• Title/Summary/Keyword: Outage Cost

Search Result 102, Processing Time 0.029 seconds

The Study on Economic Evaluation for Investment Cost When the Distribution Automation System is Applied (배전자동화 투자비대 경제적 효과분석에 관한 연구)

  • 하복남;한용희;한병성;이흥호
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.52 no.7
    • /
    • pp.407-413
    • /
    • 2003
  • Before expanding of distribution automation application to distribution network, we must examine whether there are economical effect. Investment expense for distribution automation can be divided into facility investment expense, maintenance expense, communication expense, investment expense etc. Effect of distribution automation can classify by effect that can convert into money and effect that can not convert into money. Representative effect is outage time decrease effect, distribution line loss decrease effect, main transformer upload effect, distribution line upload effect, work environment improvement effect of lineman and so on. This paper studied economical effect and break-even Point for investment expense by using data that acquire in KEPCO's distribution network.

Evaluation of Optimal Transfer Capability in Power System interconnection (연계된 계통간의 최적 송전용량 산정)

  • Son, Hyun-Il;Choi, Ah-Reum;Lee, Sung-Hoon;Kim, Jin-O;Jeon, Dong-Hoon
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.195_196
    • /
    • 2009
  • As the electrical power industry is restructured, the electrical power exchange is becoming extended. One of the key information used to determine how much power can be transferred through the network is known as available transfer capability (ATC). To calculate ATC, traditional deterministic approach is based on the severest case, but the approach has the complexity of procedure. Therefore, novel approach for ATC calculation is proposed using cost-optimization method in this paper, and is compared with well-being method and risk-benefit method. This paper proposes the optimal transfer capability of HVDC system between mainland and a separated island in Korea through these three methods. These methods will consider production cost, wheeling charge through HVDC system and outage cost with one depth (N-1 contingency).

  • PDF

Nodal Probabilistic Production Cost Evaluation using Monte Carlo Simulation Methods (Monte Carlo Simulation을 이용한 각 부하지점별 확률론적 발전비산정)

  • Mun, Seung-Pil;Kim, Hong-Sik;Choe, Jae-Seok
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.51 no.9
    • /
    • pp.425-432
    • /
    • 2002
  • This Paper illustrates a method for evaluating nodal probabilistic production cost using the CMELDC. A new method for constructing CMELDC(CoMposite Power System Equivalent Load Duration Curve) has been developed by authors. The CMELDC can be obtained by convolution integral processing between the probability distribution functions of the fictitious generators outage capacity and the load duration curves at each load point. In general, if complex operating conditions are involved and/or the number of severe events is relatively large, Monte Carlo methods are more efficient. Because of that reason, Monte Carlo Methods are applied for the construction of CMELDC in this study. And IEEE-RTS 24 buses model is used as our case study with satisfactory results.

A Comparative Study on the Electricity Outage Cost Estimations (전력의 공급지장비 추정 사례 조사 연구)

  • 정환삼;김현준
    • Proceedings of the Korea Society for Energy Engineering kosee Conference
    • /
    • 1998.05a
    • /
    • pp.211-219
    • /
    • 1998
  • 전력의 공급지장비 추정은 이질적 경제권간에는 물론이고 동일 경제권 내에서도 추정치가 사례별로 다양한 분포를 갖고 있다. 따라서 일정 목적을 갖고 공급지장비를 추정할 때에는 유사한 목적, 시대 그리고 추정분야에 대한 기존의 사례를 조사하여 참조하여 비교할 필요가 있다. 이러한 점에서 본 연구는 전력의 공급지장비 주요 추정사례를 1948년 스웨덴의 경우 이후 최근에는 1997년 칠레와 이스라엘의 사례까지 조사하여, 이를 추정부문별로 재정리하였다.

  • PDF

A study on the transmission planning using OPF in CBP markets (CBP 시장에서 OPF를 활용한 송전설비계획에 관한 연구)

  • Han, Seok-Man;Kim, Kwang-Mo;Chung, Koo-Hyung;H.Kim, Bal-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.412-413
    • /
    • 2006
  • This paper proposed the transmission planning mechanism in competitive power markets. This mechanism used Optimal Power Flow(OPF) to calculate operation cost and Contingency Constrained OPF(CC-OPF) to consider N-1 contingency outage. In addition, this algorithm deduced a yearly transmission planning using Dynamic Programming(DP).

  • PDF

A Study on Optimal Planning Strategy Based on Customer Outage Costs

  • Kim, Bal-Ho H.
    • Journal of Electrical Engineering and Technology
    • /
    • v.5 no.1
    • /
    • pp.21-27
    • /
    • 2010
  • This paper examines the long-run social welfare maximization problems facing public utilities, which includes consideration of the cost of capital or other fixed costs of production, from which it derives optimal investment decisions in a reliability differentiated pricing based market. Reliability differentiated pricing policies lead to straightforward mathematical results on optimal investment decisions in generation and transmission expansion planning. This paper presents the mathematical conditions for optimal investment decisions.

A Study on Transmission Quality and Frequency Movement for Digital Microwave Link Design (디지탈 마이크로웨이브 링크 설계를 위한 전송품질 및 주파수 이전에 대한 연구)

  • 서경환
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.14 no.5
    • /
    • pp.489-498
    • /
    • 2003
  • Recently to introduce new services of ultra-high speed wireless access and systems beyond the 3rd generation mobile communication, 5 GHz band has been highly interested. As a way of getting the required frequency, it is considered that microwave relay bands below 6 GHz, which shows a slow decrease in demand and less cost-effectiveness, should be moved to other bands above 6 GHz. In this paper, as a tool for analyzing microwave link design and its service quality, the outage prediction based upon Vigants & Barnett's model is reviewed. To show outage and availability calculation, simulations are performed for the operating 4 GHz radio sites, and some results and features regarding frequency movement to 6.7 as well as 8 GHz are also discussed in terms of diversity techniques, bit error rate, and availability As the results, it is confirmed that only the diversity techniques of space or space and frequency can satisfy the annual objective of availability irrespective of frequency movement.

Performance Evaluation of Analog-digital Beamforming for Uplink Multi-User Millimeter Wave Systems (다수 사용자를 지원하는 상향링크 밀리미터 파 시스템을 위한 아날로그-디지털 빔포밍의 성능 평가)

  • Kim, Seong Hwan
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.21 no.1
    • /
    • pp.29-34
    • /
    • 2017
  • This paper considers hybrid beamforming for millimeter wave system in uplink transmission where multiple users send their data streams simultaneously. Hybrid beamforming has low-cost and low power consumption features compared to conventional digital beamforming schemes. We assume that each user uses one transmit antenna and sends one data stream, while the base station has multiple receive antennas and multiple radio frequency chains. Therefore, hybrid beamforming is performed only at the base station. We also assume that each user does not know instantaneous channel side information (CSI), while the base station is able to estimate the CSI from all users accurately. Under this channel assumption, the outage probability is not zero. We evaluate the outage probability of the considered hybrid beamforming as a performance metric through computer simulations. We show that the outage probability of hybrid beamforming approaches that of digital beamforming in some cases.

The Optimization Experience of Occupational Exposure during Unclear Power Plant Outage (원자력발전소 계획예방정비 기간중 피폭최적화 경험)

  • Song, Young-Il;Kim, Hyung-Jin;Park, Hun-Kook;Kim, Hee-Geun
    • Journal of Radiation Protection and Research
    • /
    • v.28 no.2
    • /
    • pp.145-154
    • /
    • 2003
  • By optimizing the radiation protection the collective dose and individual dose could be reduced during YGN #4 $5^{th}$ outage in 2001. The collective doses for the two high radiation jobs decreased to 85% and 65% of expected doses. The proportion of workers with low dose (below 1mSv) exposure increased 4% while the proportion of workers with over 3mSv and 5mSv exposure are decreased to 2%, 1% respectively. But none is exposed over 8mSv for the annual dose. To aid decision of utilizing the robot, cost- benefit analysis was performed and reasonable point was proposed to use the robot. For the first time job, repeated ALARA meeting and mock up training were implemented to set up working procedure by identifying the trouble. To easily set up standard procedure, mockup process was videotaped and reviewed during ALARA meeting. Monitoring is a good approach to chase radiological working condition such as working time, dose rate. behavior of workers, especially for high radiation work. Those data were estimated and adjusted from the stage of work planning to mock up. At the stage of actual work the monitoring data were compared to the estimation and recorded to database. This database will not only be used as a powerful tool for dose optimization at the following outage but also as a guideline to dose constraint set up for optimization for each specific situation.

Application of Particle Swarm Optimization to the Reliability Centered Maintenance Method for Transmission Systems

  • Heo, Jae-Haeng;Lyu, Jae-Kun;Kim, Mun-Kyeom;Park, Jong-Keun
    • Journal of Electrical Engineering and Technology
    • /
    • v.7 no.6
    • /
    • pp.814-823
    • /
    • 2012
  • Electric power transmission utilities make an effort to maximize profit by reducing their electricity supply and operation costs while maintaining their reliability. The development of maintenance strategies for aged components is one of the more effective ways to achieve this goal. The reliability centered approach is a key method in providing optimal maintenance strategies. It considers the tradeoffs between the upfront maintenance costs and the potential costs incurred by reliability losses. This paper discusses the application of the Particle Swarm Optimization (PSO) technique used to find the optimal maintenance strategy for a transmission component in order to achieve the minimum total expected cost composed of Generation Cost (GC), Maintenance Cost (MC), Repair Cost (RC) and Outage Cost (OC). Three components of a transmission system are considered: overhead lines, underground cables and insulators are considered. In regards to aged and aging component, a component state model that uses a modified Markov chain is proposed. A simulation has been performed on an IEEE 9-bus system. The results from this simulation are quite encouraging, and then the proposed approach will be useful in practical maintenance scheduling.