• 제목/요약/키워드: Optimal Test Plan

Search Result 86, Processing Time 0.026 seconds

안전도 제약을 고려한 복합전력계통의 확충계획에 관한 기초연구 (A Basic Method for Composite Power System Expansion Planning under Security Criteria)

  • 권중지;트란트룽틴;최재석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.557-559
    • /
    • 2005
  • This paper proposes a method for choosing the best composite power system expansion plan considering a contingency security criterion. The proposed method minimizes the investment budget fer constructing new transmission lines subject to contingency criterion. it models the power system expansion problem as an integer programming one. The method solves for the optimal strategy using a branch and bound method that utilizes a network flow approach and the maximum flow-minimum cut set theorem. Although the proposed method is applied to a simple sample study, the test results demonstrate that the proposed method is suitable for solving the power system expansion-planning problem subject to practical future uncertainties.

  • PDF

무인FA를 위한 자율주행 로봇의 경로계획 및 실시간 궤적제어에 관한 연구 (A Study on a Path Planning and Real-Time Trajectory Control of Autonomous Travelling Robot for Unmanned FA)

  • 김현근;심현석;황원준
    • 한국산업융합학회 논문집
    • /
    • 제19권2호
    • /
    • pp.75-80
    • /
    • 2016
  • This study proposes a efficient technology to control the optimal trajectory planning and real-time implementation method which can perform autonomous travelling for unmaned factory automation. Online path planning should plan and execute alternately in a short time, and hence it enables the robot avoid unknown dynamic obstacles which suddenly appear on robot's path. Based on Route planning and control algorithm, we suggested representation of edge cost, heuristic function, and priority queue management, to make a modified Route planning algorithm. Performance of the proposed algorithm is verified by simulation test.

델파이 활용 신재생 에너지 수요예측과 장기전원 구성의 경제성 평가 (Forecasting Renewable Energy Using Delphi Survey and the Economic Evaluation of Long-Term Generation Mix)

  • 구훈영;민대기
    • 대한산업공학회지
    • /
    • 제39권3호
    • /
    • pp.183-191
    • /
    • 2013
  • We address the power generation mix problem that considers not only nuclear and fossil fuels such as oil, coal and LNG but also renewable energy technologies. Unlike nuclear or other generation technologies, the expansion plan of renewable energy is highly uncertain because of its dependency on the government policy and uncertainty associated with technology improvements. To address this issue, we conduct a delphi survey and forecast the capacity of renewable energy. We further propose a stochastic mixed integer programming model that determines an optimal capacity expansion and the amount of power generation using each generation technology. Using the proposed model, we test eight generation mix scenarios and particularly evaluate how much the expansion of renewable energy contributes to the total costs for power generation in Korea. The evaluation results show that the use of renewable energy incurs additional costs.

U-City 추진방법론에 대한 고찰(Top Down vs Bottom Up 모델) (A Study on Methodology of U-City Promotion(Top-Down vs Bottom-Up Approach Model))

  • 이상훈;김형복
    • Spatial Information Research
    • /
    • 제17권1호
    • /
    • pp.131-144
    • /
    • 2009
  • 최근 국내의 많은 지방자치단체에서는 정보통신 기술과 도시개발 기술을 융합하여 유비쿼터스 도시(U-City)를 건설하려고 하며, 세계적으로도 많은 도시들이 도시의 경쟁력 강화와 도시민의 삶의 질 향상을 위해 U-City를 개발하기 위해 노력하고 있다. 이러한 시대적 흐름에 따라 각 지방자치단체와 사업 시행자는 최적의 U-City를 구축하기 위하여 많은 방법론을 개발하고 있으며, 기존의 도시개발 방식과 정보화 구축 방식을 연계시키는 등 다양한 개발 절차를 모색하고 있다. 가장 많이 사용되고 있는 방안으로는 도시개발 계획 당시에 개발 될 도시의 정보화 전략계획(ISP)을 수립하는 것이다. 다양한 도시의 환경과 구축기간, 예산, 정보화 기술 등 여러 변수들이 있어 동일한 방법으로 모든 경우에 대한 구축 방안을 수립하기는 어렵다. 따라서 도시 비전과 전략, 서비스와 요소기술의 선정 등에 대한 방안이 필요하게 되었다. 본 논문에서는 U-City를 위한 비전, 전략 수립모형을 만들고 이를 구축할 수 있는 방안으로 하향식 그리고 상향식 접근방법을 제시한다. 또한 U-City를 건설하기 위한 일반적인 추진방법론에 대해서 분석하고 이러한 방법론 안에서 도시 비전 수립을 위하여 두 개의 접근방법을 구성하는 방안에 대하여 논한다.

  • PDF

A Study on Transmission System Expansion Planning on the Side of Highest Satisfaction Level of Decision Maker

  • Tran TrungTinh;Kang Sung-Rok;Choi Jae-Seok;Billinton Roy;El-keib A. A.
    • KIEE International Transactions on Power Engineering
    • /
    • 제5A권1호
    • /
    • pp.46-55
    • /
    • 2005
  • This paper proposes a new method for choice of the best transmission system expansion plan on the side of highest satisfaction level of decision maker using fuzzy integer programming. The proposed method considers the permissibility and ambiguity of the investment budget (economics) for constructing the new transmission lines and the delivery marginal rate (reliability criteria) of the system by modeling the transmission expansion problem as a fuzzy integer programming one. It solves the optimal strategy (reasonable as well as flexible) using a fuzzy set theory-based on branch and bound method that utilizes a network flow approach and the maximum flow-minimum cut set theorem. Under no or only a very small database for the evaluation of reliability indices, the proposed technique provides the decision maker with a valuable and practical tool to solve the transmission expansion problem considering problem uncertainties. Test results on the 63-bus test system show that the proposed method is practical and efficiently applicable to transmission expansion planning.

A Comprehensive Cash Management Model for Construction Projects Using Ant Colony Optimization

  • Mohamed Abdel-Raheem;Maged E. Georgy;Moheeb Ibrahim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.243-251
    • /
    • 2013
  • Cash management is a major concern for all contractors in the construction industry. It is arguable that cash is the most critical resource of all. A contractor needs to secure sufficient funds to navigate the project to the end, while keeping an eye on maximizing profits along the way. Past research attempted to address such topic via developing models to tackle the time-cost tradeoff problem, cash flow forecasting, and cash flow management. Yet, little was done to integrate the three aspects of cash management together. This paper, as such, presents a comprehensive model that integrates the time-cost tradeoff problem, cash flow management, and cash flow forecasting. First, the model determines the project optimal completion time by considering the different alternative construction methods available for executing project activities. Second, it investigates different funding alternatives and proposes a project-level cash management plan. Two funding alternatives are considered; they are borrowing and company own financing. The model was built as a combinatorial optimization model that utilizes ant colony search capabilities. The model also utilizes Microsoft Project software and spreadsheets to maintain an environment that incorporates activities, their durations, and other project data, in order to estimate project completion time and cost. Ant Colony Optimization algorithm was coded as a Macro program using VBA. Finally, an example project was used to test the developed model, where it acted reliably in maximizing the contractor's profit in the test project.

  • PDF

갱내 대리석 채석을 위한 체인쏘머신 적용 사례연구 (Case Study on the Application of Chain Saw Machine for the Underground Marble Quarrying)

  • 주재열;이광표;김재동
    • 터널과지하공간
    • /
    • 제23권3호
    • /
    • pp.180-191
    • /
    • 2013
  • 본 연구는 백운광산지역에 부존하는 대리석을 효율적으로 채석하고자 새로이 도입한 체인쏘머신(chain saw machine)의 적용성과 작업 효율을 분석함으로써 최적의 채석 방안을 도출하고자 하였다. 절단 효율에 큰 영향을 미치는 채석대상암석의 물리적 특성을 파악한 결과, 국내 타 지역에서 산출되는 대리석의 물성과 유사한 수준을 보이고 있으며 등방적 성질을 지니고 있어 산업용 석재로서 유리한 것으로 나타났다. 부존 대리석이 석재로서 가지는 중장기 품질을 확인하기 위해 내부식성, 마모율 등의 시험을 수행한 결과, pH 5.6의 인공강우를 50회 적용한 이후부터 시험편의 무게와 탄성파속도가 감소하였으며 마모율은 22.67%로 나타났다. 채석장 현장에서 시험운행 중인 체인쏘머신의 작업별 소요시간과 절단속도를 분석하여 단위작업을 9가지로 분류하였고 각 단위작업별 소요시간을 도출하였다. 이를 토대로 현장에 실제 적용 가능한 2가지 작업패턴에 대한 작업소요시간을 비교한 결과 장비 본체이동을 최소화하여 절단순서를 결정한 패턴 B가 원석의 외곽면을 우선 절단하도록 절단순서를 결정한 패턴 A보다 약 6%의 작업시간 단축을 나타내었다. 절단패턴 분석과 함께 백운광산의 광체를 3차원으로 모델링하고 대상암석의 부존조건을 고려한 채석 계획안을 제시하였다.

Pender의 모형을 적용한 유방암 환자의 건강증진행위 예측요인 (Predictive Factors to Health Promotion Behaviors in Breast Cancer Patients Using Pender's Health Promotion Model)

  • 소인숙;정혜선
    • 한국산학기술학회논문지
    • /
    • 제18권3호
    • /
    • pp.258-269
    • /
    • 2017
  • 본 연구는 Pender(1996)의 건강증진모형을 중심으로 유방암 환자의 건강증진행위 예측요인을 파악하기 위해 시도한 서술적 조사연구이다. 2015년 9월 18일부터 10월 26일까지 구조화된 설문지를 이용하여 유방암 환자 121명을 대상으로 자료를 수집하였다. 수집된 자료는 SPSS 20.0 for Windows 프로그램을 이용하여 t-test, ANOVA와 Scheffe 사후검정, Pearson correlation coefficients 및 위계적 다중회귀분석 방법으로 분석하였다. 대상자의 건강증진행위 예측요인은 사회적지지, 행동계획 몰입, 이전건강 행위, 행위관련 감정, 지각된 자기효능감, 가족기능, 지각된 유익성, 상황적 영향 등 8가지 변수로 파악되었고, 총 설명력은 58%이었다. 이상으로 유방암 환자들이 재활기에 최적의 건강을 유지하고 질 높은 삶을 살 수 있도록 돕기 위해서는 대상자의 건강증진행위 수준을 상승시키도록 돕는 간호중재의 개발과 적용이 필요하다. 특히 본 연구결과 유방암 환자의 건강증진행위 예측요인으로 밝혀진 사회적 지지, 행동계획 몰입, 이전건강 행위, 행위관련 감정, 지각된 자기효능감, 가족기능, 지각된 유익성 및 상황적 영향 수준이 낮은 대상자들에게 특별히 관심을 가질 필요가 있겠다.

다중회귀분석법을 이용한 지역전력수요예측 알고리즘 (The Spatial Electric Load Forecasting Algorithm using the Multiple Regression Analysis Method)

  • 남봉우;송경빈;김규호;차준민
    • 조명전기설비학회논문지
    • /
    • 제22권2호
    • /
    • pp.63-70
    • /
    • 2008
  • 본 논문은 현 배전계통계획시스템(DISPLAN)의 지역전력수요예측 알고리즘을 개선하여 다중회귀분석을 이용한 지역전력수요예측 알고리즘을 제시하였다. 지역전력수요예측 알고리즘은 예측의 정확도를 높이기 위해 지역경제와 지역인구와 과거의 판매전력량을 입력변수로 사용하였다. 사례연구로 경북의 경산시, 구미시, 김천시, 영주시를 선정하여 제안한 방법의 정확도를 분석하였다. 사례연구 결과 제안한 방법의 전반적인 정확도는 11.2[%]로 DISPLAN의 12[%]보다 향상되었다. 특히 입력변수의 변동성이 심한 지역의 경우에서 많이 개선되었다. 제안된 방법은 배전계통시스템의 최적투자를 위한 지역전력수요예측에 사용될 것으로 사료된다.

국내 부지 특성을 고려한 오염토양 정화기술매칭기준안 (Draft Guideline Matching the Treatment Technology to the Soil Contaminated Site Based on the Site Properties in Korea)

  • 이재영;이민희;유목련
    • 한국지하수토양환경학회지:지하수토양환경
    • /
    • 제21권6호
    • /
    • pp.1-13
    • /
    • 2016
  • The programmable logic array to match the treatment technology to the soil contaminated site based on the site properties in Korea was developed. Based on the previous technology screening system of FRTR (Federal Remediation Technology Roundtable) in USA, total 9 evaluation factors indicating the site characteristics were used for the technology matching process and 8 factors among them were quantitatively weighed in the order of importance. The class interval for each evaluation factor was linearly distributed to give the weighed score and 8 scores were summed up to prioritize the treatment technology. The optimal treatment technology for a specific site was determined according to the total score acquired from 8 evaluation factors used in this technology matching process. The reliability test for the developed technology matching system was done by using information of two real cleanup sites in Korea, suggesting that this guideline will be available to determine the most effective treatment technology to cleanup the soil contaminated site and also to assist the government or the company to design a successful and cost-effective site cleanup plan in Korea.