• Title/Summary/Keyword: PFI(Private Finance Initiative)

Search Result 19, Processing Time 0.135 seconds

A Study on the Causal Loop Analysis and the Economics of BTO and BTL System of PFI (BTL과 BTO사업의 인과순환구조 분석과 경제성 비교에 관한 연구)

  • Choi, Nam-Hee
    • Korean System Dynamics Review
    • /
    • v.12 no.4
    • /
    • pp.35-62
    • /
    • 2011
  • PFI(Private Finance Initiative) for suppling SOC and public facilities instead of Government Infrastructure Project introduced from 1994. BTO(Build-Transfer-Operate) project had been major type of PFI system from 1994 to 2005. But after changed the Law of PFI on SOC, the BTL project newly introduced. In BTO system, the Government retrieves the investment through the operating income, but in BTL system, the government lease the facilities. As the BTO and BTL projects are widely adopted and implemented to ease the fiscal burden of government, but it has caused the tremendous fiscal burden each year over the period operation. Therefore this study attempted to analyze the question, that is, why government fiscal burden tipping? Hence, this paper, compares the difference of business structure between BTO and BTL project and explore the vicious and virtuous business structure, with the method of circular causal loop analysis. As a result, it has shown that there are some positive feedback and negative feedback loops cause the tipping and easing of government fiscal burden.

  • PDF

A Study on the Application Scheme of the Warranty delivery system in Domestic Private Finance Initiative (국내 민간투자사업의 성능발주제도 도입에 관한 연구)

  • Kim, Dae-Kil;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.527-530
    • /
    • 2007
  • The construction market has gradually become complexity, variety and specialization, and then owner's requirements about quality has become various. In order to solve the problem such as stated above, advanced constructions in France, United Kingdom, Japan and United States have introduced warranty contract which is warranted to quality and performance for need of owner in determined term to ensure the quality of construction since 1960s. In addition to, domestic constructions have been meeting with international competition because of the open BOT market from FTA. Finally, this study proposed new warranty delivery system model in PFI on considering domestic status by benchmarking the delivery process and the characteristics of the warranty contract which is applied to PFI of global.

  • PDF

How to improve the governance for PPPs on special purpose facilities in Korea - based on the UK PFI failure case study - (특수목적 시설 민간투자사업 거버넌스 개선 방향 -영국 국립물리연구소 실패 사례 분석을 중심으로-)

  • Choi, Seok-Joon;Lee, Ji-Hae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.32-40
    • /
    • 2011
  • The PPPs(public private partnerships) which was introduced in the later part of the 1990s has grown since 2005, with the beginning of BTL(Build Transfer Lease) type which retrieves the investment by receiving the lease payment from the government. As application areas and scale of the PPPs have been further expanded, it is expected the demand on special purpose facilities will be increased. We do know only successful foreign practices of the PPPs but have rarely consider the failure cases. Therefore, this paper derives implications by analyzing the case of National physical laboratory project which is known as a typical failure case of UK's PFI. We find that from the perspective of governance, the reasons leading to the failure of business are an insufficient of technical rationality, unsettled social relationships and inefficient risk management. Based on the case study, this study shows how to improve management system for special purpose PPPs business in Korea.

PFI법을 적용한 일본의 ESCO사업

  • 에너지절약전문기업협회
    • The Magazine for Energy Service Companies
    • /
    • s.29
    • /
    • pp.48-61
    • /
    • 2004
  • 최근 일본에서는 ESCO사업에 PFI법을 새로이 적용하고 있다. 성과배분제, 성과보증제에 이어 이 제도를 적용할 경우, 국가 및 공공기관을 대상으로 하는 ESCO사업의 확대 및 자금조달이 한층 유리해질 전망이다. 지난 99년 제정된 PFI(Private Finance Initiative)법(민간자금 등의 활용에 의한 공공시설 등의 정비 등의 촉진에 관한 법률)에 근거한 사업은 ''공공시설 등''에 있어서 건설, 유지관리 운영 등을 민간의 자금, 경영능력 및 기술적 능력을 활용하는 사업방법으로 사업 전체의 리스크관리가 효율적으로 행해지는 것과 설게$\cdot$시공$\cdot$유지관리$\cdot$운영의 전부 또는 일부를 일체적으로 취급하는 것에 의해 사업비용의 절감이 기대되며 질 높은 서비스의 제공이 가능한 제도이다. 이것과 매우 유사한 개념을 가지고 있는 것이 성과보증제에 의한 ESCO사업이다. 민간사업자인 ESCO사업자가 자금을 조달하고 에너지절약 개수공사에 따른 설계$\cdot$시공$\cdot$, 운전$\cdot$유지관리, 계측$\cdot$검증, 에너지절감 보증 등의 서비스를 제공하며, 광열수도비 및 운전$\cdot$유지관리비의 절감분으로 모든 투자와 ESCO사업자의 경비를 지불한다. 또 에너지절감 및 공공의 이익보증을 포함한 퍼포먼스계약이라고 하는 형태를 취하는 것으로 공공 이익의 최대화를 도모함과 동시에 금융기관의 투자 리스크에 관한 우려를 회피할 수도 있다. 또 PFI법 특유의 법제상, 재정상의 조치와 재정상 및 금융상의 지원이라는 배려에 있다. 예를 들면, 국고채무부담행위의 설정, 행정재산 사용료의 무상화 또는 감면, 프로젝트 파이낸싱 등에 의한 자금조달을 고려할 경우에 있어서 담보권의 설정 등에 관한 제도를 합리적으로 정비하는 것이 가능하게 된다. 그 내용의 대강을 살펴본다.

  • PDF

민자사업의 사업관리 사례분석

  • Lee Kwan-Young;Kim Se-Jong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.13-19
    • /
    • 2004
  • In most PFI(Private Finance Initiative) projects in Korea, the project management are in charge of the Special Purpose Company(SPC) established for carrying out the project. This paper is a case study about an owner CM executed by the organizations and staffs of SPC itself. : Seoulbeltway (Ilsan $\~$ Toegaewon) Private Investment Project. In time management area, the SfC was the leader of project management throughout the life circle - plan, design, permit, construction, operation and maintenance - beyond the schedule manager's role. In cost management area, the methods of reducing the total costs by VE, new technologies, etc. has been needed assuming the construction risks were subject to SPC.

  • PDF

Analysis of the Capability of Korean Construction Companies for International Investment Development Business

  • Jang, Hyoun-Seung;Kim, Hwa-Rang
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.2
    • /
    • pp.112-121
    • /
    • 2013
  • Korean overseas construction has been on the rise, and exceeded the 2011 goal of $50 billion by securing $59.1 billion in orders. However, these orders were heavily concentrated in the Middle East (50%) and plant construction contracts (75%). This study suggests that, to maintain growth in foreign markets, Korea construction companies should enter into the high value-added investment development business and aggressively seek ways to diversify their regions of activity and construction types. To secure the entry of Korean construction companies into lucrative markets and better understand the competitive factors facing Korean construction concerns, a survey of the literature and focus group discussions targeting relevant experts were carried out. From those efforts, a list of 44 competitive factors crucial to entering and competing in the international investment development business was developed. Survey responses were analyzed by applying IPA. The results revealed that while Korean concerns compete well in engineering/technical capabilities, maintaining a cooperative relationship with contractors, and warranty/after sales service capabilities, their ability to obtain business information on the target country, to form private/public cooperative systems, and to build international human networks require immediate improvement.

A Survey on the Persons in Charge for Economic Estimation Analysis and Improvement of BTL Projects (BTL사업의 경제성 평가 현황조사 및 개선을 위한 실무자 설문조사연구)

  • Lee, Chun-Kyong;Cho, Bong-Ho;Park, Tae-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.73-80
    • /
    • 2007
  • As BTL(Build-Transfer-Lease) private investment business benchmarking PHI(Private Finance Initiative) of USA and Japan is introduces to Korea since 2005, as a part of supplying high leveled public service and early expanding required facilities for SOC, Value for Money on private investment business from treasury investment business at the beginning gets to be needed. Accordingly, this survey has been conducted in order to analyse BTL projects status, propriety of economic analysis method(VFM analysis, calculation of estimated business expenses, valuation of bidding price, etc.) by business advance phases from the viewpoint of person in charge, necessity of improvement and alternative plants. As the result of conducting cross tabulation analysis and correlation analysis by occupational group, BTL project advance phases and alternative plans for improvement, it is necessary ye prepare standardized service level against business expense and basis for calculating and evaluation operation expenses. Based on the necessity of quantitative analysis (LCC analysis) of VFM, standard for calculating management, maintenance and administration expenses is required. In addition, reliable economic valuation system considering domestic BTL environment should be setup, for business efficiency.

A Study to Secure Reasonable Transportation Infrastructure Stock for Improving National Competitiveness in Korea (국가경쟁력 강화를 위한 SOC 확보 방안)

  • Park, Yong-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.38-43
    • /
    • 2008
  • The purpose of this study is to secure reasonable transportation infrastructure stock for enhancing national competitiveness in Korea. National competitiveness may be defined as a country's overall capacity to create the most effective social structure, institutions and policies that allow her company within the national boundary to be more competitive in the world market. If Korea's transportation infrastructure stock is not sufficient and a connection among transportation facilities is not efficient, we should pay the social and economic cost. As a result, we worry that national competitiveness may drop. Some methods to maintain or to increase the national investment for transportation infrastructure that are suggested from this study are as follows: Firstly, we need to operate the Spcial Account for Traffic Facilities. Secondly, the investment should be focused on the facilities and districts in needs. Thirdly, PFI (private finance initiative) policy should be aimed at investing for the highly economic-valued projects.

  • PDF

The Evaluation of Value at Risk in Build Transfer Lease Project (민간투자사업의 위험가치 평가 - 임대형 민간투자사업(BTL)의 위험가치 평가 제도를 중심으로 -)

  • Choi, Seok-Joon;Kim, Sang-Sin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.10
    • /
    • pp.2907-2916
    • /
    • 2009
  • PPPs(Public Private Partnerships) in Korea was introduced in 1990s, which mainly used for providing transportation facilities such as railroad and high-way. Since 2005, a service delivery type PPPs, in other words BTL(Build Transfer Lease) has been implemented, which focused on social infra-structure including school, military housing, and sewage facilities. According to previous literature, efficient risk evaluation and management is the key factor for successful PPPs in the UK and Australia. However, Korea doesn't have proper risk evaluation system for PPP type project. In this paper, we explore and analyze risk evaluation system of PPPs in Korea and other countries. Also, we apply empirical methodology used in the UK to a BTL project and set up a new PSC(Public Sector Comparator) with risk evaluation.