• Title/Summary/Keyword: Operation deficit

Search Result 95, Processing Time 0.027 seconds

Comparison of Water Supply Reliability by Dam Operation Methods (댐 운영방식에 따른 이수안전도의 비교)

  • Choi, Si Jung;Lee, Dong-Ryul;Moon, Jang Won
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.6
    • /
    • pp.523-536
    • /
    • 2014
  • A water supply reliability is mainly influenced by water demand, reservoir storage, and inflow change caused from drought. The water supply reliability can vary depending on the method of dam operation. In Korea, the deficit-supply method which complements water deficit as water shortage occurs in downstream areas has been used for the national water resources master plan using K-WEAP, but the prime flow method, an alternative approach, would show different results of water supply reliability in comparison to the deficit-supply method. The objective of this research is to compare and analyze differences in water supply reliability according to dam operation methods. These results can be used to re-evaluate water supply reliability of dam in a circumstance considering steady dam release for instreamflow in downstream and hydroelectric power generation.

Flow duration change in downstream of reservoir by selective deficit supply method (선택적 부족분 공급방식에 따른 댐 하류하천의 유황 변화 분석)

  • Choi, Youngje;Park, Moonhyung
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.12
    • /
    • pp.1021-1030
    • /
    • 2022
  • Currently, South Korea implements water resources management policies focusing on integrated water quantity, quality and hydro-ecology management. In particular, rehabilitation of natural rivers has become a major issue. As for reservoir operation during non-flood season, efforts have been made continuously to apply the Deficit Supply Method that can maximize water supply to address droughts and increase in water demand. When Deficit Supply Method is applied, the water supply capacity of reservoir can be maximized. However, downstream water flow would remain constant. In consideration that a natural stream, a long-time-created hydro-ecology, can be significantly influenced by flow variability, the Deficit Supply Method-based reservoir operation can generate effective water supply. Still, it may trigger adverse effects from the aspects of natural rehabilitation and hydro-ecology recovery. The main objective of this study is to analyze impacts on downstream flow duration through reservoir simulation by comparing the Firm Supply Method, the Deficit Supply Method and the Selective Deficit Supply Method, and examining each method's effects on reservoir operation. This study found that the Firm Supply Method could maintain water flow variability, but could not maximize water supply capacity. When the Deficit Supply Method was applied, water supply capacity could be increased while remaining vulnerable regarding water flow variability, as a difference between average flow and low flow was negligible at downstream. In comparison, the Selective Deficit Supply Method was found to sustain time-based reliability at 95% or higher, whereas downstream flow duration could be maintained at a level similar to the level generated by the Firm Supply Method.

A Case Study about PET/CT Collaboration Operation (PET/CT 공동운영에 대한 사례 연구)

  • Kim, Chang-Ho;Pyo, Sung-Jae
    • The Korean Journal of Nuclear Medicine Technology
    • /
    • v.14 no.2
    • /
    • pp.87-92
    • /
    • 2010
  • Purpose: In 2003, we decided to buy a PET/CT, at the time, it was the latest cancer diagnostic medical equipment. Equipment company was offered the marketing of collaboration operation because the highly cost of PET/CT. However, this hospital's choice was own purchase way. In this study we evaluated the collaboration operation way by post-mortem analysis to the current situation. Materials and Methods: From 2004 until 2008, five years, we investigate the revenue analysis the number of PET/CT cases about own purchase way and collaboration operation way according (ABC costing). Results: The year 2004, own purchase way is 4 billion 9 thousand 2 hundred million won in deficit, the collaboration operation way is 1 billion 1 thousand 7 hundred million won in deficit. The year 2005, own purchase way is 1 billion 5 hundred million won in deficit, collaboration operation way is 8 thousand 7 hundred million won in deficit. However, the year 2006, own purchase way is 5 billion 1thousand 3 hundred million won in surplus, collaboration operation way is 9 thousand 9 hundred million won in deficits. The year 2007 and 2008, revenue of own purchase way is more increased but the collaboration operation way is more decreased. From the year 2004 to 2008, subtotal of own purchase way is 10 billion 8 thousand 8 hundred won in surplus, sub-total of collaboration operation way is 6 billion 7 thousand million won in deficit. Conclusion: Own purchase way has been a big benefit occurs and to reflect the equipment price, the collaboration operation way became to deficit continues. In other words, the problem of collaboration operation way showed us. When you buy the high cost Equipment, consideration will be risk and economic analysis of variance, the appropriate of the initial investment cost, clinical diagnostic needs and etc.

  • PDF

Definition of Deficit Lines and Stations in Korean Railways (철도 적자노선 및 적자역의 개념 정립에 관한 고찰)

  • Jung Ho-Young;Lee Chang-Woon
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.1033-1040
    • /
    • 2005
  • There have been significant changes in the Korean railway environment in recent years. First, as the railway restructuring plan, Korea Rail Network Authority and KORAIL were established and commenced their works. Secondly, the opening of the high speed railway has provided a chance of reorganization in the whole operation system of the Korean railway network. These new changed environments require an alternative plan to examine the management system of deficit lines and their stations. This paper is intended to approach to clearly define the concept of deficit rail stations and lines in order to make a contribution to establish a comprehensive rationalization plan in the management environment of railroad. The study proposes some method to categorize their deficit stations and lines by three ways.

  • PDF

Water Yield Evaluation of a Reservoir System Based on a Deficit Supply in the Han River Basin (부족분 공급방식의 한강수계 저수지 시스템 용수공급능력 평가)

  • Choi, Youngje;Lee, Eunkyung;Ji, Jungwon;Yi, Jaeeung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.5
    • /
    • pp.477-484
    • /
    • 2020
  • Reservoir operation affects the sustainability of a water supply. However, the increase in the temporal and spatial variability of rainfall, attributed to climate change, has led to severe droughts and increased difficulty in maintaining a sustainable discharge at certain locations in a reservoir system operation. In this study, water yield was evaluated using reservoir simulation with varied water supply. Three reservoir system models were simulated for nine reservoirs in the Han River basin. The time-based reliability, volumetric reliability, and resiliency were used to evaluate the results. Each case was simulated by applying firm supply, deficit supply, and deficit supply with historical power release of the Hwacheon Reservoir. As a result of the simulation, all indexes were increased when the deficit supply was applied. In particular, the time-based reliability increased by more than 30%, and the supply reliability increased by about 4%. The result showed that the water supply of the entire water system could be increased when all reservoirs in the water system were operated to supply water and maintain sustainable discharge at the same downstream point. The deficit supply was an efficient reservoir operation method for responding to climate change, especially increased rainfall variability.

Assessmnnt of Optinal Amount of Water Resources by Groundwater Dam (지하댐에 의한 안정적 적정개발가능량 평가)

  • Park Chang Kun;Park Jae Hyeon;Kim Dae Kun;Yang Jung Seok
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.260-264
    • /
    • 2005
  • Effective use of water resources has become a social problem because the deficit of water comes from population growth and Industrial development. Therefore, the conjunctive operation of surface water and groundwater will become an alternative. Groundwater has many advantages for the evaporation and effect of rainfall compared with surface water. Although the available amount of groundwater is small, groundwater dam can be used complementarily because of the sustainable supply of water. A calculating technique of the optimal amount of water resources by the groundwater dam was developed. A pilot site was selected to assess the optial amount of groungwater for the designed groungwater dam. If the developed technique is more refined by the measured data, the groundwater dam will become a good alternative to develope the water resources in the water deficit area.

  • PDF

A Study on Estimate of Evaluation Indices of Water Supply Capacity for Multipurpose Dam (다목적댐의 응수공급능력 평가지표 산정에 관한 연구)

  • Cha, Sang Hwa;Park, Gi Beom
    • Journal of Environmental Science International
    • /
    • v.13 no.3
    • /
    • pp.197-204
    • /
    • 2004
  • In this study analyzed the reliability indices against the water supply ability of Andong dam. The water supply analysis of Andong dam used the HEC-5 model. So Andong dam simulated planed water-supply capacity of Andong dam as increase and decrease +5% ~ -5% of water supply quantity. Water-supply capacity of Andong dam estimated, deficit occurrence, deficit quantity, deficit period. As the results estimated reliability(occurrence based, time based, quantity based) and resiliency vulnerability and with water supply capacity evaluation indices of Andong dam. Also reliability(occurrence based, time based, quantity based), resiliency, vulnerability and resiliency indices are estimated to evaluated the performance of water supply on Andong dam, and their relationships are evaluated.

Performance Evaluation of Water Supply for a Multi-purpose Dam by Deficit-Supply Operation (물 부족량 공급 운영 방식에 의한 다목적댐 물 공급의 안정성 평가)

  • Lee, Dong Ryul;Moon, Jang Won;Choi, Si Jung
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.2
    • /
    • pp.195-206
    • /
    • 2014
  • In this study, a performance evaluation method of water supply for a multi-purpose dam based on deficitsupply method and reservoir storage is presented. The method is applied to 16 multi-purpose dams and water supply performance is evaluated. As a result, 6 dams (Soyanggang, Chungju, Hoengseong, Andong, Imha, and Hapcheon dam) have highest performance and 2 dams (Sumjingang and Buan dam) have relatively low performance. Particularly, Buan dam is the most vulnerable in the analysis results of reliability, resiliency, and vulnerability. Therefore, measures to improve the performance of water supply are needed in Buan multi-purpose dam.

Algorithm Calculating Optimal DG Capacity Considering Operating Deficit in Hybrid Internal Combustion Generation (하이브리드 내연발전에서 도서 운영 결손액을 고려한 분산전원 최적 용량 산정 알고리즘)

  • Son, Joon-Ho;Kim, Mi-Young
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.10
    • /
    • pp.655-660
    • /
    • 2018
  • Internal combustion generation (ICG) is used to supply power to islands due to geographical characteristics, but there are some problems, such as considerable operating cost, salt pollution, and environmental pollution. For these islands, KEPCO pays a significant amount of operating deficit each year, especially for the fuel and servicing costs, which account for a large portion of this deficit. Integrated ICG (IICG) through an offshore cable between near islands is being considered to decrease servicing costs. Distributed generation (DG) is also being introduced on the islands because of the demand for a low-carbon society. In hybrid internal combustion generation (HICG), DG is introduced into IICG, which can be applied because the DG output is insufficient due to environmental characteristics, and the IICG is used as an auxiliary power source. Therefore, this paper proposes an algorithm to estimate the optimal DG capacity that can be introduced in accordance with the KEPCO operating deficit in the HICG. According to simulations, the optimal DG capacity depends on the fuel cost and load capacity. The validity of the proposed algorithm was confirmed for multiple islands with different peak loads.

Acute Achilles Tendon Rupture : - Isokinetic plantarflexion torque evaluation after Krackow suture technique - (급성 아킬레스건 파열 - Krackow 봉합술 후 등속성 족저 굴곡력의 분석 -)

  • Jung, Hong-Geun;Yoo, Suk-Ju;Lee, Sung-Chul;Park, Hee-Gon;Kim, Ki-Young;Kim, Myung-Ho
    • Journal of Korean Foot and Ankle Society
    • /
    • v.6 no.2
    • /
    • pp.181-189
    • /
    • 2002
  • Purpose: We try to evaluate the functional outcomes of the ankle with isokinetic plantaflexion torque for acute achilles tendon rupture cases those treated by primary repair with the Krackow suture technique and early rehabilization. Materials and Method: The authors studied retrospectively, 15 patients of acute achilles tendon rupture treated and followed over six months, from July 1997 to May 2001. There were 12 men and 3 women, and mean age was 39.6year. The repair method of ruptured tendon was single or double Krackow suture technique. One week(5days-2weeks) after operation, early ROM with ankle-foot orthosis was started. We used Arner-Lindholm Scale for the clinical evaluation and analyzed patient's satisfaction and subjective strength deficit. We analyzed the dorsiflexion peak torque and plantarflexion peak torque of the ankle statistically with strength test with Cybex dynamometer. Result: In clinical results, we had 11 excellent cases(73%) and 3 good cases(20%). In patients satisfaction degree, 11 excellent cases(66.6%), 3 good cases(20%) and 2 fair cases(13.4%). And in strength deficit, 3 none deficit (20%), 9 minimal deficit(60%). We evaluated the isokinetic plantar flexion torque in 3months or 6months after operation. After 3 months, isokinetic test showed the mean functional deficits, 32% and 25% at $30^{\circ}$ and $120^{\circ}/sec$, in 7 cases(46.6%) of 15 cases respectively. After 6 months, the mean deficits were in 21%, 24% at 30. and $120^{\circ}/sec$, respectively. At 3 and 6 months' follow up, absolute value of isokinetic test showed increase of 25. 31bs to 421bs and 19.61bs to 271bs at $30^{\circ}$ and $120^{\circ}/sec$, respectively. Conclusion: We had good result for acute achilles tendon rupture treated by Krakow suture technique and early range of motion exercise of the ankle. After 6 months, strength deficit was 21% in all of cases but were able to return pre-injured state. This study shows Krakow suture technique was recommended method for primary repair and early rehabilization of achilles tendon ruptue.

  • PDF