This study verified for the necessity for the comprehensive analysis of outcomes resulting from the local industry promotion project in many respects. To analyze the operation planning for performance management of local industry promotion project, this study redesigns the so-called PDCA(Plan${\rightarrow}$Do${\rightarrow}$Check${\rightarrow}$Act) model which is also known as Deming Cycle and verifies some hypotheses. To accomplish study purposes, 169 response samples from 85 project groups which drive the local industry promotion project were verified using SPSS 12.0. The findings are as follows: First, there was a positive relationship between the planing phase and the implementation phase. Second, there was also a positive relationship between the implementation phase and completion of the project phase. Third, there was a positive relationship between the planing phase and completion of the project phase. Finally, the implementation phase was a partial mediator on the relationship between the planing phase and completion of the project phase. Based on these findings, the implications and the limitations of the research findings were discussed, and recommendations for future research were provided.
The objective of this study is to draw implications and also to design an evaluation model suitable for vocational education in college based on the literary consideration of the quality management of curriculum and the case analysis on the quality management of curriculum of early childhood education department in college, and then to seek for the measures for the systematic quality management of curriculum of early childhood education department applying the evaluation model. To the core of this study, as the evaluation measures for systematically approaching the quality management of curriculum in the aspect of department, this study presented a curriculum quality management model for early childhood education department of college which was mixed with CIPP model as a program evaluation model that has been a lot used for the evaluation of domestic/foreign curriculums in the evaluation(C) stage of PDCA with the use of PDCA procedure as a school administrative process, and then suggested the roles and quality culture of members. The results of this study could be used as the basic data for the quality management of curriculum of early childhood education department in college, desired by diverse institutions and projects for the institutional support in the future.
Jeong-Woo Han;Ki-Jae Kim;Won-Young Lee;Hyun-Min Baek;Hyung-Min Lee
Journal of the Korean Society of Marine Environment & Safety
/
v.30
no.4
/
pp.332-339
/
2024
Safety is essential for organizations operating in high-risk environments, such as the Navy. Effective safety management requires continuous improvement and supplementation, commonly achieved through the PDCA (Plan-Do-Check-Act) cycle. Despite reinforced safety regulations and expanded education, safety accidents persist in the Navy, indicating a need to enhance the safety accident analysis and classification system. This study aims to analyze and identify the shortcomings of the current Navy safety accident classification system to establish a more effective framework. By doing so, we will be able to register the results of safety accidents, identify their root causes, and propose a 12-digit Navy safety accident classification code. This code will contribute to the development of mid- to long-term safety management policies.
The PDCA (Plan, Do, Check and Act) cycle is often used in the field of quality management. Recently, business environments have become more competitive, and the due time of products has shortened. In a short production run process, to increase efficiency of management, the necessity for distinguishing the PDCA design that starts with PLAN and the CAPD design that starts with CHECK has been clarified. Starting from Duncan (1956), there have been a number of papers dealing with the economic design of control charts from the viewpoint of production run. Some authors (Gibra, 1971; Ladany and Bedi, 1976; etc.) have studied the economic design for finite-length runs; other authors (Crowder, 1992; Del Castillo and Montgomery, 1996; etc.) have studied the economic design for short runs. However, neither the PDCA nor the CAPD design of control charts has been considered. In this paper, both the PDCA and CAPD designs of the $\bar{\x}$ chart are defined based on Del Castillo and Montgomery's design (1996), and their mathematical formulations are shown. Then from an economic viewpoint, the optimal values of the sample size per each sampling, control limits width, and the sampling interval of the two designs are studied. Finally, by numerically analyzing the relations between the key parameters and the total expected cost per unit time, the comparisons between the two designs are considered in detail.
Journal of the Korean Society of Marine Environment & Safety
/
v.30
no.3
/
pp.275-282
/
2024
To ensure a systematic and integrated approach to defense safety management, individual safety management regulations have been consolidated into the National Defense Safety Directive. However, despite being enacted after the enforcement of the Severe Accident Punishment Act, the National Defense Safety Directive does not incorporate the contents of the Serious Accident Punishment Act. This omission is likely to cause confusion in safety management. In this paper, a PDCA analysis of the Severe Accident Punishment Act and the National Defense Safety Directive was conducted to identify area for improvement and supplementation in the Directive. Chapter 3 proposes amendments to clearly define the scope and responsibilities of safety management, implement serious accident prevention measures and inspections, and establish the penalties for those involved. These amendments aim to ensure faithful compliance with the Severe Accident Punishment Act. Chapter 4 emphasizes the implementation and inspection of risk assessments to enhance the effectiveness of safety accident prevention and preparation, thereby ensuring the completeness of the PDCA cycle.
Journal of the Korea Institute of Building Construction
/
v.8
no.1
/
pp.49-56
/
2008
According to the recent trends which are the diversity of customer requests and the multi-function of buildings, A construction company's business has converted from the producer-oriented approach to the consumer-oriented approach. Therefore, each construction company is continuously trying to improve the quality level as a way of corresponding to customer needs in these changing situations. The quality is one of the main management targets which judge the success of a project along with the schedule, the cost and the safety. As construction companies execute the quality management which they aimed at, it should be completed within the optimum schedule and the limit of the budget. Accordingly, the importance of the construction site management to complete a project is continuously increasing. The construction site management is the systematic method to perform the project goals such as the quality improvement, the cost saving and the safety management, which organically operate one another, by procuring the manpower, the material and the machine in the right time. Specially, as the construction industry has based on the construction site, the establish of systematic construction site management, which can effectively correspond sudden changes of the construction business environment, is essential to maximize the construction productivity. On top of that, the necessity of the quality management method is increasing to accommodate customer needs more spontaneously in the construction site. These endeavors could guarantee their competitive power.
Journal of the Korea Academia-Industrial cooperation Society
/
v.16
no.9
/
pp.5914-5923
/
2015
Recently, Recently, many quality problems in military supplies are raised such as K-series weapons(K-2 tank, K-9 Self-propelled artillery and K-11 Armoured Car and etc.) quality issues, leaking combat shoe issue and so on. Existing one and only national quality assurance agency for military supplies, Defense Agency for Technology and Quality(DTaQ) adapted risk management based framework to perform the government quality assurance activities. However, risk framework established by DTaQ seems lack of objectivity, consistency and efficiency. In this research, we first reviewed the DTaQ's regulations to identify the possible problems, and then suggested the alternatives which are based on advanced risk management framework and plan-do-check-action(PDCA) cycle. In conclusion, we suggested the new risk management framework, so called visual PDCA fishbone chart, and illustrated the use of the framework via real instance.
Journal of Korean Tunnelling and Underground Space Association
/
v.19
no.3
/
pp.437-447
/
2017
In current, there has not been the evaluation model for the optimum design of the multi-utility tunnel by considering urban type and size, the function of surrounding road and feasibility analyses with respect to construction method, and arrangement of accommodation facilities inside multi-utility tunnel. Thus, in this study, we developed the evaluation model for the optimum design of the multi-utility tunnel before and after the decision of the multi-utility tunnel installation. In this paper, we have selected the Deming cycle which is used in various fields among several decision methods for optimizing the design. For the purpose of reflecting the various factors in the design of the multi-utility tunnel, 11 higher indicators were set up to lead to more detailed approaches. In addition, based on the "Plan-Do-Check-Action (PDCA)" circulation method, we can realize the installation of the multi-utility tunnel and design more efficiently through the first phase for conception and the second phase for optimization, and develop the program for the evaluation model accordingly.
Total Quality Management(TQM) in Higher Education Institution(HEI) has been popular since early 1980s. Implementation of TQM, however, has not been easy. The difficulties of the implementation is partially due to the lack of effective TQM models in HEIs. This paper proposed a new model based on PDCA cycle. The paper consists of four chapters. First chapter Introduces the status of TQM in HEIs and implementation problems. Second chapter delineates the models used in HEIs. In third chapter, a new model is suggested. Last chapter is the conclusions.
Proceedings of the Korean Institute of Industrial Safety Conference
/
2002.05a
/
pp.101-108
/
2002
OHSAS 18001(Occupational Health and Safety Assessment Series 18001)은 안전보건 경영 시스템으로서 기업이 자율적으로 산업재해를 예방하기 위하여 안전보건 체제를 구축하고, 주기적으로 유해위험 정도를 자체 평가하여 그에 따라 설비 및 작업환경을 개선토록 함으로써 산업재해를 체계적으로 예방 관리하도록 요구하는 표준이다. 표준의 구성은 ISO 14001 환경시스템과 그 골격이 거의 같은데 크게 4.1 일반적인 요구사항, 4.2 안전보건방침, 4.3 계획, 4.4 실행 및 운영, 4.5 점검 및 시정조치, 4.6 경영자 검토로 구성되어 있으며 전체적인 구조로 보면 지속적 개선을 이루기 위한 PDCA개념, 계획, 실행, 점검, 조치의 Cycle을 이루고 있다.(중략)
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.