• Title/Summary/Keyword: Optimal construction cost

Search Result 368, Processing Time 0.031 seconds

CO2 Emission And Cost Analysis Of Blended Concrete (혼합 콘크리트의 CO2 배출 및 비용 분석)

  • Yang, Xu;Wang, Xiao-Yong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.204-205
    • /
    • 2018
  • This paper investigates CO2 emission and cost analysis of blended concrete which was added with fly ash and slag. Three kinds of blended concrete were studied in this investigation, the first blended concrete was added fly ash replacing part of the cement while the second was added slag, the third was added fly ash and slag. Analysis result display that the blended concrete containing fly ash and slag is the optimal choice while considering economic and CO2 emissions.

  • PDF

An Estimation of the Economic Life Expectancy of the Building Service Equipment with LCC Analysis (LCC 분석을 통한 공조설비 내구연한 산정)

  • Kang, Sung-Ju;Kim, Yong-Ki;Lee, Tae-Won
    • Proceedings of the SAREK Conference
    • /
    • 2007.11a
    • /
    • pp.316-321
    • /
    • 2007
  • It is difficult for a superintendent or an operator of building service systems and equipment to decide the reasonable time for management of himself due to the shortage of his specialty for repair or replacement of a part of or whole equipment. But The reliable life expectancies for various building service equipment have not been prepared yet. This study shows the difference of optimal economic life and the decrease of running cost and energy consumption according to management level of the building equipment by the LCC analysis. The numerical model for building HVAC system was composed and analyses were performed for several parameters with management.

  • PDF

A Study for Selecting the Optimal Model among Ten Models of Crushing Machine with Various Constraints Related to Road Repairing (도로공사에 관련된 많은 제약조건을 갖는 열개의 파쇄장비 모델들 중 최적 모델 선정에 관한 연구)

  • Im Yeong Mun;Hwang Yeong Seop
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.11a
    • /
    • pp.125-130
    • /
    • 2004
  • It is not difficult to see the road repairing. There are many and various machines that can crush road surface. The efficiency and power of the machine depend on crushing head-shape, crushing interval, crushing load, crushing stress, machine's dropping height and roller's kind. The objective of this study is to select the optimal model among ten models of crushing machine with constraints such as crushing depth, variation, and crushed particle size. The data for this study are chosen from the site of construction in Kangnung during three months ($2004.\;6.\;1\;\sim\;2004.\;8.\;31$). The provided methodology in this paper will be fruitful not only for the selection of crushing machine but also for the aspects of construction period, cost, work efficacy according to the condition from the various sites of construction.

  • PDF

Cost-Effectiveness Evaluation of Semi-Active Control System for Cable-Stayed Bridge (사장교에 장착된 준능동형 제어시스템의 비용효율성 평가)

  • Hahm, Dae-Gi;Park, Won-Suk;Koh, Hyum-Moo;Ok, Seung-Yong;Park, Kwan-Soon
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2005.03a
    • /
    • pp.388-395
    • /
    • 2005
  • This paper presents cost-effectiveness evaluation of semi-active control system for cable-stayed bridge under earthquake excitation. Bi-state control method with Linear Quadratic Gaussian(LQG) optimal controller is used for generic semi-active dampers. Cost-effectiveness of the structural control system is investigated by using the life-cycle cost(LCC) concept. The evaluation results show that the efficiency of semi-active control system is increased when the damage cost due to the failure of bridge system or the bridge importance is enlarged. It was also found that the damper cost had little influence on the cost-effectiveness of semi-active control system if it was relatively small to the initial construction cost.

  • PDF

FUZZY GOAL PROGRAMMING FOR CRASHING ACTIVITIES IN CONSTRUCTION INDUSTRY

  • Vellanki S.S. Kumar;Mir Iqbal Faheem;Eshwar. K;GCS Reddy
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.642-652
    • /
    • 2007
  • Many contracting firms and project managers in the construction industry have started to utilize multi objective optimization methods to handle multiple conflicting goals for completing the project within the stipulated time and budget with required quality and safety. These optimization methods have increased the pressure on decision makers to search for an optimal resources utilization plan that optimizes simultaneously the total project cost, completion time, and crashing cost by considering indirect cost, contractual penalty cost etc., practically charging them in terms of direct cost of the project which is fuzzy in nature. This paper presents a multiple fuzzy goal programming model (MFGP) that supports decision makers in performing the challenging task. The model incorporates the fuzziness which stems from the imprecise aspiration levels attained by the decision maker to these objectives that are quantified through fuzzy linear membership function. The membership values of these objectives are then maximized which forms the fuzzy decision. The problem is solved using LINGO 8 optimization solver and the best compromise solution is identified. Comparison between solutions of MFGP, fuzzy multi objective linear programming (FMOLP) and multiple goal programming (MGP) are also presented. Additionally, an interactive decision making process is developed to enable the decision maker to interact with the system in modifying the fuzzy data and model parameters until a satisfactory solution is obtained. A case study is considered to demonstrate the feasibility of the proposed model for optimization of project network parameters in the construction industry.

  • PDF

Reliability Index Optimization for Pier Type Quay Walls Using Life Cycle Cost (생애주기비용을 이용한 잔교식 안벽의 신뢰도지수 최적화)

  • Kim, Dong-Hyawn;Yoon, Gil-Lim
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.23 no.6
    • /
    • pp.422-428
    • /
    • 2011
  • Optimal reliability indices were found by optimizing life cycle cost(LCC) of pier type quay walls. Failure probability of pier and shore bridge were calculated by response surface method. Then, they were used to obtain recovery cost after damage. Costs for initial construction and maintenance were also considered in finding optimal reliability indices. Target reliability indices which may be used in reliability based design were suggested by numerical examples under seismic load and ship load.

Multi-objective Optimum Structural Design of Marine Structure Considering the Productivity

  • Lee, Joo-Sung;Han, Jeong-Hoon
    • Journal of Ocean Engineering and Technology
    • /
    • v.23 no.3
    • /
    • pp.1-5
    • /
    • 2009
  • It is necessary to develop an efficient optimization technique to optimize engineering structures that have given design spaces, discrete design values, and several design goals. In this study, an optimum algorithm based on the genetic algorithm was applied to the multi-object problem to obtain an optimum solution that simultaneously minimizes the structural weight and construction cost of panel blocks in ship structures. The cost model was used in this study, which includes the cost of adjusting the weld-induced deformation and applying the deformation control methods, in addition to the cost of the material and the welding cost usually included in the normal cost model. By using the proposed cost model, more realistic optimum design results can be expected.

Empirical Evaluation of BIM Coordinator Performance using Queuing Model in Construction Phase (대기행렬 모형을 활용한 시공단계 BIM 코디네이터 업무 성과 분석)

  • Ham, Nam-Hyuk;Yuh, Ok-Kyung;Ji, Kyu-Hyun
    • Journal of KIBIM
    • /
    • v.8 no.3
    • /
    • pp.31-42
    • /
    • 2018
  • This study focuses on the BIM request for information(RFI) processing performance and quantitatively analyzes the performance of the BIM coordinator and the loss due to the waiting of the project participants. For these purposes, a method to quantitatively evaluate the performance of the BIM coordinator was proposed using a queueing model. For the verification, two projects in which BIM was applied in the construction phase were selected, and the BIM RFI data were collected through the analysis of the BIM monthly report and BIM coordinator work log of each project. In addition, the BIM input personnel, labor cost, and productivity data were collected through interviews with the experts of the case projects. The analysis of the BIM RFI processing performance of the BIM coordinator using the queueing model exhibited on a probabilistic basis that the waiting status of the project participants could vary depending on the preliminary BIM application to the design verification as well as the input number and level of the BIM coordinator personnel. In addition, the loss cost due to the waiting of the project participants was analyzed using the number of BIM RFIs waiting to be processed in the queueing system. Finally, the economic feasibility analysis for the optimal BIM coordinator input was performed considering the loss cost. The results of this study can be used to make decisions about the optimal BIM coordinator input and can provide grounds for the BIM return on investment (ROI) analysis considering the waiting cost of the project participants.

Studies on the Design of Forest Road Network for Mechanized Yarding Operations (II) - Optimal road spacing and density - (기계화(機械化) 집재작업(集材作業)을 위한 노망정비(路網整備)에 관(關)한 연구(硏究)(II) - 적정임도간격(適正林道間隔) 및 임도밀도(林道密度) -)

  • Cha, Du Song;Cho, Koo Hyun
    • Journal of Korean Society of Forest Science
    • /
    • v.83 no.3
    • /
    • pp.299-310
    • /
    • 1994
  • This study was carried out to examine the optimal road spacing and road density to minimize the total harvesting cost(road construction cost plus yarding cost) for mechanized yarding system to roadside by one - and two-stage two-way in Forestry build-up region. Chunchon-kun, Kangwon-do. The estimated road construction costs were ranged from ten million won to sixty million won per km. The results have indicated that cable crane was appropriate for yarding machine by one-stage, two-way, and estimated optimal road spacing was 1,698m~4,192m, averaged 3,087m, and road density was 3.44m/ha~8.44m/ha, and averaged 5. 12m/ha. In hilly terrain, combination of medium yarder and Logging bogie was suited to yarding machine by two-stage, two-way, and calculated optimal road spacing was 1,483m~3,481m, averaged 2,589m, and road density was 4.05m/ha~9.46m/ha, averaged 5.90m/ha. In steep terrain, combination of medium yarder and jinsung winch was suited, and estimated optimal road spacing was 1,693m~3,982m, averaged 2,960m, and road density was 3.68m/ha~8.64m/ha, averaged 5.38m/ha.

  • PDF

A Study on Entering Water Temperature in Vertical Closed Ground Loop System Considering the Economical Feasibility in Load of the Office Building (사무시설에 수직형 지열원 냉 난방시스템의 경제성을 고려한 인입온도(EWT)에 관한 연구)

  • Lee, Byung-Doo;Lee, Dae-Woo;Lee, Se-Jin
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.579-585
    • /
    • 2009
  • Recently, Vertical-Closed Loop system using geothermal which is the most efficient among the building cooling and heating systems is coming into wide spread due to assistance of domestic policies. However, there is a limitation that a design of ground heat exchanger taking 60% of construction cost is done by GLD and GLHEPRO programs without specific guidelines and consideration on Entering Water Temperature(EWT). For getting an optimal EWT, we analyzed the costs for construction of ground heat exchanger and cooling and heating for 15 years. In the results, reduction of construction costs as the length of ground heat exchanger shortens was much greater than increase of the electrical power consumption as COP gets low. EWT that COP of heat pump can be 3.76 or above was below $31^{\circ}C$ in cooling and was over $5^{\circ}C$ in heating.

  • PDF