• 제목/요약/키워드: PLANNING FRAMEWORK

검색결과 875건 처리시간 0.029초

Framework for Estimating Appropriate Construction Duration of CFRD in the Planning Phase

  • Kim, In Kyum;Kim, Kyong Ju;Yun, Won Gun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.604-605
    • /
    • 2015
  • To secure quality of dam construction needs appropriate construction duration. Tight construction schedule may have negative influence on infrastructure quality, work safety and maintenance cost. It is necessary to reflect proper construction duration in the planning phase. There have been standards for estimating construction duration of building and industrial complex development but dam construction have not. In order to estimate construction duration of CFRD, feasible study reports and design reports were analyzed to acquire available information. After that, considering on construction duration methods such as comparison with similar cases, approximate estimating formula, approximate quantity assumption were adapted to Critical Path items. Hence, this study present framework for construction duration estimating of CFRD in the planning phase. This framework can be applied other types of dam along the same line.

  • PDF

고객구매활동 기반의 e-CRM 전략 (e-CRM Strategy based on Customer Purchasing Activity)

  • 강현석;서영호
    • 품질경영학회지
    • /
    • 제28권3호
    • /
    • pp.133-144
    • /
    • 2000
  • Many organizations have developed their own information systems not only for internal efficiency but also for effectiveness of external customer services. One of the most effective service tools for their customers is the use of information technology. The web technology is rapidly becoming one of the most effective tools for online customer services. In order to gain competitive edge, organizations must have effective web site planning methods for their customer service. A study on traditional information systems planning methodologies has been conducted and they are compared with web site planning techniques. Cases of web sites in order to Improve customer relationship are analyzed. finally, a new conceptual framework for web site planning strategy for e-CRM is proposed in this paper. In order to support effective web site planning, online customer contact points and online service activities are defined and classified as several stages. And, web site strategies corresponding to each customer service activities are developed and proposed, With this framework, organizations can build competitive web strategies for improving their online customer relationships, thereby increasing customer satisfaction.

  • PDF

동적 이벤트를 고려한 수주생산환경의 계층적 생산계획 및 통제 시스템 (A Hierarchical Production Planning and Control System in a Make-to-Order Environment with Dynamic Events)

  • 장길상;김재균
    • 산업공학
    • /
    • 제14권1호
    • /
    • pp.9-19
    • /
    • 2001
  • Production planning and control system plays an important role in manufacturing companies because it determines all production capacity planning, material procurement planning, and production scheduling which are needed in the process of producing products. Many researches on production planning and control system have been conducted for many manufacturing companies for recent decade. But, a considerable research achievement has mainly been obtained on the forecast-driven production for a make-to-stock and an assemble-to-order. The reason is that there are some hardships such as difficulties of standardizing product information, the frequent changes of design and material, and the unexpected dynamic events that influence the production of customer's order in a make-to-order or an engineering-to-order environments. By these characteristics and their complexities, some studies for production planning and control system in a make-to-order environment are presented recently. In this paper, we present the framework of the hietachical production planning and control for a make-to-order environment with dynamic events. In order to illustrate the usefulness of the proposed framework for a hietachical production planning and control, the information system for a make-to-order production was implemented with the object of the company of producing electricity transformer.

  • PDF

Development of a decision framework for the designing and implementation of a sustainable underground water storage system

  • Gladden, Lennox Alexander;Park, Namsik
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2015년도 학술발표회
    • /
    • pp.244-244
    • /
    • 2015
  • Managed Aquifer Recharge (MAR) in the form of Aquifer Storage and Recovery (ASR) systems are being applied for numerous water augmentation projects both in developed and developing countries. Given the onset of Climate Change and its influence on weather patterns and land use, it has been acknowledged the utilization of this technology will be ever increasing. This technique like all others does have its drawbacks or disadvantages, whereby to overcome these drawbacks or disadvantages it is recommended that logical planning process be followed. In this study, we developed a decision framework known as "Decision framework for the planning, designing, construction/testing and implementation of subsurface water storage system" to further standardize the planning and design process of subsurface water storage system to increase the probability of having a successful ASR/ASTR project. The formulation of this framework was based on earlier frameworks, guidelines, published papers and technical reports which were compiled into a data collection database. The database of which consider both qualitative and quantitative aspect for example recharge objectives, site location, water chemistry of the native, source and recovered water, aquifer characteristics(hydraulic conductivity, transmissivity, porosity), injection/pumping rate, ecological constraints, societal restrictions, regulatory restrictions etc. The assimilation of these factors into a singular framework will benefit the broad spectrum of stakeholder as it maps the chronological order under which ASR project should be undertaken highlighting at each stage the feasibility of the project. The final stage of which should result in fully operational ASR system. The framework was applied to two case studies and through the application of a modified ASR site selection suitability index (Brown et al., 2005) a score was derived to identify the performance of each site. A high score of which meant a maximize chance of success given the reduce presence of project constraints.

  • PDF

국가정보화시행계획 업무의 EA적 접근 (A Study on National IT Planning based on EA Approach)

  • 홍필기;김대권;이석준
    • 정보화연구
    • /
    • 제11권2호
    • /
    • pp.235-247
    • /
    • 2014
  • 국가정보화를 위해 5년 단위의 정보화 기본계획을 수립하고 매년 부처별 정보화시행계획에 대한 사업과 예산을 계획한다. 국정과제를 비롯한 국가정보화의 상위 정책과 기획재정부의 예산 관점, 정보화 총괄부서인 미래창조과학부의 관점이 달라 국가정보화시행계획이 효과적으로 검토되지 못하고 있다. 정보화시행계획과 관련한 다양한 관점과 검토 사항을 EA 프레임웍 사상과 기법을 적용하여 검토 프로세스를 효과적, 효율적으로 수행하는 방안을 연구하였다.

A BIM-based Automated Framework for Formwork Planning on Construction Sites

  • Xu, Maozeng;Mei, Zhongya;Tan, Yi
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.52-61
    • /
    • 2017
  • Considering its significant impact on the cost and schedule of construction projects, formwork as one part of temporary facility categories in construction should be arranged precisely. Current practice in the formwork planning is often conducted manually and repetitively, causing low efficiency and time waste. This study proposes an automated framework to generate more accurate and detailed formwork plans by utilizing information from building information modeling (BIM) considering the adequate geometric and semantic information provided by the BIM model. The dimensions and quantities information of elements in a building can be extracted automatically. Then, a rule is prepared for calculating the required forms erected around elements based on the contact areas. Finally, an algorithm of integrating first fit decreasing (FFD) with coordinated bottom left (CBL) is applied to automatically generate the formwork plan. The BIM-based automated planning framework is demonstrated by an illustrative example. The results show that the proposed framework can generate the formwork plan accurately and automatically, and significantly improve the efficiency in the formwork plan and reuse.

  • PDF

Centralized, Distributed, Hybrid Task Planning Framework for Multi-Robot System in Diverse Communication Status

  • Moon, Jiyoun
    • Journal of Positioning, Navigation, and Timing
    • /
    • 제10권3호
    • /
    • pp.215-220
    • /
    • 2021
  • As the role of robots expands, flexible task planning methods are attracting attention from various domains. Many task planning frameworks are introduced to efficiently work in a wide range of areas. In order to work well in a broad region with multiple robots, various communication conditions should be controlled by task planning frameworks. However, few methods are proposed. In this paper, we propose mission planning methods according to the communication status of robots. The proposed method was verified through experiments assuming different communication states with a multi-robot system.

Motion Planning and Control for Mobile Robot with SOFM

  • Yun, Seok-Min;Choi, Jin-Young
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2005년도 ICCAS
    • /
    • pp.1039-1043
    • /
    • 2005
  • Despite the many significant advances made in robot architecture, the basic approaches are deliberative and reactive methods. They are quite different in recognizing outer environment and inner operating mechanism. For this reason, they have almost opposite characteristics. Later, researchers integrate these two approaches into hybrid architecture. In such architecture, Reactive module also called low-level motion control module have advantage in real-time reacting and sensing outer environment; Deliberative module also called high-level task planning module is good at planning task using world knowledge, reasoning and intelligent computing. This paper presents a framework of the integrated planning and control for mobile robot navigation. Unlike the existing hybrid architecture, it learns topological map from the world map by using MST (Minimum Spanning Tree)-based SOFM (Self-Organizing Feature Map) algorithm. High-level planning module plans simple tasks to low-level control module and low-level control module feedbacks the environment information to high-level planning module. This method allows for a tight integration between high-level and low-level modules, which provide real-time performance and strong adaptability and reactivity to outer environment and its unforeseen changes. This proposed framework is verified by simulation.

  • PDF

기능성게임 제작을 통한 기획접근 프로세스 사례 (A Case Study of a Planning Process through Developing Serious Games)

  • 은광하
    • 한국콘텐츠학회논문지
    • /
    • 제10권6호
    • /
    • pp.197-204
    • /
    • 2010
  • 본 논문은 기능성 소재 게임 제작을 통해서 기능성 게임 기획 접근에 대한 프로세스 사례를 연구한 기획 교육실습에 관한 내용이다. 주요 연구 내용은 순기능 소재의 게임 제작을 통해서 게임 직무의 중요한 부분 중에 하나인 기획에 대한 교육실습 과정을 '기능성 게임기획 프레임워크'로 구성하였으며 실제 기능성 게임 제작을 통해서 제안된 프레임워크의 내용을 검증해 보았다. 본 논문의 목적은 순기능이란 목적을 지닌 기능성 게임기획에 대한 접근 과정은 일반적인 접근 프로세스와 달리 단계별 정량적인 접근 기준이 필요하다는 전제 하에 기획 접근 프로세스를 단계별로 제시하는 것이다. 이는 향후, 기능성 게임 교육의 참고 자료로서 활용될 수 있다.

반도체 산업의 협업전략계획에 관한 연구 (A Study on Collaboration Strategy Planning of Semiconductor Industry)

  • 조남욱;김태성
    • 산업경영시스템학회지
    • /
    • 제28권2호
    • /
    • pp.139-145
    • /
    • 2005
  • As today's business environment becomes more globalized and distributed, the importance of collaboration is rapidly increasing. This Paper Presents a systematic approach to collaboration strategy planning. The framework suggests that a Collaborative Process Map needs to be identified first. Then, Collaboration Maturity of an enterprise is evaluated. Based on the Collaborative Process Map and Collaboration Maturity Evaluation, Collaboration Execution Plans are systematically established. A case study shows that the proposed framework can successfully be applied to the strategic collaboration planning of semiconductor industry