• Title/Summary/Keyword: Optimal maintenance method

Search Result 292, Processing Time 0.022 seconds

Optimal strengthening in RC Hollow Slab Bridges using ${\mu}$-GA (${\mu}$-GA에 의한 RC 중공슬래브교의 최적보강)

  • Choi, Se-Hyu;Park, Kyung-Sik
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.4
    • /
    • pp.169-178
    • /
    • 2010
  • In this study, the optimal strengthening by micro genetic algorithm(${\mu}$-GA) method is proposed for improvement of load-carrying capacity of RC hollow slab bridges using external prestressing. The Qeen-post type and King-post type are considered for the optimal strengthening. The type for optimal strengthening, deviator, areas of tendons and the number of anchor are calculated by ${\mu}$-GA. The objective function is constituted with dimensionless cost of tendon and steel for optimal strengthening. The constraints are formulated by design specification for bridges and anchors. The validity of this study is presented by analysis of the results after the optimal strengthening of the RC hollow slab bridge.

Generating unit Maintenance Scheduling based on PSO Algorithm (PSO알고리즘에 기초한 발전기 보수정지)

  • Park, Young-Soo;Kim, Jin-Ho;Park, June-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2006.11a
    • /
    • pp.222-224
    • /
    • 2006
  • This paper addresses a particle swarm optimization-based approach for solving a generating unit maintenance scheduling problem(GMS) with some constraints. We focus on the power system reliability such as reserve ratio better than cost function as the objective function of GMS problem. It is shown that particle swarm optimization-based method is effective in obtaining feasible schedules such as GMS problem related to power system planning and operation. In this paper, we find the optimal solution of the GMS problem within a specific time horizon using particle swarm optimization algorithm. Simple case study with 16-generators system is applicable to the GMS problem. From the result, we can conclude that PSO is enough to look for the optimal solution properly in the generating unit maintenance scheduling problem.

  • PDF

Optimal Spare Provisioning for Group Replacement Policy (경제적인 그룹교체보전을 위한 최적 예비품 재고수준의 결정)

  • Yoo, Young Kwan;Park, Roh Gook
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.9 no.2
    • /
    • pp.81-86
    • /
    • 2014
  • In this paper, a jointly optimal group replacement and spare provisioning policy is presented. Most maintenance policies assume that the spare inventory is always available, but in practice the maintenance schedule is affected by the availability of spare inventory. We present a maintenance-inventory model which jointly optimizes the group replacement interval and spare ordering quantity. Group replacement policy is used when a group of units are put in operation simultaneously. The operating fleet is replaced altogether at a predetermined number of units are failed. A sufficient level of spare inventory is carried to perform a number of group replacement. A cost rate expression which considers the group maintenance cost and inventory holding cost is derived and a heuristic method for searching the optimum value of decision variables is suggested. Numerical examples demonstrate the analytical results and the performance of the presented model.

  • PDF

A Study on Determination of Optimal Prevention Maintenance Interval for Gantry Crane in Container Terminal (선박작업 생산성 향상을 위한 갠트리 크레인의 고장분석 및 예방보전 주기 결정에 관한 연구)

  • Kim Hwan-Seong;Kim Young-Ho;Tran Ngoc Hoang Son
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2006.06b
    • /
    • pp.339-344
    • /
    • 2006
  • The productivity for container hand1ing in container ship is a important role in container terminal, and it is mainly depended on the productivity of gantry crane. From the failure of gantry crane, the crane will be stopped until the repair of the failure. During the repair, the loading and/or discharging for container ship is suspended, and the productivities of the container ship and the yard is just hold. Thus, the prevention maintenance is importance to make a keep the steady state condition for all equipments in container terminal. In this paper, we deal with a optimal determination method of prevention maintenance interval for gantry crane systems. For verification, we will make a productivity of gantry crane and adapt to total container handling in each ship by simulation.

  • PDF

Condition-Based Model for Preventive Maintenance of Armor Units of Rubble-Mound Breakwaters using Stochastic Process (추계학적 확률과정을 이용한 경사제 피복재의 예방적 유지관리를 위한 조건기반모형)

  • Lee, Cheol-Eung
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.28 no.4
    • /
    • pp.191-201
    • /
    • 2016
  • A stochastic process has been used to develop a condition-based model for preventive maintenance of armor units of rubble-mound breakwaters that can make a decision the optimal interval at which some repair actions should be performed under the perfect maintenance. The proposed cost model in this paper based on renewal reward process can take account of the interest rate, also consider the unplanned maintenance cost which has been treated like a constant in the previous studies to be a time-dependent random variable. A function for the unplanned maintenance cost has been mathematically proposed so that the cumulative damage, serviceability limit and importance of structure can be taken into account, by which a age-based maintenance can be extended to a condition-based maintenance straightforwardly. The coefficients involved in the function can also be properly estimated using a method expressed in this paper. Two stochastic processes, Wiener process and gamma process have been applied to armor stones of rubble-mound breakwaters. By evaluating the expected total cost rate as a function of time for various serviceability limits, interest rates and importances of structure, the optimal period of preventive maintenance can easily determined through the minimization of the expected total cost rate. For a fixed serviceability limit, it shows that the optimal period has been delayed while the interest rate increases, so that the expected total cost rate has become lower. In addition, the gamma process tends to estimate the optimal period more conservatively than the Wiener process. Finally, it is found that the more crucial the level of importance of structure becomes, the more often preventive maintenances should be carried out.

A Study on the Improvement for EMU Maintenance System of Urban Transit (도시철도 전동차 유지보수체계의 개선에 관한 연구)

  • Kim, Kyu-Joong;Lee, Keun-Oh
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.1
    • /
    • pp.87-92
    • /
    • 2010
  • Urban transit system must secure fast, safe and reliable transportation capacity as a metropolitan mass transit. For this purpose, it is important to make all the sub-systems (which consist of EMU, power feeding, signaling & telecommunication, railway, platform facility, and control system and so on) work well. To operate all the systems effectively and reliably, a maintenance measure optimal to each system's characteristics is needed to be established and executed. So, highly reliable maintenance should be performed. But, EMU maintenance methods suitable to its own model and EMU lines are not yet introduced. This study examined few examples mainly to secure reliability on a maintenance quality in operating method and the features of train maintenance system based on travel distance.

An Efficient Incremental Maintenance of SPJ Materialized Views (SPJ 실체화 뷰의 효율적인 점진적 관리 기법)

  • Lee, Ki-Yong;Son, Jin-Hyun;Kim, Myoung-Ho
    • The KIPS Transactions:PartD
    • /
    • v.13D no.6 s.109
    • /
    • pp.797-806
    • /
    • 2006
  • In the data warehouse environment, materialized views are typically used to support efficient query processing. Materialized views need to be updated when source data change. Since the update of the views need impose a significant overhead, it is essential to update the views efficiently. Though various view maintenance strategies have been discussed in the past, the efficient maintenance of SPJ materialized views has not been sufficiently investigated. In this paper, we propose an efficient incremental view maintenance method for SPJ materialized views that minimizes the total accesses to data sources. The proposed method finds an optimal view maintenance strategy using a dynamic programming algorithm. We also present various experimental results that shows the efficiency of our proposed method.

Optimal Design of Bridge Substructure Considering Uncertainty (불확실성을 고려한 교량 하부구조 최적설계)

  • Pack, Jang-Ho;Shin, Young-Seok;Shin, Wook-Bum;Lee, Jae-Woo
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.387-390
    • /
    • 2008
  • The importance of the life cycle cost analysis for construction projects of bridge has been recognized over the last decades. Accordingly, theoretical models, guidelines, and supporting softwares have been developed for the life cycle cost analysis of bridges. However, it is difficult to predict life cycle cost considering uncertainties precisely. This paper presents methodology for optimal design of substructure for a steel box bridge. Total life cycle cost for the service life is calculated as sum of initial cost, damage cost considering uncertainty, maintenance cost, repair and rehabilitation cost. The optimization method is applied to design of a bridge substructure with minimal cost, in which the objective function is set to life cycle cost and constraints are formulated on the basis of Korean Bridge Design Specification. Initial cost is calculated based on standard costs of the Korea Construction Price Index and damage cost on the damage probabilities to consider the uncertainty of load and resistance. An advanced first-order second moment method is used as a practical tool for reliability analysis using damage probability. Maintenance cost and cycle is determined by a stochastic method and user cost includes traffic operation costs and time delay costs.

  • PDF

An Analysis of the Energy Saving Effect Through the Retrofit and the Optimal Operation for HVAC Systems (공조설비 운전방법 및 시설개선을 통한 에너지절약 효과분석)

  • Kim, Yong-Ki;Lee, Tae-Won
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.24 no.4
    • /
    • pp.343-350
    • /
    • 2012
  • The major goal of building energy management is to minimize the energy consumption while maintaining the comfortable environment condition. Nowadays building energy management to save HVAC energy and so on is the most critical issue for existing building service branch with high efficiency equipments and their optimal operation. The effects on the building energy savings of the building equipment retrofit and the improvement of its operation method, especially in the field of HVAC system, were analyzed in this study for domestic small and/or medium sized buildings. Over 8.8% of energy saving was achieved compared withe total energy consumption in commercial building. These results could be used for reasonable maintenance and efficient management of the various building service equipments and related systems.

Development of the Corrosion Deterioration Inspection Tool for Transmission Tower Members

  • Woo, Sangkyun;Chu, Inyeop;Youn, Byongdon;Kim, Kijung
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.2
    • /
    • pp.293-298
    • /
    • 2016
  • Recently, interests for maintenance of transmission tower are increasing to extend life of structures and reduce maintenance cost. However, existing classical diagnosis method of corrosion deteriorated degree on the transmission tower steel members, visual inspection, has a problem that error often due to difference of inspector's individual knowledge and experience. In order to solve the problem, this study carried out to develop the corrosion deterioration inspection tool for transmission tower steel members. This tool is composed of camera equipment and computer-aided diagnosis system. We standardized the photographing method by camera equipment to obtain suitable pictures for image processing. Diagnosis system was designed to evaluate automatically degree of corrosion deterioration for member of transmission tower on the basis of the RGB color image processing techniques. It is anticipated that developed the corrosion deterioration inspection tool will be very helpful in decision of optimal maintenance time for transmission tower corrosion.