• Title/Summary/Keyword: Overhead power line

Search Result 221, Processing Time 0.035 seconds

A Study on PWM Converter of Auxiliary Power Block for Next Generation High Speed Train (차세대 고속전철용 보조전원장치용 PWM 컨버터에 대한 연구)

  • Jeong, Jeong-Han;Cha, Gil-Ro;Lee, Won-Cheol;Won, Chung-Yuen
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2008.05a
    • /
    • pp.245-248
    • /
    • 2008
  • This paper gives a description of the mode'ling and control of a single phase PWM(Pulse Width Modulation) converter for HEMU-400X(High-speed Electric Multiple Unit - 400 km/h experiment). The converter is part of a Auxiliary power unit supplied by the 25[kV], 60[Hz] overhead line. A model of the converter in a synchronously rotating reference frame of coordinates is used to develop a new type of control. The control system has separate controllers for the active and reactive current, permitting the free choice of the power factor. This paper proposes a new control method of PWM converter for Auxiliary power unit.

  • PDF

A field trial of helically wrapping fiber optic cable onto existing 154KV Phase conductor. (전력선을 이용한 광케이블 현장 실증 시험)

  • Shin, Keon-Hak;Lee, Won-Bin;Cho, Hong-Keun
    • Proceedings of the KIEE Conference
    • /
    • 1987.11a
    • /
    • pp.143-146
    • /
    • 1987
  • Fiber optics provide a solution to the problems at interference, capacity and reliability in communication. Approximately 20 kilometera of a six-fiber, multimode, longwave($1.3{\mu}m$), graded index silica glass fiber optic cable was helically wrapped around a phase conductor at a Korea Electric Power Corporation(KEPCO) 154KV transmission line. This paper presents an economic comparison of several fiber optic cable installation alternative and discusses the characteristics at the helically wrapped fiber cable, as well as the entire installation, including high voltage phase-to-ground (PTG) end termination, and splicing. The fiber link was installed for the field trial and practical use with overhead composite optical fiber cable which installation performed a few years earlier some other location and is intended to accommodate not only telephone but also supervisory Control and Data Acquisition(SCADA), protective relaying, and telemetry functions.

  • PDF

EPON Based Communication Network Architecture for Offshore Wind Power Farm (EPON을 기반으로 한 해상 풍력 단지 통신망 구조)

  • Jung, Jin-Hyo;Yang, Wonhyuk;Kim, Young-Chon
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.38B no.2
    • /
    • pp.130-139
    • /
    • 2013
  • In recent, the communication networks of wind power farm are becoming crucial technologies for monitoring and controlling the large-scale offshore wind power farm. In this paper, EPON based communication network architectures are proposed in order to combat the problems of conventional Ethernet based communication network such as delay, data processing overhead and the fairness of data transmission among turbines in offshore wind power farm. The proposed architecture constructs the point to multi-point network by using OLT and ONUs installed in central control center and wind turbines respectively. The EPON based communication network architecture has low cost, high reliability, and fair transmission capability. To evaluate the performance of proposed architectures, the wind power farm based on IEC 61850 is modelled by using OPNET The simulation results are analyzed and compared with conventional Ethernet based communication network in terms of the overhead, delay and fairness of data transmission.

Characteristics of Fault Current Division Factor & Groud Potential Rise of a Substation fed exclusively by Power Cables (지중케이블 변전소의 고장전류 분류율과 접지전위상승 특성)

  • Choi, Jong-Kee;Jung, Gil-Jo;Kim, Seon-Gu
    • Proceedings of the KIEE Conference
    • /
    • 1998.11a
    • /
    • pp.295-297
    • /
    • 1998
  • This paper shows characteristics of fault current division factor $S_f$, which is a ratio of earth- return current to total fault current, at a substation fed exclusively by power cables under unsymmetrical fault condition, such as single line-to-ground fault. In substation grounding system design, $S_f$ is a very important factor determining GPR, touch and step voltage at a substation under fault condition. In case of substations fed by overhead lines, 40-60% of $S_f$ has been typically used, although it is a very conservative value with no other network conditions considered. It is authors' hope that $S_f$ presented in this paper could hopefully be a basic reference in designing of substation grounding system, especially for a substation fed exclusively by power cables.

  • PDF

A DC-Offset Elimination Algorithm Based on an AR Model (AR모델을 이용한 직류 옵셋 성분 제거 알고리즘)

  • Chang Soo Young;Lee Dong Gyu;Kang Sang Hee
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.289-291
    • /
    • 2004
  • ln this paper, A dc-offset elimination novel algorithm based on an An model is proposed. The algorithm can eliminate dc-offset rapidly than other algorithms. The signal of fault current can be presented as a linear equation combined sinusoidal with exponential signals. Then, the linear equation can be presented an auto-regressive(AR) model and do-offset can be calculated by the equation of AR model. So it is possible to be removed the dc-offset from the original current signal. Performance evaluation of the algorithm was tested on condition that A-phase ground fault on 154kV 25km overhead transmission line.

  • PDF

Calculation of an Induced Voltage on Telecommunication Lines in Parallel Distribution Lines (병행 배전선로에서의 통신선 유도전압 계산)

  • Kim, Hyun-Soo;Rhee, Sang-Bong;Yeo, Sang-Min;Kim, Chul-Hwan;Lyu, Seong-Heon;Kim, Seong-Arm;Weon, Bong-Ju
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.10
    • /
    • pp.1688-1695
    • /
    • 2008
  • Recently, it is common in a distribution system of Korea Electric Power Corporation (KEPCO) to find instances where distribution lines are parallel. A traditional method of an induced voltage calculation is not suitable for parallel distribution lines. For more actual analysis of induced voltage on telecommunication lines in parallel distribution lines, a new calculation method is needed. This paper presents a new calculation method of an induced voltage on telecommunication line using equivalent ${\pi}$ circuits matrix in parallel distribution lines. The advantages of the calculation method are using actual neutral current value and not using screening factor for considering the overhead ground wire and the neutral wire. To verify the effectiveness and the accuracy of the method, various case studies are performed with EMTP(Electro-Magnetic Transients Program).

Development of Pulley Type Running Board for Wiring Work of Overhead Transmission Line (송전선로 가선공사용 활차형 런닝보드 개발)

  • Min, Byeong-Wook;Baik, Seung-Do;Jang, Suk-Han;Wi, Hwa-Bog;Rah, Won-Chan
    • Proceedings of the KIEE Conference
    • /
    • 2005.11b
    • /
    • pp.80-82
    • /
    • 2005
  • There is a method for stringing conductors which is connected to a wire over transmission towers by helicopter or human power and the wire and conductors are pulled by an engine puller. The length of one string section is usually 4-6 km and 2-4 conductors are strung at the same time with a single wire. A tensioner is used to maintain the sag and a running board is installed between the wire and conductors to prevent the rotation of conductors but the variance in topology, the line angle and unequal wiring tension between conductors causes conductor rotation damage or the conductor connection point to breakaway when the pulley is passed. This paper presents a method to prevent conductor rotation during stringing by inserting a pulley in the running board and equally maintaining conductor tension by sling wire after developing and testing.

  • PDF

Off-line Parameter Estimation of Induction Motor for Vector Control In Continuos Process Line

  • Kwon, Byung-Ki;Park, Ga-Woo;Shin, Won-Chang;Cho, Eung-Sang;Lee, Jin-Seop;Choi, Chang-Ho;Hyun, Dong-Seok
    • Proceedings of the KIPE Conference
    • /
    • 1998.10a
    • /
    • pp.386-391
    • /
    • 1998
  • Parameter estimation method of induction motor for vector control is presented in this paper. It can be easily implemented and applied to inverters in the industrial field, because it needs no additional hardware such as voltage sensors and measuring equipment. The proposed algorithm in this paper is so straightforward and practical that it can be easily implemented on the built-in controllers with little overhead. The proposed estimation algorithm has good accuracy and repeatability for parameters due to the sensitivity of estimation errors. This enables its total consuming time to be made shorter. Experimental results and applications in the industrial fields verify the validity and usefulness of the proposed method.

  • PDF

Data Acquisition and Analysis for Running Performance Evaluation of the Electric Train (전동차 주행성능평가를 위한 데이터취득 및 분석)

  • Lee, K.W.;Kim, M.Y.;Baik, K.S.;Shim, J.B.;Chang, S.H.
    • Proceedings of the KIEE Conference
    • /
    • 2006.07b
    • /
    • pp.1099-1100
    • /
    • 2006
  • The running of the electric train are done by powering, breaking and coasting. Powering to start and accelerate the rolling stock means driving the three-phase electric induction motors controlled by VVVF inverters which are connected to overhead power line directly(DC) or indirectly(AC, DC/AC). Breaking is achieved by blending control which is the proportional combination between regenerative breaking of VVVF inverter and air pressure control of breaking operating unit(BOU). Therefore, Data obtained during two operation are very important items to evaluate the running performance of RS. This paper has investigated in real time data acquired from VVVF inverter and measured by pressure sensor directly connected to air breaking line(motor car and trailer car). By analyzing data in the region of time and frequency, fundamental methods for eavaluating the running performance of RS quantitatively and objectively have been suggested.

  • PDF

A Study on the Development of Catenary stagger and height Measurement System (전차선 편위 및 높이 측정 시스템 개발에 관한 연구)

  • Song, Sung-Gun;Park, Seong-Mo
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.299-304
    • /
    • 2008
  • Catenary and Pantograph are a power supply devices for electric trains and shall be steadily contacted. Rail catenary must be installed precisely and managed for stable train operations. But external factors such as weathers, nature, etc., or aging affect catenary geometry. Changed catenary height causes high voltage spark or instant electric disconnection. Big spark and disconnection damage pantograph shoe and catenary coating and might interrupt rail operations. To prevent a big scale spark or electric disconnection catenary maintenance shall be required with catenary geometry measurement systems. In this paper, we describe the development of catenary height and stagger measurement system. The catenary height and stagger measurement system uses Acuity company's AR4000 Range Finder for distance measurement and AccuRange Line Scanner for degree measurement. This system reports suspicious overhead line sections with excessive height and stagger variance.

  • PDF