The possibility of using lime/mineral solvent solutions has been investigated to effectively remove T-P from wastewater. The lime solvent solution showed an initial T-P removal efficiency of about 90% compared to the less efficient mineral solvent solution removal. High pH and dissolved Ca2+ can form hydroxyapatite minerals (Ca5(PO4)3(OH) or Ca10(PO4)6(OH)2 and can also remove SS and COD from wastewater. Feldspar dissolution solution can be reused twice because the Ca limited sample content provided, but further research is needed to discover other influencing parameters that control the T-P removal efficiency in real wastewater. Because it plays an important role of alkalinity in T-P removal, the success rate is limited. In practical applications, it is obtained according to the pH value wastewater in the environment. The results obtained in this study can highlight new insights on the use of limestone/dissolved mineral solutions to control T-P in wastewater, instead of directly using commercial chemical agents that can produce large amounts of unreacted chemical sludge.
In this study, biological PCE degradation by using a BTEX degrading bacterium, named BJ10, under aerobic conditions in the presence of toluene was examined. According to morphological, physiological characteristics, 16S rDNA sequencing and fatty acid analysis, BJ10 was classified as Pseudomonas putida. As a result of biological PCE degradation at low PCE concentrations (5 mg/L), PCE removal efficiency by P. putida BJ10 was 52.8% for 10 days, and PCE removal rate was 5.9 nmol/hr (toluene concentration 50 mg/L, initial cell density 1.0 g (wet weight)/L, temperature 30, pH 7 and DO $3.0{\sim}4.2\;mg/L$. At high PCE concentration (100 mg/L), PCE removal efficiency by P. putida BJ10 was 20.3% for 10 days, and PCE removal rate was 46.0 nmol/hr under the same conditions. The effects of various toluene concentration (5, 25, 50, 100, 200 mg/L) on PCE degradation were examined under the same incubation conditions. The highest PCE removal efficiency of PCE was 57.0% in the initial PCE concentration of 10 mg/L in the presence of 200 mg/L toluene for 10 days. Furthermore, the additional injection of 5.5 mg/L PCE (total 7.6 mg/L) made 63.0% degradation for 8 days in the presence of 50 mg/L toluene under the same conditions. Its removal rate was 13.5 nmol/hr, which was better than the initial removal rate (8.1 nmol/hr).
This study estimated the effect of hydraulic residence time(HRT), influent total ammonia nitrogen(TAN) concentration, temperature and pH in the packed-bed bioreactor using immobilized nitrifiers. Removal rate of ammonia nitrogen was increased with decreasing HRT and the optimum HRT was 0.2 hour when influent TAN was $2g/m^3$. At this point, removal rate was $226.1\;g/m^3{\cdot}day$ and removal efficiency was 88.8%. Removal rate of ammonia nitrogen was Increased with increasing TAN concentration. Removal rate and efficiency of ammonia nitrogen were kept constant at $20{\sim}35^{\circ}C$ and pH $8{\sim}9$ value.
The present study was carried out to examine the effect of crosslinked ${\beta}$-cyclodextrin(${\beta}$-CD) made by adipic acid on cholesterol removal rate and find the structural change after recycling on SEM observation. The size reduction and morphological changes were found during the recycling process and the profound changes were observed at 8th time reuse. After cholesterol removal in milk, the used crosslinked ${\beta}$-CD was washed for cholesterol dissociation and reused. In recycling study, the cholesterol removal rate at first trial was 92.5% in milk, which was mostly same as that using new crosslinked ${\beta}$-CD(92.4%). With repeated 10th reuse of crosslinked ${\beta}$-CD resulted in 81.4% of cholesterol removal in milk. Similar trend was found in cream and cholesterol removal was 91.5% at 1st trial and 83.4% at 10th trial. In both milk and cream samples, the removal rate at 1st reuse was not significantly different from that at 6th reuse(p>0.05). The present study indicated that crosslinked ${\beta}$-CD made by adipic acid resulted in the effective recycling efficiency, especially up to 6th reuse and morphological modifications were not distinguishable up to 8th reuse.
Journal of the Korea Organic Resources Recycling Association
/
v.18
no.1
/
pp.89-97
/
2010
In this study, to investigate the effect of chemical pretreatment for livestock wastewater, laboratory scale test for ozonation and linked treatment of sewage were conducted. and the results were obtained as follows. The ozonation of livestock wastewater showed the COD removal rate per hour to be 17%, 78% and 62% at each pH 4, 7 and 10, respectively. With transformation of NBDCOD to biodegradable BDCOD by ozonation, the ratio of SCODcr/TCODcr was increased from 26% to 38%. Accordingly, pretreatment of livestock wastewater affected to the biological post treatment process to elevate removal efficiency by transformation of nonbiodegradable mass to biodegradable mass. As the results of linked treatment of pre-ozonated livestock wastewater and sewage in the MLE process, the treatment efficiencies of TCODcr 93.8%, T-N 74.3%, T-P 89.7%, SS 97.5% were earned at 100% of internal recycle rate. When the internal recycle rate was increased to 150%, the treatment efficiencies of TCODcr 94.5%, T-N 54.5%, T-P 70.8%, SS 98.5% were earned. Also the removal efficiencies of TCODcr 92.6%, T-N 83.1%, T-P 81.9%, SS 98.5% were earned as the internal recycle rate was increased to 200%. Especially, nitrogen removal efficiency in the linked treatment showed 74.3%, 54.5%, 83.1% at 100%, 150% and 200% of internal recycle ratio, respectively, which revealed the tendency of higher removal efficiency than that of sewage treatment.
Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
/
2009.06a
/
pp.482-483
/
2009
In chemical mechanical planarization (CMP) process, the uniformity of stress acting on wafer surface is a key factor for uniform material removal of thin film especially in the oxide CMP. In this paper, we analyze the stress on the contact region between wafer and pad with finite-element analysis (FEA). The setting pressure acting on wafer back side was $500g/cm^2$ and the retainer pressure was changed from 300 to $700g/cm^2$. The polishing test is also done with the same conditions. The material removal rate profiles well-matched with stress distribution.
The purpose of this study was to develop a pilot scale bio-filter system removing ammonia gas with microorganisms. The system consisted of chaff(filter medium), a blower, a temperature sensor, a moisture sensor, a solenoid valve, and a heating system. Temperature and moisture contents were controlled via a PC to provide the microorganisms with proper environment. The microorganisms used in this study were Bacillius. coagulans NLRI T-6 and Pseudononas. putida NLRI S-21 of bacilli. Performance tests were performed to evaluate gas removal rate during 20 days. The result was shown that the removal rate was high in early days and gradually dropped below 90% without injecting the microbes. However, it was shown that when injecting the microbes, the removal rate was almost 100% and pH value was maintained at between 7 and 9 during the whole twenty-day period.
This study was accomplished to develope an advanced wastewater treatment process using high MLSS in anoxic tank aimed to improve nutrient removal and to reduce wasting sludge. It was operated with 4 Modes with varing solid concentration and internal recycle ratios. Mode I, II, III was operated 1.0~1.5% MLSS concentration at anoxic tank with 50% sludge recycle rate, however, each internal recycle rate were 100%, 200%, 300% and Mode IV was operated 1.5~2.0% MLSS concentration at anoxic tank with 50% sludge recycle rate and 100% internal recycle rate. The COD removal efficiency didn't show any big difference from Mode I to IV. The average COD removal rate was over than 90%. The T-N removal rate was 73%, the highest rate in all mode. The 36% of SCOD is used for the denitrification and phosphorus release in the anoxic tank. Specific denitrification rate was 3.5mg $NO_3{^-}-N/g$ Mv/hr and denitrification time was 0.7hr. As MLSS concentration is higher in anoxic tank as denitrification time would be shorter. The T-P removal rate was average 70%. The phosphorus release accomplished from the anoxic tank because the anaerobic condition was prevalent in the anoxic due to the prompt completion of denitrification. Sludge production was 0.28 kgVSS/kg $BOD_{removed}$ under the 1.5% MLSS and 17 day SRT. It is prominent result which has 40% sludge reduce comparing with traditional activate sludge system.
A quasi-experimental study was conducted to examine the effect of ice pack application to post cardiac surgery toddlers before C-tube removal. Twenty toddlers aged 13 months to 24 months, who were admitted to the hospital for open heart surgery during the period from July, 1993 to October, 1993 were randomly assigned to the experimental or control group. An ice pack was applied to the C-tube insertion site for 8 minutes before C-tube removal for the experimental group. The children were videotaped during the procedure to assess pain behavior and crying time. The score on the Modified Behavioral Pain Scale(MBPS), crying time, and vital signs were measured to determine the effect of ice pack application. The data were analyzed using Mann-Whitney U test, Paired t-test, and Pearson correlation coefficient. The result of the study are as follows : 1. There was a significant difference between the experimental group and the control group in pain behavior (U=17.0, p=.01). 2. There was no significant difference between the two groups in crying time. 3. There was a significant difference between the two groups in heart rate (U=24.5, p=.05). 4. There was a significant difference between the two groups in systolic blood pressure (U=24.0, p=.05) 5. There was a significant difference between the two groups in diastolic blood pressure (U=23.0, p=.04). 6. There was no significant difference between the two groups in respiration rate. 7. Pain behavior was significantly correlated with heart rate, systolic blood pressure, and crying time (r=.50, .54 and .59, p<.05). The result showed that the ice pack application was effective to reduce pain related to C-tube removal for the toddlers. From the study, it is recommended that the effectiveness of the cold ap-plication to children undergoing different painful procedures be examined to determine the most effective length of cold application to reduce pain in children.
In this study, the (phosphorous removal) the characteristics of phosphorous removal due to (the iron compound precipitated) iron compound precipitation by iron electrolysis in (the anoxic. oxic process) anoxic and oxic processes (equipped with the) in an iron precipitation device were analyzed. During the device operation period, the average concentration of BOD, T-N, and T-P were 219.9 mg/l, 54.6 mg/l and 6.71 mg/l, respectively. The BOD/$COD_{Cr}$ ratio was 0.74, and the BOD/T-N and BOD/T-P ratios were 4.0 and 32.8, respectively. The removal rate of (the organic matters) organic matter (BOD and $COD_{Cr}$) was very high at 91.6% or higher, and that of nitrogen was 80.5%. The phosphorous concentration (of the final) in the treated water was 0.43 mg/l (0.05-0.74 mg/l) on average, and the removal efficiency was high at 90.8%. The soluble T-P concentrations in (an) the anoxic reactor, oxic reactor (II) and final treated water were 1.99 mg/l, 0.79 mg/l and 0.43 mg/l, respectively, which indicated that the phosphorous concentration in the treated water was very low. Regardless of the changes in the concentrations of (organic matters) organic matter, nitrogen and phosphorous in the influent, the quality of the treated water was relatively stable and high. The removal rate of T-P somewhat increased with the increase in the F/M ratio in the influent, and it also linearly increased in proportion to the T-P loading rate in the influent. In the treatment process used in this study, phosphorous was removed (using) by the precipitated iron oxide. Therefore, the consumption of organic (matters) matter for biological phosphorus removal was minimized and (most of the organic matters were) was mostly used as the organic carbon source for the denitrification in the anoxic reactor. This (can be an economic) treatment process (without the need for the supply of additional organic matters) is economic and does not require the supply of additional organic matter.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.