• 제목/요약/키워드: Optimal construction cost

검색결과 368건 처리시간 0.027초

토공사를 위한 건설장비 투입 최적 조합 산정 시스템 개발 (Development of Determination System for Optimal Combination of Earthwork Equipments)

  • 박재우;염동준
    • 한국산업융합학회 논문집
    • /
    • 제23권6_2호
    • /
    • pp.957-969
    • /
    • 2020
  • The primary objective of this study is to develop a determination system for an optimal combination of earthwork equipment that improves the traditional way in convenience, prediction accuracy, and productivity. For this, the following research works are conducted sequentially; 1)literature review, 2)technology development trend analysis, 3)develop a determination system for the optimal combination of earthwork equipment, 4)simulation of a developed system. As a result, core considerations are deducted for the development of a determination system. Furthermore, site simulation is performed using a developed system. Site simulation result, Cluster 1(R1200LC 7㎥, CAT 775G 65ton×2) was selected from 6 clusters because of its production cost (₩491/㎥). It is expected that the application range and impact on the construction industry will be enormous due to the availability of the developed system.

A Comprehensive Cash Management Model for Construction Projects Using Ant Colony Optimization

  • Mohamed Abdel-Raheem;Maged E. Georgy;Moheeb Ibrahim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.243-251
    • /
    • 2013
  • Cash management is a major concern for all contractors in the construction industry. It is arguable that cash is the most critical resource of all. A contractor needs to secure sufficient funds to navigate the project to the end, while keeping an eye on maximizing profits along the way. Past research attempted to address such topic via developing models to tackle the time-cost tradeoff problem, cash flow forecasting, and cash flow management. Yet, little was done to integrate the three aspects of cash management together. This paper, as such, presents a comprehensive model that integrates the time-cost tradeoff problem, cash flow management, and cash flow forecasting. First, the model determines the project optimal completion time by considering the different alternative construction methods available for executing project activities. Second, it investigates different funding alternatives and proposes a project-level cash management plan. Two funding alternatives are considered; they are borrowing and company own financing. The model was built as a combinatorial optimization model that utilizes ant colony search capabilities. The model also utilizes Microsoft Project software and spreadsheets to maintain an environment that incorporates activities, their durations, and other project data, in order to estimate project completion time and cost. Ant Colony Optimization algorithm was coded as a Macro program using VBA. Finally, an example project was used to test the developed model, where it acted reliably in maximizing the contractor's profit in the test project.

  • PDF

비정형 건축물 외장패널의 최적화에 관한 연구 (A Study on the Optimization of the Free-Form Buildings Façade Panels)

  • 임장식;옥종호
    • 한국CDE학회논문집
    • /
    • 제19권2호
    • /
    • pp.91-102
    • /
    • 2014
  • The outer surface of an irregular structure contains panels with two-directional curvature called NURBS. To construct these forms of exterior materials, complex geometric surface should be divided into forms and sizes that can be manufactured and constructed. Because the bigger the curvatures of these divided exterior panel, the more expensive the construction costs, these complex two-directional curvatures should go through optimal process of reinterpretation to minimize the curved surfaces with complex two-directional curvatures. Yet, to gain higher ground in technological competition in the field of irregular structure construction, companies do not share know-how that they obtained. Accordingly, small construction and design companies have trouble calculating even rough estimate and cannot adjust expected construction cost based on comparison of design alternatives. Given this situation, this study conducted the research that can support decision-making in the design stage of the construction and provide basic material for optimal range to reduce manufacturing cost by the minimizing the distorted plane of the irregular structure.

건축공사 내역서 세부항목 구성에 대한 사례연구 (A Case Study on Improvement for Optimal Organization of Work Items in Construction Bill of Quantities)

  • 노혜라;윤석헌
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 추계 학술논문 발표대회
    • /
    • pp.67-68
    • /
    • 2016
  • In construction management, BoQ(Bill of Quantities) has been commonly used for the cost estimation. However, many problems have been recognized about the work items used in the BoQ that could be varied by the experience and knowledge of the estimators or the project. Also, there are lots of work items that have to be written in BoQ even though the cost proportion of those items is relatively lower than the others. In this study we consider the way how to organize optimally the work items through the analysis of case. The results of this study could be useful for improving the efficiency of preparing construction BoQ and conducting Quantity take-off in our construction management practices.

  • PDF

중간재고점(中間在庫點) 최적위치선정(最適位置選定)에 관(關)한 연구(硏究) (A Study on the Optimal Location of Physical Distribution Centers)

  • 김만식
    • 대한산업공학회지
    • /
    • 제1권2호
    • /
    • pp.39-49
    • /
    • 1975
  • The problem treated is that of locating distribution centers(depot) in a network, so as to minimize the total cost which is the sum of transportation cost, (from factory to centers and from centers to demand points), construction cost, inventory cost and traffic increasing cost. This problem is mathematically an integer program and a non-linear model. This study avoids various inefficient aspects, which many studies have shown, by introducing a matrix notation, node and link function. An algorithm, for determining the optimal location of distribution center which has zone in which demand points are located at some node of a network, is presented. Finally this paper describes a numerical example and discusses its results.

  • PDF

농업용 저수지 설계를 위한 저수량 최적화 모형의 개발 (Development of the Optimal Reservoir Storage Determination Model for Supplying Rural Water)

  • 정하우;박태선;최진용
    • 한국농공학회지
    • /
    • 제40권2호
    • /
    • pp.69-80
    • /
    • 1998
  • The optimal reservoir storage capacity is needed to be determined at the stage of reservoir planning. The reservoir storage capacity should be based on water balance between demand and supply, and meet the water deficity during the growing season. However, the optimal reservoir storage capacity should be determined considering benefit-cost analysis for the project. In this study, Two models are developed. The one is the RSOM(Reservoir Storage Optimization Model), that is consisted by three submodels, MROPER (Modified Reservoir OPERation model), RESICO(REservoir SIze and the construction COst computation) model. And the other is the BECA(BEnefit-Cost Anaysis) model. For model application, three districts, Chungha, Ipsil and Edong were selected. The relative difference of B/C ratio between project planning data and estimation by RSOM is 17.9, 15.0 and 7.3% respectively, which may be applicable for water resources development feasibility planning.

  • PDF

프리스트레스트 콘크리트 박스 거더 교량의 단면최적화 (The Section Optimization of Prestressed Concrete Box Girder Bridges)

  • 노금래;김만철;박선규;이인원
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 1998년도 가을 학술발표대회 논문집(III)
    • /
    • pp.718-723
    • /
    • 1998
  • The program which could determine cross-sectional dimension of the prestressed concrete box girder bridges at the stage of preliminary design was developed using the optimal technique in this study. It could minimize the cost required in the design of box girder bridges and the construction with the full staging method. Objective cost function consisted of six independent variables such as height of cross-section, jacking force and thickness of web and bottom flange. The SUMT(Sequntial Unconstrained minimization Technique) was used to solve the constrained nonlinear minimization optimal problem. Using the program developed in this study, optimum design was performed for existing bridges with one cell cross section of constant depth. The result verify the compatibility of the program.

  • PDF

발전기 출력특성을 고려한 최적전원구성 연구 (A Study of Optimal Fuel-Mix Considering Power Generation Operation)

  • 정영범;김길신;박창호;윤용범
    • 조명전기설비학회논문지
    • /
    • 제25권10호
    • /
    • pp.28-37
    • /
    • 2011
  • Though Korea has introduced CBP(Cost Based pool) power trading system since 2001, long-term Generation system planning has been executed by government for Cost minimization every 2 years. Until currently the model which is used for Generation system planning and best-mix only considers cost minimization and total yearly or quarterly electricity demand every year. In a view point of one day power supply operation, technical characteristics, like the ramp up/down rate of total generation system, minimum up/down time and GFRQ(Governor Free Response Quantity), are very important. this paper analyzes Optimal Fuel-Mix for 2022 Korea generation system satisfying these constraints of each fuel type and considering pump storage plants, construction cost and $CO_2$ emission charge Using MILP(Mixed Integer Linear Programming) method. Also the sensitivity analysis which follows in future power industry environmental change accomplished.

GIS를 이용한 분기형 관로의 최적설계 (Optimal Design of Branched Water Supply System with GIS)

  • 김중훈;연상호;김종우
    • 대한공간정보학회지
    • /
    • 제4권2호
    • /
    • pp.55-61
    • /
    • 1996
  • 본 논문의 목적은 분기형 관로에 대해 선형계획법을 이용하여 최적의 선계를 하는데 있다. 그리고 자료의 획득과 계산결과를 표시하는 측면에서 GIS의 도움을 받아 전체작업을 좀 더 신속하고 용이하게끔 하였다. 개발된 모형은 송수터널이나 정수장 같은 수리부속물의 영향도 고려해 주었으며 특히 송수터널같이 관로와는 다른 체계를 갖는 비용을 목적함수에서 고려해줄 수 있었다. 목적함수는 초기건설비측면뿐 아니라 연간유지비측면의 비용까지도 고려해주어 보다 합리적인 걸과를 제시해주었으며 계산된 수리결과도 보다 실무적으로 제시되었다. 예를 들어 결정변수로 관경대신 관길이를 잡음으로 해서 이산적인 형태의 관경을 고려해줄 수 있었다. 그리고 최적 양정고는 물론이고 양수장의 위치와 갯수까지도 구해 낼 수 있었다. GIS는 수리학적 자료나 비용자료를 자동으로 다루거나 계산된 최적의 결과를 가시화 하는데 이용되었다. 특히 실제하는 관로시스템에 적용되었으며 GIS의 도움으로 보다 경제적인 설계를 학 수 있도록 의사결정과정상에 도움이 되었고 이로써 실무에도 훌륭히 적용될 수 있는 모형이라 생각되었다.

  • PDF

Fuzzy optimization for the removal of uranium from mine water using batch electrocoagulation: A case study

  • Choi, Angelo Earvin Sy;Futalan, Cybelle Concepcion Morales;Yee, Jurng-Jae
    • Nuclear Engineering and Technology
    • /
    • 제52권7호
    • /
    • pp.1471-1480
    • /
    • 2020
  • This research presents a case study on the remediation of a radioactive waste (uranium: U) utilizing a multi-objective fuzzy optimization in an electrocoagulation process for the iron-stainless steel and aluminum-stainless steel anode/cathode systems. The incorporation of the cumulative uncertainty of result, operational cost and energy consumption are essential key elements in determining the feasibility of the developed model equations in satisfying specific maximum contaminant level (MCL) required by stringent environmental regulations worldwide. Pareto-optimal solutions showed that the iron system (0 ㎍/L U: 492 USD/g-U) outperformed the aluminum system (96 ㎍/L U: 747 USD/g-U) in terms of the retained uranium concentration and energy consumption. Thus, the iron system was further carried out in a multi-objective analysis due to its feasibility in satisfying various uranium standard regulatory limits. Based on the 30 ㎍/L MCL, the decision-making process via fuzzy logic showed an overall satisfaction of 6.1% at a treatment time and current density of 101.6 min and 59.9 mA/㎠, respectively. The fuzzy optimal solution reveals the following: uranium concentration - 5 ㎍/L, cumulative uncertainty - 25 ㎍/L, energy consumption - 461.7 kWh/g-U and operational cost based on electricity cost in the United States - 60.0 USD/g-U, South Korea - 55.4 USD/g-U and Finland - 78.5 USD/g-U.