• Title/Summary/Keyword: Operation time method

Search Result 3,422, Processing Time 0.041 seconds

The test bed for teleoperated space robot (우주로봇 원격제어 테스트 베드)

  • 김동구;박종오
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1997.10a
    • /
    • pp.760-763
    • /
    • 1997
  • Using telesensor programming method, we control the space robot which has two 2-DOF manipulators. To make this control system, we devide total works by elemental operation. And we make a simulation system that can simulate sensors and robot. In the simulation system, we make a sensor data and robot paths by "Teaching by showing" method. And using these data, we control the real space robot. This off-line method can solve long time delay problem in teleoperation.operation.

  • PDF

Motion Control Algorithm Expanding Arithmetic Operation for Low-Cost Microprocessor (저가형 마이크로프로세서를 위한 연산처리 확장 모션제어 알고리즘)

  • Moon, Sang-Chan;Kim, Jae-Jun;Nam, Kyu-Min;Kim, Byoung-Soo;Lee, Soon-Geul
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.18 no.12
    • /
    • pp.1079-1085
    • /
    • 2012
  • For precise motion control, S-curve velocity profile is generally used but it has disadvantage of relatively long calculation time for floating-point arithmetics. In this paper, we present a new generating method for velocity profile to reduce delay time of profile generation so that it overcomes such disadvantage and enhances the efficiency of precise motion control. In this approach, the velocity profile is designed based on the gamma correction expression that is generally used in image processing to obtain a smoother movement without any critical jerk. The proposed velocity profile is designed to support both T-curve and S-curve velocity profile. It can generate precise profile by adding an offset to the velocity profile with decimals under floating point that are not counted during gamma correction arithmetic operation. As a result, the operation time is saved and the efficiency is improved. The proposed method is compared with the existing method that generates velocity profile using ring buffer on a 8-bit low-cost MCU. The result shows that the proposed method has no delay in generating driving profile with good accuracy of each cycle velocity. The significance of the proposed method lies in reduction of the operation time without degrading the motion accuracy. Generated driving signal also shows to verify effectiveness of the proposed method.

Emergency Trephination Site of Acute Subdural Hematoma (급성 경막하 혈종에서 응급 두개골 천공의 위치)

  • Moon, Soo-Hyeon;Kim, Geun-Hoe;Kwon, Taek-Hyun;Park, Youn-Kwan;Chung, Hung-Seob;Suh, Jung-Keun
    • Journal of Korean Neurosurgical Society
    • /
    • v.29 no.5
    • /
    • pp.659-663
    • /
    • 2000
  • The motality rate of acute subdural hematoma(ASDH) associated with closed head injury is high in spite of recent advances in neurosurgery. Many variables in regard to outcome of ASDH have been assessed. But among them, intracranial pressure(ICP) control and the time interval between injury and operative evacuation are the only things that can be affected by doctor. We introduced a simple method to the management of ASDH for reducing the time interval between injury and operation. When the immediate decompressive operation of ASDH was impossible by any causes, we made a burr hole at the center of hematoma, usually on 2-3cm above temporal squama and 1-2cm behind coronal suture under local anesthesia before main operation. Partial hematoma evacuation was achieved through the burr hole and it was effective in preventing further worsening of patients neurological status before main operation. Prompt hematoma evacuation through the burr hole seemed to be effective in delaying secondary ischemic brain damage and made easy to closing the dura opening and replacement of the bone flap at the end of main decompressive operation. This easy method may reduce the time interval between injury and operation. We represent surgical technique with two cases of ASDH managed with this simple method.

  • PDF

Physical-Aware Approaches for Speeding Up Scan Shift Operations in SoCs

  • Lee, Taehee;Chang, Ik Joon;Lee, Chilgee;Yang, Joon-Sung
    • ETRI Journal
    • /
    • v.38 no.3
    • /
    • pp.479-486
    • /
    • 2016
  • System-on-chip (SoC) designs have a number of flip-flops; the more flip-flops an SoC has, the longer the associated scan test application time will be. A scan shift operation accounts for a significant portion of a scan test application time. This paper presents physical-aware approaches for speeding up scan shift operations in SoCs. To improve the speed of a scan shift operation, we propose a layout-aware flip-flop insertion and scan shift operation-aware physical implementation procedure. The proposed combined method of insertion and procedure effectively improves the speed of a scan shift operation. Static timing analyses of state-of-the-art SoC designs show that the proposed approaches help increase the speeds of scan shift operations by up to 4.1 times that reached under a conventional method. The faster scan shift operation speeds help to shorten scan test application times, thus reducing test costs.

The properties of Sb-doped $Ge_{1}Se_{1}Te_{2}$ thin films application for Phase-Change Random Access Memory (상변화 메모리 응용을 위한 Sb-doped $Ge_{1}Se_{1}Te_{2}$ 박막의 특성)

  • Nam, Ki-Hyeon;Choi, Hyuk;Ju, Long-Yun;Chung, Hong-Bay
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.1329-1330
    • /
    • 2007
  • Phase-change random access memory(PRAM) has many advantages compare with the existing memory. For example, fast programming speed, low programming voltage, high sensing margin, low power consume and long cyclability of read/write. Though it has many advantages, there are some points which must be improved. So, we invented and studied new constitution of $Ge_{1}Se_{1}Te_{2}$ chalcogenide material. Actually, the performance properties have been improved surprisingly. However, crystallization time was as long as ever for amorphization time. In this paper, we studied in order to make set operation time and reset operation voltage reduced. In the present work, by alloying Sb in $Ge_{1}Se_{1}Te_{2}$. we could confirm that improved its set operation time and reset operation voltage. As a result, the method of Sb-alloyed $Ge_{1}Se_{1}Te_{2}$ can be solution to decrease the set operation time and reset operation voltage.

  • PDF

Fixation of Open Alveolar Bone Fractures: Easily Applicable Method in the Emergency Department (개방성 치조골 골절의 고정법: 응급실에서 간편하게 적용할 수 있는 방법)

  • Seol, Seung Hwan;Cha, Soo Hyun;Choi, Sang Cheon;Ahn, Jung Hwan;Kim, Gi Woon;Choi, Hea Kyung;Cho, Joon Pil;Jung, Yoon Seok
    • Journal of Trauma and Injury
    • /
    • v.20 no.2
    • /
    • pp.72-76
    • /
    • 2007
  • Purpose: The purpose of this clinical trial was to evaluate the fixation method for treating alveolar fractures in an emergency department. Methods: The efficiency of using the fixation method was judged on the basis of clinical criteria. Stability, occlusion state, bleeding amount after fixation, operation time, and difficulties during procedural operation were recorded. Results: Eight patients were enrolled in this study. In all instances, the fixation method was effective in bleeding control. Each patient had a noticeable decrement in bleeding. A wire was used for four of the eight patients, and nylon strings was used for the others. The average operation time was 6.3 minutes for the wire patients and 2.8 minutes for the Nylon string patients. No specific problem was identified during the procedural operation. However, the difference in the fixation material influenced the effectiveness of the procedure, the operation time, and the satisfaction of the doctor. Conclusion: In the emergency department, the fixation method using wire or nylon string in the treatment of alveolar fractures is effective in bleeding control

Microgrid operating method in realtime pricing (실시간 전기요금제에서 마이크로그리드의 운용 방법)

  • Jyung, Tae-Young;Baek, Young-Sik
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.12
    • /
    • pp.2165-2172
    • /
    • 2010
  • This paper presents the operation algorithm of microgrid on the Real Time Pricing(RTP) for building the smart grid. RTP is higher power price variability than flat rate and time of use. However it has an effect on peak clipping and peak load shifting due to the increased price on peak time power demand. When the RTP are applied to the microgrid system, the proposed algorithm is able to be effective and economic operation. The implemented system is operated for the economic operation in microgrid connected with the power system. On the other hand, when the microgrid is operated on isolation mode, it focus on the improvement of stability and the power supply reliability of the sensitive loads. The test system are implemented and calculated on various operation modes based on non-dispachable generator output and RTP data for validating the proposed operation algorithm. The calculated results are compared to the implemented results using real-time simulator. It can be confirmed that the proposed operation system are identical results to the calculated one. When the proposed operation algorithm is applied to the system, it can be show the effectiveness of the peak clipping and peak load shifting and the improvement of economic feasibility.

Topology Generation and Analysis of the No Dead Time AC/DC Converter

  • Zheng, Xinxin;Xiao, Lan;Tian, Yangtian
    • Journal of Power Electronics
    • /
    • v.14 no.2
    • /
    • pp.249-256
    • /
    • 2014
  • A novel topology generation method for the no dead-time three-phase AC/DC converter is proposed in this study. With this method, a series of no dead time topologies are generated and their operation principles are analyzed. The classic three-phase bridge AC/DC converter can realize a bidirectional operation. However, dead-time should be inserted in the driving signals to avoid the shoot-through problem, which would cause additional harmonics. Compared with the bridge topology, the proposed topologies lack the shoot-through problem. Thus, dead time can be avoided. All of the no dead time three-phase AC/DC converters can realize bidirectional operation. The operating principles of the converters are analyzed in detail, and the corresponding control strategies are discussed. Comparisons of waveform distortion and efficiency among the converters are provided. Finally, 9 KW DSP-based principle prototypes are established and tested. Simulation and experimental results verify the theoretical analysis.

Implementation of the multi-target tracker for MIROSOT

  • In, Chu-Sik;Choi, Yong-Hee;Lee, Ja-Sung
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1997.10a
    • /
    • pp.828-831
    • /
    • 1997
  • One of the most important design factor for the image tracker is the speed of the data processing which allows real-time operation of the system and provides reasonably accurate performance at the same time. Use of powerful DSP alone does not guarantee to meet such requirement. In this paper, a simple efficient algorithm for real-time multi-target image tracking is suggested. The suggested method is based on a recursive centroiding technique and color table look-up. This method has been successfully implemented in a image processing system for Micro-Robot Soccer Tournament(MIROSOT). This tracker can track positions of a ball, 3 enemies, and 3 agents at the same time. The experimental results show that the processing time for each frame of image is less than 7ms, which is well within the 60Hz sampling interval for real-time operation.

  • PDF

A study of the relationship between the subjective symptoms of VDT syndrome and occupational factors in VDT operators (VDT작업자의 작업조건과 다발하는 자각증상과의 관련성에 관한 연구)

  • Kim Kap-Sung;Lee Seung-Deok
    • Journal of Acupuncture Research
    • /
    • v.18 no.6
    • /
    • pp.70-83
    • /
    • 2001
  • Objective : In order to investigate symptoms prevalence related to visual display terminal(VDT) syndrome, and to evaluate the variables affecting the development of the VDT syndrome. Methods : a questionnaire survey was conducted on 127(81 men and 46 women) VDT operators who had been studied in Soongsil University graduated school in Seoul. Result : As a result of analysis with data collected by questionnaire, l. Variables affecting the level of general symptoms were sex, the total time of VDT operation per day, type of typewriting, location of keyboard, illumination, VDT working duration, the time of VDT operation without rest. 2. Variables affecting the level of eye symptoms were sex, the total time of VDT operation per day, type of typewriting, VDT working duration, illumination, method of eye-resting. 3. Variables affecting the level of musculoskeletal symptoms were sex, the total time of VDT operation per day, the time of VDT operation without rest, illumination. Conculsions : In order to protect workers from VDT syndrome, it is urgently required to implement standard management recommendations including restriction of VDT working hours and allowance of more sufficient resting time for VDT workers.

  • PDF