• Title/Summary/Keyword: Operation variables

Search Result 1,215, Processing Time 0.06 seconds

A Study on Optimal Equipment Fleet focused on Pusher-loaded Scrapers in Earthmoving Operation (토사운반 공정의 스크레이퍼 중심 최적 장비조합에 관한 연구)

  • Lee, Hyung-Guk;Son, Chang-Baek;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.39-42
    • /
    • 2012
  • Pusher-Loaded Scrapers are important construction equipment for large earthmoving operations. Production rates of a Pusher-Loaded Scraper vary greatly in accordance with the temperature or elevation, the equipment performance, haul speed, haul-road conditions, the method of loading, and Number of scrapers per one pusher. Determining of most economical scrapers fleet regarding the size of equipment, model name, and number of scrapers demands time-consuming calculation because it needs to reference of varied performance charts or tables and repeat complicated calculation. In this study, decision-making support system for the Optimal Pusher-loaded Scrapers Fleet is suggested for the purpose of calculating easily and handling effectively variables which are changed depend of the work conditions. The prototype of this program is developed using MATLAB. And the Database of Pusher-loaded Scraper embodies Performance chart & Retarder chart, soil properties, and calculation-support table.

  • PDF

Study on High Speed Operation of IPMSM with Concentrated Winding (집중권 IPMSM의 고속 운전을 위한 연구)

  • Lee, Ki-Doek;Kim, Won-Ho;Jang, Ik-Sang;Kim, Mi-Jung;Lee, Jae-Jun;Lee, Ju
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.854-855
    • /
    • 2011
  • In this paper, Interior permanent magnet synchronous motor(IPMSM) with concentrated winding for 110cc electric motorcycle is introduced. Optimum design is performed so as to satisfy wide speed operation range. And output characteristics is analyzed according to shoe height in many variables. Because partial magnetic saturation in shoe affects the harmonics, output characteristics of motor could be confirmed that a significant change. As a result, the new shape and the optimal design parameters considering the partial magnetic saturation is obtained. Compared with the base model, wide operating range was confirmed.

  • PDF

Efficient Operation Policy in a Closed-loop Tire Manufacturing System with EPR

  • Ko, Young-Dae;Hwang, Hark
    • Industrial Engineering and Management Systems
    • /
    • v.8 no.3
    • /
    • pp.162-170
    • /
    • 2009
  • This paper deals with a closed-loop remanufacturing system with one manufacturer and one remanufacturer. The manufacturer sells new products bearing the 'Extended Producer Responsibility (EPR).' It is assumed that the manufacturer's collection rate of used products depends only on the buy-back cost, while that of the remanufacturer depends on the minimum allowed quality level of used products in addition to the buy-back cost. Through the development of mathematical models with the objective function of maximizing profit, we study an efficient operation policy of each party. The decision variables are the unit selling price of new products and remanufactured products, the unit buy-back cost of the used products of the manufacturer and remanufacturer, and the minimum allowed quality level. The validity of the model is examined through numerical examples and sensitivity analysis.

Tide and Tidal Current Characteristics and Tidal Current Power Generation in the Uldolmok Waterway (울돌목 조석-조류 특성 및 조류발전)

  • Kang, Sok-Kuh;Yum, Ki-Dai;Lee, Kwang-Soo;Park, Jin-Soon
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2006.11a
    • /
    • pp.141-144
    • /
    • 2006
  • The tidal pi lot plant is being built in the Uldolmok waterway using Its strong tidal current with maximum current of about 12knots, which is revealed from the first direct observation using ADCP, on February, 2002. a serious of field observations (for example, ADCP observation was tarried out both at February 2002 and September, 2003), along with numerical modeling, have been carried out over the last several years, in order to understand the tidal dynamics and to examine the related variables according to the tidal current power plant (TCPP) operation.

  • PDF

Weekly Maximum Electric Load Forecasting Method for 104 Weeks Using Multiple Regression Models (다중회귀모형을 이용한 104주 주 최대 전력수요예측)

  • Jung, Hyun-Woo;Kim, Si-Yeon;Song, Kyung-Bin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.9
    • /
    • pp.1186-1191
    • /
    • 2014
  • Weekly and monthly electric load forecasting are essential for the generator maintenance plan and the systematic operation of the electric power reserve. This paper proposes the weekly maximum electric load forecasting model for 104 weeks with the multiple regression model. Input variables of the multiple regression model are temperatures and GDP that are highly correlated with electric loads. The weekly variable is added as input variable to improve the accuracy of electric load forecasting. Test results show that the proposed algorithm improves the accuracy of electric load forecasting over the seasonal autoregressive integrated moving average model. We expect that the proposed algorithm can contribute to the systematic operation of the power system by improving the accuracy of the electric load forecasting.

Quantitative estimation system development for project similarity (주요 건물군의 유사도 정량화 측정 시스템)

  • Lee, Eun-Ji;Choi, Byoung-Il;Ko, Yong-Ho;Han, Seung-woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.162-163
    • /
    • 2014
  • Operation and maintenance stage consists the largest portion of project life cycle cost. Appropriate management and analysis of such stages have massive effect on the total project cost. The effective prediction of optimized repair period is one of main factors in ㅌ management. However, it has been analyzed that the prediction of appropriate repair period revealed limitations in reliability. Therefore, this study suggests a methodology of repair period prediction by dividing finished projects into similar groups with same properties to be compared with the target project using quantitative variables.

  • PDF

A Tightly Regulated Triple Output Asymmetrical Half Bridge Flyback Converter

  • Hyeon, Byeong-Cheol;Cho, Bo-Hyung
    • Journal of Power Electronics
    • /
    • v.10 no.1
    • /
    • pp.14-20
    • /
    • 2010
  • In this paper, a tightly regulated triple output asymmetrical half bridge flyback (ASHF) converter is proposed. In order to regulate all output voltages, pulse frequency modulation (PFM), pulse width modulation (PWM) and phase delay (PD) are used simultaneously. In comparison with the conventional PWM-PD method, the interactions among the control variables are minimized and the operating range is increased. By the utilization of a multi winding transformer, the auxiliary transformer and the blocking capacitor are eliminated and the size and cost of the proposed converter is reduced. The operation principle of the converter is explained and the modes of operation are investigated. Based on the results, the steady state characteristics of the converter are explored. A 24V/10A, 12V/5A, 5V/10A hardware prototype is built and tested to verify the analysis results and the voltage regulation of the triple outputs of the proposed converter.

Symbolic Reliability Evaluation of Combinational Logic Circuit (조합논리회로의 기호적 신뢰도 계정)

  • 오영환
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.7 no.1
    • /
    • pp.25-28
    • /
    • 1982
  • A method for finding the symbolic reliability expressision of a conbinational logic circuit is presented. The evaluation of the probabilities of the outputs can be symbolically evaluated by the Boolean operation named sharp operation, provided that every input of such a circuit can be treated as random variables with values set(0, 1) and the output of a circuit can be represented by a Boolean sum of produt expression.

  • PDF

The Determination of Coagulant Feeding Rate in the Water Treatment Plant Using Intelligent Algorithms

  • Kim, Yong-Yeol;Jung, Hyung-Tae;Jang, Gil-Soo;Park, Chul-Hong;Kang, E-Sok
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2001.10a
    • /
    • pp.123.2-123
    • /
    • 2001
  • It is difficult to determine the feeding rate of coagulant in the water treatment plant, due to nonlinearity, multivariables and slow response characteristics, etc. To deal with this difficulty, the neuro-fuzzy system and the genetic-fuzzy system were used in determining the feeding rate of the coagulant. The fuzzy system is excellently robust in multi-variables and nonlinear problems. Therefore it uses basic algorithm, but it is difficult to construct of the fuzzy parameter such as the rule table and the membership function, Therefore we made the neuro-fuzzy system and the genetic-fuzzy system with the fusion of learning algorithms and compared the performance of the two fuzzy systems. To apply these algorithms, we made the rule table, membership function from the actual operation data of the water treatment plant. We determined optimized feeding rate of coagulant using the fuzzy operation, and also compared ...

  • PDF

FMS Performance Evaluation Method of Deterministic Model (확정적 경우의 유연생산시스템 성능평가방법)

  • 황규완;배홍석
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.19 no.37
    • /
    • pp.71-85
    • /
    • 1996
  • There are studied on the evaluation of flexibility and design/operation of FMS. However. a new method that can assess the performance of FMS is propose in this study. To evalute the performance of an FMS the ordinary for total cost is not applied. Instead, a specially developed cost function is used to measure the performanced of proposed systems. The procedure is developed for deterministic variables cases. An FMS can produce various products systematically under computer control the evaluation of an FMS operation is not a simple task. The proposed procedure is done through computer simulation due to the complicated nature of the problem. A simulation model is developed using SIMAN and FORTRAN for practical application.

  • PDF