• Title/Summary/Keyword: Owner-Manager

Search Result 86, Processing Time 0.02 seconds

Development of Human Resources Competency Components: An Empirical Study in the Stock Exchange of Thailand

  • CHINNAPONG, Pruksaya;KOOMPAI, Somjintana;AUJIRAPONGPAN, Somnuk;RITKAEW, Supit;JUTIDHARABONGSE, Jaturon
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.8 no.7
    • /
    • pp.635-646
    • /
    • 2021
  • The objectives of this research are to establish and confirm the human resources competency components for listed companies in the Stock Exchange of Thailand. The sample group used in this research includes the company president, business owner, managing director, assistant managing director, general manager or human resources manager of 140 listed companies. The research instrument is a scale-estimated questionnaire. The obtained data were subjected to principal component analysis and were analyzed for the rotation of the perpendicular component using the Varimax method. Results were generated through the analysis of eight components, consisting of decision-making, creativity, strategic thinking, relationship and communication, teamwork, adaptability, self-management, and motivation. The research results demonstrate important components in human resource performance that are critical to the successful development of organizations. Organizations can apply these components to the development of human resource competencies in accordance with the operations that need to be adjusted to suit the changes that occur. These rapidly-changing conditions are important factors that can be studied and developed into variables and components that affect human resource performance in the future. As a result, organizations need to adjust to be well prepared to face problems and challenges in the harsh competitive environment in the future.

A Study on the Agency Theory and Accounting (에이전시이론과 회계감사에 관한 연구)

  • 공해영
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.12 no.20
    • /
    • pp.123-138
    • /
    • 1989
  • The primary objective of the agency research in the game theory lives in the maintenance of Pareto is optimal condition for the optimal incentive contract. The basic concepts which are related to this objective are reviewed in connection with the general assumptions to model it, the moral hazard and adverse selection which arised from the information asymmetry, and finally the problem of risk distribution. The demand for auditing and the role of auditor have been addressed by ASOBAC. Issues which an auditor is explicitly introduced in a principal-agent framework have been addressed in this paper. These issues must be confronted to appropriately with the auditor, and to achieve an adequate understanding of optimal confronting arrangement with the auditor. The first step in introducing an auditor into this analysis is to examine the game-theoretic foundation of such a expended agency model. The Mathematical program formulated may not yield solution that are resonable. This arises because the program may call for the auditor and manager to play dominated Nash equilibra in some subgame. The nontrivial natures of the subgame implies that randomized strategies by the auditor and manager nay be of crucial importance. The possibilities for overcoming the randomized strategy problem were suggested; change the rule of the game and or impose covexity condition. The former seems unjustifiable in on auditing context, and the latter promising but difficult to achieve. The discussion ended with an extension of the revelation principle to the owner manager-auditor game, assuming strategies. An examination of the restriction and improvement direction of the basic concept of agency theory was addressed in the later part of this paper. Many important aspects of auditor incentives are inherently multiple-agent, multiple-period, multiple-objectine, phenomena and require further analyses and researches.

  • PDF

Development of a Project Management System for the Turnkey-based Plant Project (중공업 일괄수주공사를 위한 프로젝트 관리 시스템 개발 사례)

  • Ko, Chang-Seong;Rho, Jae-Jeung;Hyun, Jae-Myung;Kim, Myoung-Gwan
    • IE interfaces
    • /
    • v.11 no.3
    • /
    • pp.167-180
    • /
    • 1998
  • This study is concerned with the development of a project management system for the turnkey-based plant project, which will help the site manager to plan, control, and report the project progress. This system has been developed as one of the modules of the integrated information system for the H Heavy Industry Co. and is composed of five subsystems; project information system, drawing-material management system, process management system, project progress report system. A/S management system. it also integrates commercial project management package in order to schedule the project activities and report the project progress to the owner. The main purpose of the system is to provide project information, including drawing, material, and progress, to the site manger in the real time and to accumulate site know-how for the turnkey-based plant project.

  • PDF

Multi-Dimensional Analysis Method of Maintenance Cost of School Facility (학교시설물 유지관리비용의 다차원분석 방법)

  • Ryu, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.56-57
    • /
    • 2014
  • As school facilities have been expanding quantity better than quality, efficient school facility management has been focused on from 2001 in domestic. Due to obsolescence of school facility, objective management and maintenance cost of school facility is very important. However LCC(Life cycle cost) analyst, owner, engineer, contractor and facility manager have a difficulty to obtain and facilitate the basic analyzed data required to analyze LCC of school facility and establish maintenance plan. Therefore this research presents muti-dimensional analysis method through data warehouse technique for supplying maintenance cost information of school facility that can trace and accumulate the scattered LCCing data in the perspective of life cycle of school facility.

  • PDF

Optimizing a Construction Schedule Considering Cash-flow (현금 흐름을 고려한 건설일정 최적화에 관한 연구)

  • Lee, Hyung-Guk;Lim, Tae-Kyung;Son, Chang-Baek;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.303-305
    • /
    • 2012
  • This paper presents a system called a Cash-flow based Construction Scheduling Optimization (CfSO). The existing CPM is biased on schedule and cost management. For a profitable and successful project management, the cash-flow which occurred actually by contractual conditions should be considered in the project scheduling. Therefore, this study provides a method to estimate the amount of a cash-flow occurred periodically by integrating the terms of contract into scheduling. The proposed methodology is implemented as a system prototype in Microsoft Excel. CfSO helps a site manager as a decision-maker to establish a optimized project scheduling and decide profitable contractual conditions against a construction owner.

  • PDF

A study on the Improvement Plan of Construction Site Management In Korea (국내 건설 현장관리업무의 개선방안에 관한 연구)

  • Kim, Jin-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.4
    • /
    • pp.137-144
    • /
    • 2002
  • In the modern age. Building is getting higher and larger according to owner and social demands. Now when we are facing the need of the cost down and the reduction of economic loss. In this paper, the characteristics of the present conditions of site management were investigated with the field survey. And The Purpose of this study is to suggest the rational plans of construction planning in site management. The method of site management. however depends on experience of a construction manager. in order to solve this situation, it is necessary to create a method of site management that is adequate for the condition of construction. By cultivating excellent sub contractors, we can expect precise construction with a few experts. improvement in qualify of construction from standardization, computerization of each process. And the expectancies of this paper are that it can be used as efficient data for improvement of system to systematize site management work in Korea.

THE KEY SUCCESS VEHICLES FOR FAST-TRACK IN PUBLIC DESIGNBUILD PROJECTS

  • Kyu-Man Cho;Kyo-Jin Koo;Chang-Taek Hyun
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1094-1099
    • /
    • 2005
  • Nowadays the Design-Build Delivery Method in public sector has been remarkably grown up in applying owing to its merits such as shortening construction duration. The Fast-Track is the wide-using method for accelerating schedule at Design-Build projects. But the public agency is in trouble to execute Fast-Track because of the lack of guideline for its process. As a result, in some cases applying Fast-Track methods, cost and construction duration are increased more than cases of non-Fast-Track projects. In this study, through the questionnaire surveys to professionals having actual implementation experiences as a construction manager, owner or general contractor, key success vehicles of Fast-Track are induced.

  • PDF

The Effects of Foreign Ownership on Firm Value (외국인 투자비중이 기업가치에 미치는 영향)

  • Kim, Pyung-Kee
    • Management & Information Systems Review
    • /
    • v.28 no.2
    • /
    • pp.113-134
    • /
    • 2009
  • The purpose of this paper is to investigate the relationship between foreign ownership and firm value. Based on the sample of 3,398 firm-year observations in the period of 2000 to 2007, we find evidence that foreign ownership is positively associated with firm value measured by the market-to-book ratio. In addition, we employ simultaneous equation system where both foreign ownership and firm value are treated as endogenous variables. Simultaneous regression models indicate that the foreign ownership affects firm value, but not vice versa. The positive effects of foreign ownership on firm value result from monitoring and disciplining roles played by foreign investors. Many Korean firms have been run by an owner-manager while monitoring provided by institutional equity holders has been limited. Therefore, Korean firms are expected to suffer from more severe agency costs caused by the conflicts of interest between owner-managers and outside investors. Our empirical results support the notion that foreign investors play an important role in enhancing corporate transparency and improving corporate governance.

  • PDF

An Improved Process System to File a Claim in Construction Projects (건설공사 시 클레임 제기를 위한 프로세스 시스템 개선 방안)

  • Bang, Taewon;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.22-32
    • /
    • 2017
  • Judging from the past cases, the contractor has frequently suffered losses caused by disapproved requests or reduced payments since it has not known the conditions of the contract or it has filed a claim to the owner without any proper claim system. Therefore, the existing claim process needs to be reformed. In order to reform the claim process, the contractor should consolidate the organizational structure, grant accurate duty assignments to the claims manager, implement regular staff training on how to deal with claims. In addition to this reformation, the contractor needs to improve the management of construction period and process control, and manage related documents thoroughly. Regular meetings are also necessary in claims. This study attempts to prove the effectiveness of the reformed process applied to Project "A", where the owner was responsible for the delayed supply of materials, inaccurate oral instructions, insufficient information on the work, and frequent changes of design. The project was completed in 96 months, which was extended by 34 months from the initial construction period of 62 months. The reformed claim process is expected to be of great help not only to largescale construction works but also to smallscale ones.

Measuring of the Performance of a Construction Management Project from Viewpoints of Project Participants -Focusing on Owner, Construction Manager, Designer and Constructor- (건설사업 참여주체(발주자, CMr, 설계자, 시공자) 관점에서 건설사업관리 성과측정에 관한 연구)

  • Ahn, Eun-Jin;Yoo, Byeong-Gi;Lee, Yoon-Sun;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.194-205
    • /
    • 2008
  • The production process of construction industry is different from thing of the general manufacturing, likewise various participants make temporary teamwork for success of the project through sharing of information. But, the each role of participants is Individually changed to step in construction process stage and moreover it has complicated, entangled interests. The CM(so it called Construction Management as an abbreviation word) system was inducted for the effective management and operation of construction project. The key of the CM success depends on the cooperative relationship relation to major participants. There are lots of studies and efforts for the performance measures of the CM, however existing performance index is only measured as the viewpoint of project owner. Therefore it needs to make up for balanced view through combination of the four-way view of participants. In this study, we should search for cooperative relationship of project participants, and then we should suggest to define the difference of project in their viewpoints.