveys were conducted with 29 experienced software project managers. Three different risk factor ranking sets for each project performance area were compared with, the risk ranking, which was provided without clarifying specific project performance areas. The risk lists and their corresponding perceived importance were different from previous research results. This implies that identifying risk factors for specific project performance areas can provide additional information for project managers. We concluded by discussing implications of our finds for both research and improving risk management practice.

  • PDF

A Study on Information Strategy Development Using Configuration Management in Large-scale Construction Project (형상관리기법을 활용한 대형 프로젝트 정보화 전략개발)

  • Won, Seo Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.66-67
    • /
    • 2018
  • Large-scale construction projects require various license and technologies for the manufacturing and handling processes. Also, the whole life cycle business process management determines the success of the project. Then, the efficiency of the business conducted by stakeholders and their possessed technology should be enhanced in order to strengthen their competitive power. For this reason, many experts pointed out to focus on the improvement of the life cycle process and efficient management. Since it is very important to keep up-to-date data and utilize it for work during the long-term project to reflect changes in the large-scale project, the most important part of the project management in project is information change management. Therefore, the objective of this study is applying configuration management(CM) technique in order to managing change data generated for planning in early phase. The result of this research will certainly assist the large-scale project managers in the development of information change management system.

  • PDF

Project Cost Management in Construction Industry in Ho Chi Minh City

  • Kim, Soo-Yong;Tuan, Kiet Nguyen;Luu, Van Truong;Le, Tam Thuong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.70-71
    • /
    • 2015
  • Cost management always being the matters for project manager as well as other entities involved the construction projects. Vietnam is emerging country, many construction works were carried out and lot of construction projects will be developed in the near future with a huge investment capital come from outside and inside Vietnam. In recent years, international project management firms enter the Vietnam construction market, some issues emerged need to be solved. In which cost and schedule of the construction project was put in a thoroughly consider of not only project management team but also stakeholders. The research attempts to identify and assess the relationship of factors affecting the construction cost in construction phase in Ho Chi Minh City, Vietnam. Five main factor groups Owners/clients; Consultants; Contractors; Resource and Other were identified to propose the solution for cost management.

  • PDF

A Study on the Design-Phase Checklist for Office Project Management (업무공간 프로젝트 매니지먼트의 디자인 단계 체크리스트 개발에 관한 연구)

  • Hwang, Hye-Jeong;Lyu, Ho-Chang
    • Korean Institute of Interior Design Journal
    • /
    • v.21 no.5
    • /
    • pp.208-216
    • /
    • 2012
  • The importance of applying project management in interior design has been increased due to recent changes in construction business environment along with market opening which demands more systematized and organized project management system. Yet, project management has not been utilized for interior design industry in Korea. This study intends to define the concept of project management in interior design, categorize tasks of each phase in office design project, and establish a table of elements which should be considered in each task. The table can be utilized as a checklist at the designing site. An in-depth analysis was conducted on the tasks in the Designing phase. In short, this study demonstrates five management phases and nine tasks. The differentiated checklist for office design is discussed in the project management of the Design phase. The checklist established in this study can be used as a practical guideline not only for the clients who are not familiar with management of design project, but also for existing project managers and interior designers. Further studies on management of design projects and development of checklist other than office design is needed.

  • PDF

Communication-Centered Project Management for Requirements Definition Phase

  • Ishii, Nobuaki;Muraki, Masaaki
    • Industrial Engineering and Management Systems
    • /
    • v.11 no.1
    • /
    • pp.39-47
    • /
    • 2012
  • Requirements definition, which determines a project baseline, has a strong impact on the success of a project. However, since in-depth requirements are gradually revealed through the requirements definition process, the requirements definition is not a straight forward process and often falls into disorder. Thus project management standpoints are critical for the success of the requirements definition. In this paper, we present a framework and mechanisms of communication-centered project management, which controls the requirements definition process based on the situation of communication-oriented activities among stakeholders. In addition, we present a communication-centered project plan with a planning method. The project plan, which represents a time schedule of requirements definition activities, is made by a simulation-optimization algorithm using a stakeholder matrix showing the relations of requirements domains and relevant stakeholders. The effectiveness and the significance of communication-centered project management at the requirements definition phase are demonstrated by numerical examples.