• 제목/요약/키워드: Optimal Cost

검색결과 3,872건 처리시간 0.03초

Optimal Burn-in Time under Cumulative Pro-Rata Replacement Warranty

  • Yun, Won-Young;Lee, Yang-Woo;Chung, Il-Han;Luis Ferreira
    • International Journal of Reliability and Applications
    • /
    • 제2권4호
    • /
    • pp.241-251
    • /
    • 2001
  • In this paper, optimal bum-in time to minimize the total mean cost, which is the sum of manufacturing cost with burn-in and cumulative warranty-related cost, is obtained. When the products with cumulative pro-rata warranty have high failure rate in the early period (infant mortality period), a burn-in procedure is adopted to eliminate early product failures. After burn-in, the posterior product life distribution and the warranty-related cost are dependent on burn-in time; long burn-in period may reduce the warranty-related cost, but it increases the manufacturing cost. The paper provides a methodology to obtain total mean cost under burn-in and cumulative pro-rata warranty. Property of the optimal burn-in time is analyzed, and numerical examples and sensitivity analysis are studied.

  • PDF

Optimum maintenance scenario generation for existing steel-girder bridges based on lifetime performance and cost

  • Park, Kyung Hoon;Lee, Sang Yoon;Yoon, Jung Hyun;Cho, Hyo Nam;Kong, Jung Sik
    • Smart Structures and Systems
    • /
    • 제4권5호
    • /
    • pp.641-653
    • /
    • 2008
  • This paper proposes a practical and realistic method to establish an optimal lifetime maintenance strategy for deteriorating bridges by considering the life-cycle performance as well as the life-cycle cost. The proposed method offers a set of optimal tradeoff maintenance scenarios among other conflicting objectives, such as minimizing cost and maximizing performance. A genetic algorithm is used to generate a set of maintenance scenarios that is a multi-objective combinatorial optimization problem related to the lifetime performance and the life-cycle cost as separate objective functions. A computer program, which generates optimal maintenance scenarios, was developed based on the proposed method using the life-cycle costs and the performance of bridges. The subordinate relation between bridge members has been considered to decide optimal maintenance sequence and a corresponding algorithm has been implemented into the program. The developed program has been used to present a procedure for finding an optimal maintenance scenario for steel-girder bridges on the Korean National Road. Through this bridge maintenance scenario analysis, it is expected that the developed method and program can be effectively used to allow bridge managers an optimal maintenance strategy satisfying various constraints and requirements.

국가적 관점에서 각 용도별 ESS 적정용량 산정을 위한 투자수리모델 수립에 관한 연구 (Study on Establishing Investment Mathematical Models for Each Application ESS Optimal Capacity in Nationwide Perspective)

  • 김정훈;윤석민
    • 전기학회논문지
    • /
    • 제65권6호
    • /
    • pp.979-986
    • /
    • 2016
  • At present, electric power industry around the world are being gradually changed to a new paradigm, such as electrical energy storage system, the wireless power transmission. Demand for ESS, the core technology of the new paradigm, has been growing worldwide. However, it is essential to estimate the optimal capacity of ESS facilities for frequency regulation because the benefit would be saturated in accordance with the investment moment and the increase of total invested capacity of ESS facilities. Hence, in this paper, the annual optimal mathematical investment model is proposed to estimate the optimal capacity and to establish investment plan of ESS facility for frequency regulation. The optimal mathematical investment model is newly established for each season, because the construction period is short and the operation effect for the load by seasons is different unlike previous the mathematical investment model. Additionally, the marginal operating cost is found by new mathematical operation model considering no-load cost and start-up cost as step functions improving the previous mathematical operation model. ESS optimal capacity is established by use value in use iterative methods. In this case, ESS facilities cost is used in terms of the value of the beginning of the year.

면적강우량 산정을 위한 관측망 최적설계 연구 (Optimal Network Design for the Estimation of Areal Rainfall)

  • 이재형;유양규
    • 한국수자원학회논문집
    • /
    • 제35권2호
    • /
    • pp.187-194
    • /
    • 2002
  • 하천유역 면적강우량 산정의 정확도를 개선하기 위하여 기존 강우관측자료의 통계적 특성을 이용한 강우관측망의 최적설계방법을 연구하였다. 최적설계를 위한 목적함수는 면적강우량의 추정오차 및 지점강우량 관측비용의 항으로 구성하고, 그 값이 최소인 관측망은 선정하였다. 통계f7파의 추정방법으로는 통계적 분산 산정방법인 크리깅 모형을 채택하였다. 비용은 강우관측소의 설치비와 연간운영 비론 적용하고, 오차항과 비용항의 통합에는 등치매개변수를 이용하였다. 연구된 최적설계방법을 댐 신설로 강우관측소 증설이 필요한 용담댐 유역에 적용하여, 대상유역의 최적 강우관측망을 제안하였다.

원료및 제품저장조를 포함하는 병렬 비연속 공정의 최적설계 (Optimal design of parallel noncontinuous units with feedstock/product storages)

  • 이경범
    • 제어로봇시스템학회논문지
    • /
    • 제3권5호
    • /
    • pp.532-541
    • /
    • 1997
  • This article derives an analytic solution to determine the optimal size of multiple noncontinuous process and storage units. The total cost to be minimized consists of the setup cost of noncontinuous processing units and the inventory holding cost of feedstock/product storages. A novel approach, which is called PSW(Periodic Square Wave) model, is applied to represent the material flow among non-continuous units and storages. PSW model presumes that the material flow between unit and storage is periodic square wave shaped. The resulting optimal unit size has similar characteristics with the classical economic lot sizing model such as EOQ(Economic Order Quantity) or EPQ(Economic Production Quantity) model in a sense that the unit size is determined as the balance between setup and inventory holding cost. However, the influence of inventory holding cost of PSW model is different from that of EOQ/EPQ model. EOQ/EPQ model includes only the product inventory holding cost but PSW model includes all inventory holding costs around the non-continuous unit with proportional contribution. PSW model is suitable for analyzing interlinked process-storage system. The optimal lot size of PSW model is smaller than that of EOQ/EPQ model. This is quitea remarkable result considering that the EOQ/EPQ model has been is widely used since last half century.

  • PDF

역주문을 고려한 공정-저장조 망구조의 최적설계 (Optimal Design of Process-Inventory Network Considering Backordering Costs)

  • 이경범
    • 제어로봇시스템학회논문지
    • /
    • 제20권7호
    • /
    • pp.750-755
    • /
    • 2014
  • Product shortage which causes backordering and/or lost sales cost is very popular in chemical industries, especially in commodity polymer business. This study deals with backordering cost in the supply chain optimization model under the framework of process-inventory network. Classical economic order quantity model with backordering cost suggested optimal time delay and lot size of the final product delivery. Backordering can be compensated by advancing production/transportation of it or purchasing substitute product from third party as well as product delivery delay in supply chain network. Optimal solutions considering all means to recover shortage are more complicated than the classical one. We found three different solutions depending on parametric range and variable bounds. Optimal capacity of production/transportation processes associated with the product in backordering can be different from that when the product is not in backordering. The product shipping cycle time computed in this study was smaller than that optimized by the classical EOQ model.

Optimal unidirectional grid tied hybrid power system for peak demand management

  • Vineetha, C.P.;Babu, C.A.
    • Advances in Energy Research
    • /
    • 제4권1호
    • /
    • pp.47-68
    • /
    • 2016
  • A well designed hybrid power system (HPS) can deliver electrical energy in a cost effective way. In this paper, model for HPS consisting of photo voltaic (PV) module and wind mill as renewable energy sources (RES) and solar lead acid battery as storage device connected to unidirectional grid is developed for peak demand reduction. Life time energy cost of the system is evaluated. One year hourly site condition and load pattern are taken into account for analysing the HPS. The optimal HPS is determined for least life time energy cost subject to the constraints like state of charge of the battery bank, dump load, renewable energy (RE) generation etc. Optimal solutions are also found out individually for PV module and wind mill. These three systems are compared to find out the most feasible combination. The results show that the HPS can deliver energy in an acceptable cost with reduced peak consumption from the grid. The proposed optimization algorithm is suitable for determining optimal HPS for desired location and load with least energy cost.

자주포 경제수명 결정에 관한 연구 (A Study on the Determination for the Economic Life-Time of a Self-Propelled Artillery)

  • 최은성;최석철
    • 한국군사과학기술학회지
    • /
    • 제3권1호
    • /
    • pp.26-37
    • /
    • 2000
  • This research paper deals with the problem of determining the optimal life time in terms of economical sense for a self-propelled artillery. Equivalent Annual Cost Method(EACM) is used to evaluate the optimal life time, based on the acquisition cost, and the operation and maintenance cost. It is assumed that the operation and maintenance cost includes the costs for spare parts, petroleum and ammunition for training. From the result of this study, the optimal life time for a self-propelled artillery is between 13.9 years and 16.1 years with 95% confidence interval.

  • PDF

에너지 비용을 고려한 중앙냉방시스템 최적운영 방안에 관한 연구(의료시설을 중심으로) (The Study on the Optimal Operation Strategies for Central Cooling System Considering Energy Cost (Focus on a medical facility))

  • 이가람;송재엽
    • 한국지열·수열에너지학회논문집
    • /
    • 제16권4호
    • /
    • pp.1-8
    • /
    • 2020
  • For a central cooling system of a medical facility composed of absorption chiller and screw chiller, the study was conducted on how to minimize the energy cost. In consideration of the energy cost, the optimal operation method in which the operation method of the heat source is changed according to the size of the cooling load was derived through simulation analysis. When applying the optimal operation method, the indoor environment, energy consumption, and energy cost were analyzed and compared with the reference operation method.

불확실성을 고려한 교량 하부구조 최적설계 (Optimal Design of Bridge Substructure Considering Uncertainty)

  • 박장호;신영석;신욱범;이재우
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2008년도 정기 학술대회
    • /
    • pp.387-390
    • /
    • 2008
  • The importance of the life cycle cost analysis for construction projects of bridge has been recognized over the last decades. Accordingly, theoretical models, guidelines, and supporting softwares have been developed for the life cycle cost analysis of bridges. However, it is difficult to predict life cycle cost considering uncertainties precisely. This paper presents methodology for optimal design of substructure for a steel box bridge. Total life cycle cost for the service life is calculated as sum of initial cost, damage cost considering uncertainty, maintenance cost, repair and rehabilitation cost. The optimization method is applied to design of a bridge substructure with minimal cost, in which the objective function is set to life cycle cost and constraints are formulated on the basis of Korean Bridge Design Specification. Initial cost is calculated based on standard costs of the Korea Construction Price Index and damage cost on the damage probabilities to consider the uncertainty of load and resistance. An advanced first-order second moment method is used as a practical tool for reliability analysis using damage probability. Maintenance cost and cycle is determined by a stochastic method and user cost includes traffic operation costs and time delay costs.

  • PDF