• Title/Summary/Keyword: Order Management System

Search Result 6,899, Processing Time 0.031 seconds

Development of a Call Center System using CTI : A Proxy Driving System (CTI를 이용한 콜센터 시스템 개발 : 대리운전 시스템)

  • Park, Sang-Sung;Jung, Won-Gyo;Shin, Young-Guen;Jang, Dong-Sik
    • IE interfaces
    • /
    • v.20 no.3
    • /
    • pp.309-314
    • /
    • 2007
  • By an explosive increase of proxy driving, customers require the quick and correct services of call center. But because most call centers have an unsystematic management system, grievance of customers is continually increasing. To solve these problem, we constructed a call center system of proxy driving that is based on CTI (Computer Telephony Integration) in this paper. The proposed system is constructed using CID (Caller Identify Display) terminal, SMS (Short Message Service) and call center management program etc. Customer service level could be improved through efficient customer management by using the proposed system. Also it could be convenient and easy to implement customer management, order management, staff management, SMS and settlement of accounts.

Accuracy improvement of a collaborative filtering recommender system using attribute of age (목표고객의 연령속성을 이용한 협력적 필터링 추천 시스템의 정확도 향상)

  • Lee, Seog-Hwan;Park, Seung-Hun
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.2
    • /
    • pp.169-177
    • /
    • 2011
  • In this paper, the author devised new decision recommendation ordering method of items attributed by age to improve accuracy of recommender system. In conventional recommendation system, recommendation order is decided by high order of preference prediction. However, in this paper, recommendation accuracy is improved by decision recommendation order method that reflect age attribute of target customer and neighborhood in preference prediction. By applying decision recommendation order method to recommender system, recommendation accuracy is improved more than conventional ordering method of recommendation.

Building up an IT Service Management System through the ISO 20000 Certification

  • Park, Jung-Hoon;Kim, Hwan-Min
    • International Journal of Knowledge Content Development & Technology
    • /
    • v.2 no.2
    • /
    • pp.31-45
    • /
    • 2012
  • This study prepared a foundation to provide high-quality services in a stable and effective way to meet the customer expectations, by building up and establishing an ISO 20000 certified IT service management system and protecting the information assets from various threats through effective system operation that meets the requirements of international standards, in order to ensure the reliability and stability of NDSL public services provided by KISTI Information Service Center and to enhance the customer satisfaction.

Development of Quality Document Management System Using Hypertext (하이퍼텍스트를 이용한 품질문서 관리시스템 구축 사례)

  • 정현석;남호수;박동준;김호균
    • Journal of Korean Society for Quality Management
    • /
    • v.28 no.3
    • /
    • pp.104-113
    • /
    • 2000
  • In this paper, we present a useful system to manage the quality documents, using the concept of hypertext in HANGUEL wordprocessor, In order to develop this system, we classify all manuals, procedures and forms into files. A relationship chart of these files is constructed and files are hyperlinked according to this chart. We apply this quality document management system using hyper- text to a small precision manufacturing firm by analyzing its all kinds of quality documents. We confirm that this system effectively reduces the handling time of quality documents and supports revising task of quality documents with consistency.

  • PDF

The Development of Computer Integrated Safety Diagnosis System for Press Process (PRESS 공정의 컴퓨터 통합 안전 진단시스템 구축에 관한 연구)

  • 강경식;나승훈;김태호
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.18 no.36
    • /
    • pp.175-182
    • /
    • 1995
  • Industrial safety management program can be divided three part that is education, technology, and management. The effectiveness of a industrial safety management program depends on the ability to manage hardware which is technology and software, education and management, In this research, it will be described that how to design and develop Computer Integrated Safety System and Computer Based Training System for Press operations which is how to integrated industrial safety program wi th production planning and control in order to control efficiently using personnel computer system.

  • PDF

A Study on the Application of Quality Function Deployment to Information System Development (정보시스템 개발에 있어서 품질기능전개의 활용에 관한 연구)

  • 안원석;박영택
    • Journal of Korean Society for Quality Management
    • /
    • v.27 no.1
    • /
    • pp.111-134
    • /
    • 1999
  • Although the role of information system has been rapidly increasing in modern management, there have been few researches on the quality assurance in information system. This paper suggests how to apply quality function deployment(QFD) to information system development in order to build up user-centered quality assurance system. The main focus of the paper is how to design the linkages between management strategy, information systems, and the users using quality function deployment.

  • PDF

The Loss Control Management System for Continuous Improvement of the Petrochemical Industries (석유화학산업에서의 지속적 발전을 위한 손실관리시스템 개발)

  • Ko Jae Wook;Lim Dong Ho;Yoo Jin Hwan
    • Journal of the Korean Institute of Gas
    • /
    • v.9 no.3 s.28
    • /
    • pp.15-20
    • /
    • 2005
  • Recently, Environmental and Safety Management is approaching in order to reduce the loss cost of accidents in effect, efficiency, excellency. In the side that is a large production enemy of the industrialization times, Most companies are focused on decreasing the loss that can let their companies grow healthily than a productivity improvement. The this study analyzed a matter asked f3r basic requirements and continuous development of ISO14001, OHSAS18001, PSM, Responsible Care operating in petro-chemical industries basically, and developed a LCMCI(the Loss Control Management system for Continuous Improvement of the Petro-chemical Industries) fer continuous development of petro-chemical companies in order to be able to continuously manage a loss.

  • PDF

Improving Self-control Safety & Management Ability of Construction Contractors (건설업체 자율안전관리 능력제고 방안)

  • Lee, Song;Son, Gi-Sang;Choi, Won-Il;Oh, Tae-Sang;Chae, Jum-Sik
    • Journal of the Korean Society of Safety
    • /
    • v.15 no.4
    • /
    • pp.112-118
    • /
    • 2000
  • This paper is resulted from the research to activate Self-control Safety Management system that adopted to improve an assessment system for Hazard Prevention Plan. And members of company, university and research institute have jointly participated in the research. First, it is investigated that introduced background and processing method with existing practical data & materials references in order to understand what domestic Self-control Safety Management system will be available for. And general construction company at site have their ability to assess Hazard Prevention Plan by mailing questionnaire to on thousand site, visits, and interviews. Also, It is investigated how much they have the assessment ability. It is selected to do a questionnaire survey for the status of self-regulatory safety assessment ability of the designated self-regulatory companies in order to produce and enhance the self-regulatory assessment ability and the necessity of Self-control Safety Management system. Finally, it is selected to do a questionnaire survey for fixing and the enhance Self-control Safety Management system of general construction contractors.

  • PDF

A Probabilistic Order Level System When Delay in Payment Is Permissible

  • Shah, Mita H.
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.18 no.2
    • /
    • pp.175-182
    • /
    • 1993
  • The probabilistic order level inventory model is developed when a supplier allows some credit period T for settling the accounts for purchase quantity. The credit period T is known constant. Mathematical models are derived for both the cases i) T'.leq. T and ii) T'>T. Expressions are derived for average expected total cost of the system, the optimum cycle time and for obtaining optimum order level S = S$_{0}$ in each case. The exmaples are given to illustrate the model.

  • PDF

A study on the integrated data modeling for the plant design management system and the plant design system using relational database (관계형 데이터베이스를 이용한 PDMS/PDS의 통합 데이터 모델링에 관한 연구)

  • 양영태;김재균
    • Journal of Ocean Engineering and Technology
    • /
    • v.11 no.3
    • /
    • pp.200-211
    • /
    • 1997
  • Most recently, offshore Engineering & Construction field is concerned about integration management technology such as CIM(Computer Integrated Manufacturing), PDM(Product Data Management) and Enterprise Information Engineering in order to cope with the rapid change of engineering and manufacturer specification as per owner's requirement during construction stage of the project. System integration and integrated data modeling with relational database in integration management technology improve the quality of product and reduce the period of the construction project by reason of owing design information jointly. This paper represents the design methodology of system integration using Business Process Reengineering by the case study. The case study is about the offshore plant material information process from front end engineering design to detail engineering for the construction and the basis of monitoring system by integrating and sharing the design information between the 2D intelligent P&ID and 3D plant modeling using relational database. As a result of the integrated data modeling and system integration, it is possible to maintain the consistency of design process in point of view of the material balancing and reduce the design assumption/duration. Near future, this system will be expanded and connected with the MRP(Material Requirement Planing) and the POR (Purchase Order Requisition) system.

  • PDF