• Title/Summary/Keyword: PIC girder bridge

Search Result 2, Processing Time 0.016 seconds

Experimental Study for Development of the Steel-Concrete Composite Rigid-Frame Bridge Integrated with PS Bar (PS 강봉으로 일체화된 강합성 라멘교의 개발을 위한 실험연구)

  • Ahn, Young-Soo;Chung, Jee-Seung
    • Journal of the Korean Society of Safety
    • /
    • v.27 no.4
    • /
    • pp.50-61
    • /
    • 2012
  • In recent years, various research and developments to introduce composite bridges of new concept have been performed. The types of integral bridge and portal rigid frame bridge are having advantages in bridge maintenance and structural efficiency by eliminating expansion joints and bridge supports. However, the detail of typical girder-abutment connection has problems such as complexity of construction and increase of the construction cost. A new type of bridge, called prestress integral composite girder(PIC girder) bridge, is proposed in this study, which decreases the cost of construction and improves the efficiency of construction by simplifying the detail of construction for girder-abutment connection. PIC girder bridge has the connection detail in which the steel girder and the abutment are integrated by using the PS bar installed in the connection. In this study, finite element analysis and mock-up load test are conducted to evaluate the propriety of design, the effective of fabrication and structural safety for PIC girder bridge. The adequacy of the PIC giredr bridge is verified by the results of static/dynamic load test and finite element analyses.

An Experimental Study on the Girder-Abutment Connection for the Steel-Concrete Composite Rigid-Frame Bridge Integrated with PS Bars (PS 강봉으로 일체화된 강합성 라멘교의 거더-교대 접합부의 거동에 관한 실험적 연구)

  • Lee, Sang-Yoon;Ahn, Young-Soo;Oh, Min-Ho;Chung, Jee-Seung;Yang, Sung-Don
    • Journal of the Korea Concrete Institute
    • /
    • v.24 no.4
    • /
    • pp.453-463
    • /
    • 2012
  • Steel-concrete composite rigid-frame bridge is a type of integral bridge having advantages in bridge maintenance and structural efficiency from eliminating expansion joints and bridge supports, the main problems in bridge maintenance. The typical steel-concrete composite rigid-frame bridge has the girder-abutment connection where a part of its steel girder is embedded in abutment for integrity. However, the detail of typical girder-abutment connection is complex and increases the construction cost, especially when a part of steel girder is embedded. Recently, a new type of bridge was proposed to compensate for the disadvantages of complex details and cost increase. The compensation are expected to improve efficiency of construction by simplifying the construction detail of the girder-abutment connection. In this study, a static load test has been carried out to examine the behavior of the girder-abutment connection using real-scale specimens. The results of the test showed that the girder-abutment connection of proposed girder bridge has sufficient flexural capacity and rebars to control concrete crack should be placed on the top of abutment.