Decision-making of alternative pylon shapes of a benchmark cable-stayed bridge using seismic risk assessment

  • Akhoondzade-Noghabi, Vahid;Bargi, Khosrow
    • Earthquakes and Structures
    • /
    • v.11 no.4
    • /
    • pp.583-607
    • /
    • 2016
  • One of the main applications of seismic risk assessment is that an specific design could be selected for a bridge from different alternatives by considering damage losses alongside primary construction costs. Therefore, in this paper, the focus is on selecting the shape of pylon, which is a changeable component in the design of a cable-stayed bridge, as a double criterion decision-making problem. Different shapes of pylons include H, A, Y, and diamond shape, and the two criterion are construction costs and probable earthquake losses. In this research, decision-making is performed by using developed seismic risk assessment process as a powerful method. Considering the existing uncertainties in seismic risk assessment process, the combined incremental dynamic analysis (IDA) and uniform design (UD) based fragility assessment method is proposed, in which the UD method is utilized to provide the logical capacity models of the structure, and the IDA method is employed to give the probabilistic seismic demand model of structure. Using the aforementioned models and by defining damage states, the fragility curves of the bridge system are obtained for the different pylon shapes usage. Finally, by combining the fragility curves with damage losses and implementing the proposed cost-loss-benefit (CLB) method, the seismic risk assessment process is developed with financial-comparative approach. Thus, the optimal shape of the pylon can be determined using double criterion decision-making. The final results of decision-making study indicate that the optimal pylon shapes for the studied span of cable-stayed bridge are, respectively, H shape, diamond shape, Y shape, and A shape.

A Study on the Evaluation of Energy Consumption of the Air Compressor (공기압축기 소비에너지 평가에 관한 연구)

  • Jang, Ji Seong
    • Journal of Drive and Control
    • /
    • v.17 no.2
    • /
    • pp.38-44
    • /
    • 2020
  • Various efforts have been initiated to reduce the energy consumption of the compressor as it is one of the approaches to saving a large portion of the fixed cost of the production site. Various results of reducing the energy consumption of the compressor have been reported, but to reduce the energy consumption of the compressors fundamentally, regular management of the compressor should ensure optimum operation. This requires periodic on-site visits by experts, but is often overlooked as a cost issue, resulting in the use of the compressor in low-efficiency conditions. Thus, it is necessary to develop a low-cost evaluation technology for compressor condition monitoring and efficiency analysis to ensure that the compressor is always driven at the optimum efficiency without imposing undue burden on the compressor user. In this study, a sensor was installed at the inlet, outlet, and power supply of the compressor, and a method for evaluating the energy consumption of the compressor using the minimum sensor was derived. The experimental results are presented to show the validity of the proposed method. It was confirmed that the energy consumption of the compressor can be easily as well as efficiently evaluated by using the method developed in this study.

Energy Saving Design Method with the Consideration of the Initial Cost for Apartment Houses (저에너지 공동주택 구현을 위한 요소기술 선정 기법에 관한 연구)

  • Son, Won-Tug;Lee, Jong-Il;Yoon, Dae-Won;Lee, Keon-Ho;Song, Doosam
    • Journal of the Korean Solar Energy Society
    • /
    • v.34 no.2
    • /
    • pp.24-31
    • /
    • 2014
  • So many energy saving strategies to realize the low energy house are proposed in these days. Even if the energy saving performances are similar between the strategies, the costs are in abroad ranges. Therefore, the application of the energy saving strategies should be based upon two considerations; one is energy saving performance and the other is the cost. In this study, the decision making method for application of the passive design technologies in the design stage of the low energy apartment house are suggested. By utilizing the result of this study, practitioners can make an effective design alternatives which solve the conflicted values; energy saving and cost.

A research on the design parameters for a double-transmission main system for sustainable water supply (이중송수관로를 이용한 안정적인 송수를 위한 설계인자에 관한 연구)

  • Hyun, Inhwan;Hong, Juneui;Kim, Dooil
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.27 no.1
    • /
    • pp.129-138
    • /
    • 2013
  • Water interruption is often caused by a rupture in the branch-like singular pipeline. This will cause critical complaints from household and may decrease public service quality. As an alternative of singular pipeline, additional parallel pipeline could be installed for sustainable water supply. This system is called double pipeline system and able to be utilized for water transmission line between treatment plant and distribution reservoir. Construction of double pipeline was thought to increase capital cost, which can be an issue to waterworks authorities. Reducing capital cost was possible by means of installing connectors between two parallel pipelines because of reduced diameter of each pipe. To obtain optimal design condition for connectors, it was necessary to compare water pressure according to accident location, to investigate flow according to connection pipe spacing, connection pipe diameter, and aging of pipe. Reliable and economical connection layouts were determined based on these results. The cost estimation for each design condition was carried out. Cost was approximately reduced by 20 ~ 30 % compared to the double pipeline without connections. In addition to this, connection between double pipelines could expect extra benefits for maintenance since the pipe could be repaired and rehabilitated without interruption.

Schedule Optimization in Resource Leveling through Open BIM Based Computer Simulations

  • Kim, Hyun-Joo
    • Journal of KIBIM
    • /
    • v.9 no.2
    • /
    • pp.1-10
    • /
    • 2019
  • In this research, schedule optimization is defined as balancing the number of workers while keeping the demand and needs of the project resources, creating the perfect schedule for each activity. Therefore, when one optimizes a schedule, multiple potentials of schedule changes are assessed to get an instant view of changes that avoid any over and under staffing while maximizing productivity levels for the available labor cost. Optimizing the number of workers in the scheduling process is not a simple task since it usually involves many different factors to be considered such as the development of quantity take-offs, cost estimating, scheduling, direct/indirect costs, and borrowing costs in cash flow while each factor affecting the others simultaneously. That is why the optimization process usually requires complex computational simulations/modeling. This research attempts to find an optimal selection of daily maximum workers in a project while considering the impacts of other factors at the same time through OPEN BIM based multiple computer simulations in resource leveling. This paper integrates several different processes such as quantity take-offs, cost estimating, and scheduling processes through computer aided simulations and prediction in generating/comparing different outcomes of each process. To achieve interoperability among different simulation processes, this research utilized data exchanges supported by building SMART-IFC effort in automating the data extraction and retrieval. Numerous computer simulations were run, which included necessary aspects of construction scheduling, to produce sufficient alternatives for a given project.

A Study on Optimal Cable Prestressing and Fabrication Camber of Wando Bridge (완도대교의 최적 케이블장력 및 제작 Camber 산정에 관한 연구)

  • Lee Tae-Yeol;Kim Young-Hoon;Kim Jae-Kwon;Kang Sung-Won
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2006.04a
    • /
    • pp.283-290
    • /
    • 2006
  • Cable-stayed bridge is a bridge that consists of one or more pylons, with cables supporting the deck. Cable-stayed bridges have come into wide use recently because of their economy, stability, and excellent appearance. It is possible to achieve a uniform moment distribution in the stiffening girders mainly by prestressing the cables, which leads to a more economical design in material and weight than other types of bridges. However, to achieve a more uniform moment distribution is vague objective, so it cannot be easily defined as the optimization problem. In other words, the minimization of cost or weight as the objective is not directly related to the optimization of cable prestressing. Therefore, it has been considered as one of the most important, difficult and also interesting topics among many researchers and bridge engineers to determine the optimal tensioning strategy how to apply prestressing forces of the cables of cable-stayed bridge. A number of approaches (Wang et al. 1993, $Negr\~{a}o\;and\;Sim\~{o}es$ 1997, Agrawal 1997, Janjic et al. 2003) to determine the optimal cable tensions have been proposed in the literature. Among these approaches the unit load method (Janjic et al. 2003) is considered in this paper because it can take into account the actual construction process while other approaches are based on the configuration of the final structure only. In this paper, '2-step approach' based on the unit load method is proposed to find the optimal tensioning strategy especially for the atypical asymmetric bridge under construction, which has continuous deck supported by one pylon and stay cables. Some numerical results will be given to show the validity of the new approach suggested in this paper.

  • PDF

Optimal Design of Cement Mortar Pouring type Paved Track (시멘트모르터 충진형 포장제도의 최적 설계)

  • Lee, Il-Wha
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.2 s.33
    • /
    • pp.222-229
    • /
    • 2006
  • Recently, the development of the paved track is required as a low-maintenance of conventional line. The main reason is that the line capacity and bearing of track are increased progressively. The important factors of paved track are stability and applicability. To be based on this subject, Cement Mortar Pouring(CMP) paved track is developed. CMP paved track is a kind of ballast reinforced track using the prepacked concrete technique. The most important thing to design the paved track is to optimize the track structure considering various conditions. Because construction environment is very limited, cost is expensive and it has very complicated behavior. On this paper, structural characteristics of the paved track are investigated using the 3D finite element analysis to verify the optimized structure of the CMP track.

The Optimal Link Scheduling in Half-Duplex Wireless Mesh Networks Using the Constraint Programming (제약식 프로그래밍을 이용한 일방향 전송 무선 메쉬 네트워크에서의 최적 링크 스케쥴링)

  • Kim, Hak-Jin
    • Journal of Information Technology Applications and Management
    • /
    • v.23 no.2
    • /
    • pp.61-80
    • /
    • 2016
  • The wireless mesh network (WMN) is a next-generation technology for data networking that has the advantage in cost and the flexibility in its construction because of not requiring the infra-structure such as the ethernet. This paper focuses on the optimal link scheduling problem under the wireless mesh network to effectuate real-time streaming by using the constraint programming. In particular, Under the limitation of half-duplex transmission in wireless nodes, this paper proposes a solution method to minimize the makespan in scheduling packet transmission from wireless nodes to the gateway in a WMN with no packet transmission conflicts due to the half-duplex transmission. It discusses the conflicts in packet transmission and deduces the condition of feasible schedules, which defines the model for the constraint programming. Finally it comparatively shows and discusses the results using two constraint programming solvers, Gecode and the IBM ILOG CP solver.

Analysis of Environmental Factors in Pleurotus eryngii Cultivation House(III) -Based on Panel Type Structure- (새송이버섯 재배사의 환경인자 계측(III) -영구재배사를 중심으로-)

  • Suh, Won-Myung;Yoon, Yong-Cheol
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.187-192
    • /
    • 2005
  • Pleurotus eryngii(King oyster) is one of the most promising mushrooms being produced on the domestic farms. The quality as well as quantity of Eryngii is sensitively affected by micro climate factors. To safely produce high-quality Eryngii all the year round, it is required that the environmental factors be carefully controlled by well designed structures equipped with various facilities and control systems. This study was carried out at the commercial mushroom cultivation houses to find out reasonable range of each environmental factor and yield together with economic and safe structures influencing on the optimal productivity of Eryngii. This experiment was conducted from Nov. 10, 2004 to Aug. 27, 2005 in Eryngii. cultivation houses. The environmental factors measured for this study were inside/outside temperature, relative humidity and $CO_2$ concentration in Pleurotus eryngii medium. In addition, the yield and quality of mushroom were made investigation. But the optimal productivity will be evaluated by considering the quality and quantity of mushroom production, energy requirements, facility construction and management cost, etc.

  • PDF

Optimum Design of Prestressed Concrete Box Girder Bridges (P.C 박스거더 교량의 최적설계)

  • 방명석;김일곤
    • Computational Structural Engineering
    • /
    • v.4 no.4
    • /
    • pp.91-96
    • /
    • 1991
  • This study focus on the development of optimization techniques to prestressed concrete box girder bridges erected in cantilever construction method. Optimization techniques are used to find optimal cross sections, i.e., those having minimum cost for such bridges. The problem is treated as an unconstrained nonlinear programming problem and the program has been developed to compute the objective function and optimal value. Numerical results are verified by the data of existing bridges.