• Title/Summary/Keyword: Operational program

Search Result 581, Processing Time 0.024 seconds

Competing for the Responsibility of the Operational Meteorological Satellite Program: After the Launch of TIROS in 1960 (현업용 기상위성에 대한 주도권 다툼: 1960년 TIROS 발사 이후)

  • Ahn, Myoung-Hwan
    • Atmosphere
    • /
    • v.24 no.2
    • /
    • pp.265-281
    • /
    • 2014
  • Currently, Korea is developing a Cheollian follow-on satellite program, named as Geostationary Korea Multipurpose Satellite 2 (GK-2), which consists of two satellites. One satellite (GK-2A) is dedicated to the meterological mission, while the second one (GK-2B) hosts two main payloads for the ocean and environmental application. As GK-2A is dedicated to the meteorological mission unlike Cheollian, there have been discussions on the possibility of transferring the responsibilities of the GK-2A program to the Korea Meteorological Administration. To help resolve any consumptive disputes or to find an efficient way for the GK-2A program, the events happened after the successful launch of the first meteorological satellite TIROS-1 in the U.S. in April 1960 are investigated. With the successful demonstration of usefulness of TIROS-1 for the meteorological applications, organizations such as the Weather Bureau and the Department of Defense, responsible for the real time application of the TIROS 1 data, strongly requested for an operational meteorological satellite program which resulted in the plan for the National Operational Meteorological Satellite System (NOMSS). The plan was strongly supported by Kennedy Adminstration and was put forwarded for the new program under the responsibility of Weather Bureau to the Congress. However, the responsible Committee on Science and Aeronautics sided with NASA and requested major revision of the responsibility. Due to many unfavorable conditions, Weather Bureau accepted the requests and signed with NASA on the agreement for the operational meteorological satellite. However, with the delay of Nimbus satellite which is planned to be used for the prototype of the operational satellite and changes of the unfavorable situations, the Weather Bureau could draw a second agreement with NASA. The new agreement reflected most propositions requested by the Weather Bureau for the NOMSS plan. Until now the second agreement is regarded as the basic principles for the operational meteorological satellite program in the U.S. This study investigates the backgrounds and processes of the second agreement and its implications for the GK-2 program.

A Comparative Study on the Beneficial Equity and Operational Efficiency of the Medical Insurance Programmes (의료보험의 급여형평성 및 운영효율성 개선을 위한 제도간 비교연구)

  • 유영석;황인경
    • Health Policy and Management
    • /
    • v.4 no.1
    • /
    • pp.77-106
    • /
    • 1994
  • This study attempts to evaluate the beneficial equity and operational efficiency of the three Korean medical insurance programmes and thereby suggest directions for their policy improvement. Concepts of the equity and effciency were reviewed to develop indicators for comparative analysis. For the analysis, statistical and financial accounting data for 1991, issued by the National Federation of Medical Insurance and the Korea Medical Insurance Corporation, on the operational status and performances of the programmes, were collected and rearranged to be suited to the purpose of the study. The analysis reveals that beneficial inequity exists between self-employed and employee programs. and that operational inefficiency is prominent in both programms for self-employeds and for Government employees and private school teachers. In order to improve the beneficial inequity of the self-employed program, it is suggested that policies be formulated and implimented toward increasing the program revenue through increasing subsidies from the Government, and through inter- program finance adiustment. For the operational inefficiency of the two programs, it is judged that, toghether with the administrative support and control from the Government and the insurance society bodies, self- efforts be initiated to improve the internal mangement styles and systems of the insurance societies. Finally, from the viewpoint of the structural efficiency, expansion of the preventive insurance benefits by the insurance soceties is recommended both for beneficial equity and operational efficiency.

  • PDF

Analysis and Operational Model Design of the "Village Citizen Archivist" Training Program ('마을기록활동가' 양성 교육 프로그램의 분석 및 운영 모형 설계)

  • Gyubin Yoon
    • Journal of Korean Society of Archives and Records Management
    • /
    • v.24 no.1
    • /
    • pp.111-136
    • /
    • 2024
  • This study aims to identify the current status of the village citizen archivist training program (hereinafter "training program") and propose a competency-based training program operational model to improve it. With the steadily increasing number of training programs, revitalizing programs and systemizing operations become imperative. This study focuses on achieving the program's goals, the competence of village citizen archivists, and the continuity of training programs and archiving activities. To this end, the meaning and role of village citizen archivists were investigated through domestic and international literature. Moreover, the current status of training programs from 2015 to 2023 was identified, and the implications of literature reviews and case studies were verified through interviews with the program educators. The implications of the interview were summarized as the program operational plan for each goal, the competence of village citizen archivists, and the development plan, thereby being reflected in the operational model. The competency-based education program operational model was proposed to incorporate a model structure, design principles, curricular modules for each goal, and considerations for each stage of education program operation.

The Development of Resident-driven Operational Manual through the Evaluation of Community Programs in Apartment Complexes (아파트 커뮤니티 프로그램 운영 평가를 통한 주민주도형 운영 매뉴얼 개발)

  • Kang, Soon-Joo;Kim, Jin-Young;Lee, Bo-Bae
    • Journal of the Korean housing association
    • /
    • v.25 no.3
    • /
    • pp.131-143
    • /
    • 2014
  • The purpose of this study is to develop an operation manual of resident-driven community program by evaluating community program operation to realize a sustainable apartment complex and vitalize a community. To achieve this purpose, 8 community experts, who are in charge of 42 complexes of 7 autonomous districts among 25 districts in Seoul were interviewed from September 2013 to December 2013. Main results of the study are as follows. 1) Operational problems and improvements are deduced from evaluating operation process of community programs. It is found that smooth cooperation of main operators including a community vitalization association, a resident representative meeting and a control office is the most important. 2) Operation guideline for representative programs are suggested based on analysis of operational characteristics of 3 types of community programs; communication, recycling and environment management, according to program operation elements; material element, programming element, human element and finance element. 3) An operation manual of resident-oriented community program is presented after considering evaluation of operation processes and analysis of 3 types of operational elements of community programs.

Optimal Ballasting in the Preliminary Ship Design Stage (초기설계 단계에서의 최적 발라스트 용량에 관한 연구)

  • Gang, Won-Su
    • 한국기계연구소 소보
    • /
    • s.15
    • /
    • pp.117-125
    • /
    • 1985
  • It is usual practice to ballast a sip to maintain requires operational safety at sea. However, excessive ballasting may reduce the operational economy of a ship. Therefore, The determination of the optimal location and quantity of ballast water is one of the important works at the preliminary design stage. To provide a convenient tool to ship designers the program for the determination of the optimal location and program the effect of the change of ballast water quantity in each tank on some characteristics of a ship, such as trim, initial stability and heel, is investigated and the minimum quantity of ballast water for each tank which satisfies the operational safety requirements is calculated.

  • PDF

Korea Pathfinder Lunar Orbiter Flight Dynamics Simulation and Rehearsal Results for Its Operational Readiness Checkout

  • Song, Young-Joo;Bae, Jonghee;Hong, SeungBum;Bang, Jun
    • Journal of Astronomy and Space Sciences
    • /
    • v.39 no.4
    • /
    • pp.181-194
    • /
    • 2022
  • Korea Pathfinder Lunar Orbiter (KPLO), also known as Danuri, was successfully launched on 4 Aug. from Cape Canaveral Space Force Station using a Space-X Falcon-9 rocket. Flight dynamics (FD) operational readiness was one of the critical parts to be checked before the flight. To demonstrate FD software's readiness and enhance the operator's contingency response capabilities, KPLO FD specialists planned, organized, and conducted four simulations and two rehearsals before the KPLO launch. For the efficiency and integrity of FD simulation and rehearsal, different sets of blind test data were prepared, including the simulated tracking measurements that incorporated dynamical model errors, maneuver execution errors, and other errors associated with a tracking system. This paper presents the simulation and rehearsal results with lessons learned for the KPLO FD operational readiness checkout. As a result, every functionality of FD operation systems is firmly secured based on the operation procedure with an enhancement of contingency operational response capability. After conducting several simulations and rehearsals, KPLO FD specialists were much more confident in the flight teams' ability to overcome the challenges in a realistic flight and FD software's reliability in flying the KPLO. Moreover, the results of this work will provide numerous insights to the FD experts willing to prepare deep space flight operations.

Requirement management program for the Development of the Avionics Operational Flight Program (항공전자장비 비행운용프로그램 개발을 위한 요구도 관리 시스템)

  • Park, Kyoung-Choon;Seo, Jung-Bae;Bae, Jong-Min;Kang, Hyun-Syug
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.15 no.9
    • /
    • pp.2050-2058
    • /
    • 2011
  • The objective of this thesis is to research the software requirement management system for the development of operational flight program (OFP) which is embedded in aircraft avionics. It offers the function to record the requirement revision log. In fact, the COTS (commercial off-the-shelf) program which has similar function already exists in the market. But this kind of software programs are too complicated and relatively expensive in acquisition. Furthermore, they require too expensive maintenance cost, medium sized business company, this thesis intended to provide the software requirement management system that can be simply installed and easily used.

Development of a Leading Performance Indicator from Operational Experience and Resilience in a Nuclear Power Plant

  • Nelson, Pamela F.;Martin-Del-Campo, Cecilia;Hallbert, Bruce;Mosleh, Ali
    • Nuclear Engineering and Technology
    • /
    • v.48 no.1
    • /
    • pp.114-128
    • /
    • 2016
  • The development of operational performance indicators is of utmost importance for nuclear power plants, since they measure, track, and trend plant operation. Leading indicators are ideal for reducing the likelihood of consequential events. This paper describes the operational data analysis of the information contained in the Corrective Action Program. The methodology considers human error and organizational factors because of their large contribution to consequential events. The results include a tool developed from the data to be used for the identification, prediction, and reduction of the likelihood of significant consequential events. This tool is based on the resilience curve that was built from the plant's operational data. The stress is described by the number of unresolved condition reports. The strain is represented by the number of preventive maintenance tasks and other periodic work activities (i.e., baseline activities), as well as, closing open corrective actions assigned to different departments to resolve the condition reports (i.e., corrective action workload). Beyond the identified resilience threshold, the stress exceeds the station's ability to operate successfully and there is an increased likelihood that a consequential event will occur. A performance indicator is proposed to reduce the likelihood of consequential events at nuclear power plants.

Development of Tunnel Asset Management (TAM) Program

  • Hamed Zamenian;Dae-Hyun (Dan) Koo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.576-582
    • /
    • 2013
  • Typical highway infrastructure systems include roadway pavement, drainage systems, tunneling, and other hardware components such as guardrails, traffic signs, and lighting. Tunnels in a highway system have provided significant advantages to overcoming various natural challenges including crossing underneath bodies of water or through mountainous areas. While only a few tunnel failure cases have been reported, the failure rate is likely to increase as these assets age and because agencies have not emphasized tunneling asset management. A tunnel system undergoes a deterioration life cycle pattern that is similar to other infrastructure systems. There are very few agencies in the United States implementing comprehensive tunnel asset management programs. While current tunnel asset management programs focus on inspection, maintenance, and operation safety, there is an increasing need for the development of a comprehensive life cycle tunnel asset management program. This paper describes a conceptual framework for a comprehensive tunnel asset management program. The framework consists of three basic phases including a strategic plan, a tactical plan, and an operational plan to provide better information to the decision makers. The strategic plan is a basic long term approach of tunnel asset management. The tactical plan determines specific objectives and the operational plan actually applies asset management objectives in practice. The information includes operational condition, structural condition, efficiency of the system, emergency response, and life cycle cost analysis for tunnel capital improvement project planning.

  • PDF

Analysis of Operational Status and Effectiveness of Single-Track Accredited Program in ABEEK (공학교육인증의 단일인증프로그램 운영실태 및 효과분석)

  • Han, Jiyoung
    • Journal of Engineering Education Research
    • /
    • v.23 no.4
    • /
    • pp.66-75
    • /
    • 2020
  • This study was conducted using the literature review and survey research to analyze the operational status and effectiveness of the single-track accredited program, which has been mandatory since 2016. The research targets to achieve the purpose of the study were the nationwide engineering education accreditation system operating colleges, departments, and engineering education innovation centers. Finally, 183 copies were collected from faculty members at 69 colleges and 554 copies at the department level. As a result of the survey, the college recognized more positively about the operation of the single-track accredited program, and more than 50% of respondents said that there were difficulties due to the operation of the system. The contents required were analyzed and presented. Based on this, the engineering education accreditation system, including the single-track accredited program, suggested the direction of support at the government level and the ABEEK level to better settle down in the field of engineering colleges.