• Title/Summary/Keyword: Orderer

Search Result 24, Processing Time 0.018 seconds

A Scheme Reconfiguration of Whitelisting and Hyperledger Fabric for Cryptocurrency Integrity Transactions (암호화폐 무결성 거래를 위한 Whitelisting과 Hyperledger Fabric 재구성 기법)

  • Su-An Jang;Keun-Ho Lee
    • Journal of Internet of Things and Convergence
    • /
    • v.10 no.1
    • /
    • pp.7-12
    • /
    • 2024
  • To trade cryptocurrency, traders require a personal cryptocurrency wallet. Cryptocurrency itself using blockchain technology is guaranteed excellent security and reliability, so the threat of blockchain hacking is almost impossible, but the exchange environment used by traders for transactions is most subject to hacking threats. Even if transactions are made safely through blockchain during the transaction process, if the trader's wallet information itself is hacked, security cannot be secured in these processes. Exchange hacking is mainly done by stealing a trader's wallet information, giving the hacker access to the victim's wallet assets. In this paper, to prevent this, we would like to reconstruct the existing Hyperledger Fabric structure and propose a system that verifies the identity integrity of traders during the transaction process using whitelisting. The advantage is that through this process, damage to cryptocurrency assets caused by hackers can be prevented and recognized. In addition, we aim to point out and correct problems in the transaction process that may occur if the victim's wallet information is stolen from the existing Hyperledger Fabric.

Analysis of Perception Differences between Construction Workers and Managers Implementing for the Severe Accident Punishment Act: Focused on Measures to Improve Safety Management Effectiveness (중대재해처벌법 시행에 따른 건설현장 근로자와 관리자의 인식차 분석: 안전관리 실효성 향상 방안을 중심으로)

  • Jae-Hwan Cho;Sung Hak Chung
    • Journal of the Korea Safety Management & Science
    • /
    • v.26 no.1
    • /
    • pp.75-89
    • /
    • 2024
  • The objective of this study was to conduct research and analysis using Group Focus Interview to survey the between construction site workers and managers implementing for the Severe Accident Punishment Act. Focused on measures to improve safety management effectiveness for the effectiveness of establishing a safety management system. A plan to improve the efficient safety management system was presented to 50 construction industrial managers and workers. In order to ensure the industrial accident prevention policies appropriately, it is necessary to be aware of safety obligations for workers as well as business operators. In addition, despite the existence of a commentary on the Serious Accident Punishment Act, confusion in the field still persists, so in the event of a major accidents, the obligation to take safety and health education is strengthened, and effective case education is proposed by teaching actual accident cases suitable for actual working sites. It is necessary to make all training mandatory, and it is necessary to reconsider awareness through writing a daily safety log, awareness of risk factors, etc., and writing down risk information. Above all, at the construction ordering stage, it is necessary to keep the construction safety, request corrections and supplements for problems issues that arise, and consult between the orderer and the construction company about the problems issues. Rather than having only the construction company correct or supplement the safety management plan, the contents should be shared with supervisors and workers to establish a more practical solution. Results of this study will contribute to improving the effectiveness of the serious accident and construction safety management system.

A Study on Securing Safety at Small and Medium-sized Construction Sites using The Safety and Health Register at Each Construction Stage (건설 단계별 안전보건대장을 활용한 중·소규모건설현장의 안전성 확보 방안)

  • Lee, Goon-Jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.11
    • /
    • pp.187-192
    • /
    • 2020
  • In the past 20 years, accidents in the construction industry have declined in absolute numbers. On the other hand, disasters occurring at small and medium-sized construction sites account for more than 80% of the entire construction industry and are showing a continuous increase. A system for preparing a safety and health register in stages was enacted to preemptively prevent accidents by mandating responsibility for safety to owners with relatively strong authority in the construction industry. Considerable is needed to become an effective legal system. Although there have been many studies related to safety management plans and hazard prevention plans, there are no studies on the safety and health register. Therefore, in this study, an improved safety management procedure connected with the orderer's safety and health management procedure was presented as a plan for reducing accidents at small and medium-sized construction sites. All information was made as a data-based procedure to reduce the burden on the manager. The results of this study are expected to be used as basic data for the development of a safety management support information system for small and medium-sized construction sites.

A Study on the Need of Specialized Institution for Post-Evaluation of Construction Projects (건설공사 사후평가 전문기관 설치 필요성 연구)

  • Lee, Du-Heon;Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.2
    • /
    • pp.285-295
    • /
    • 2016
  • The post-evaluation system after construction projects can evaluate estimates of use demand, project cost, and project schedule estimated in the planning phase of construction projects in public sector. Thus, it was introduced in 2000 for the purpose of reduction in future errors during similar constructions by project orderer by referring the post-evaluation results. However, many barriers to the post-evaluation system after construction projects have been reported due to evaluation systems that lack objectivity and reliability and lack of main bodies that utilize the system. Thus, this study derived implications for improvements of the post-evaluation system in Korea by benchmarking building project evaluation system and management as well as utilization systems of developed nations. Then this study conducted a survey with experts who have experienced activities in the post-evaluation committee and members of post-evaluation for public project owners. Therefore it identified the need of installation of specialized post-evaluation institutions as well as functions and work tasks to be taken by specialized institutions. Based on the analysis results, this paper provided revision drafts of related legislations and guidelines to be effective in post-evaluation. Through the study results, many trial and errors can be reduced in similar projects in the future by performing in-depth analysis on large-scale construction projects and repeatedly applied building project practices can be improved to raise technical competitiveness if the specialized institution is installed.