• Title/Summary/Keyword: Operation and maintenance cost

Search Result 490, Processing Time 0.025 seconds

Analysis of the Switch Installation Criteria by Increasing Operating Capacity in Distribution Line (배전선로 운전용량 상향에 따른 개폐기 설치 기준 분석)

  • Jo, Nam-Hun;Ha, Bok-Nam;Lee, Heung-Ho
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.51 no.6
    • /
    • pp.290-295
    • /
    • 2002
  • The present assignment in installing the number of switches for distribution line was made on the basis of a normal feeder capacity 7,000kVA in KEPCO(Korea Electric Power Corporation), Korea. But the normal capacity is revised to 10000kVA in 1998. Even increasing limit of the operating capacity of the distribution lines enables us to give some benefit for the operation flexibility and investment cost of the distribution system. It is disadvantageous in the viewpoint of supply reliability. In distribution systems, switches are equipped to improve the reliability of distribution systems by minimizing the outage section due to fault and maintenance. Utility generally improves the reliability by minimizing the length of outage section, which is caused by fault and maintenance, through switch equipment on distribution system. In order to cope with the changes such as operation capacity, it is necessary to study whether the present criteria is reasonable or not, also to confirm whether the present criteria of installing switches in line is improved or not. In this study, we proposes the number of switch per feeder on the basis of present operation capacity in distribution system.

Probabilistic Analysis of Repairing Cost Considering Random Variables of Durability Design Parameters for Chloride Attack (염해-내구성 설계 변수에 변동성에 따른 확률론적 보수비용 산정 분석)

  • Lee, Han-Seung;Kwon, Seung-Jun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.1
    • /
    • pp.32-39
    • /
    • 2018
  • Repairing timing and the extended service life with repairing are very important for cost estimation during operation. Conventionally used model for repair cost shows a step-shaped cost elevation without consideration of variability of extended service life due to repairing. In the work, RC(Reinforced Concrete) Column is considered for probabilistic evaluation of repairing number and cost. Two mix proportions are prepared and chloride behavior is evaluated with quantitative exterior conditions. The repairing frequency and cost are investigated with varying service life and the extended service life with repairing which were derived from the chloride behavior analysis. The effect of COV(Coefficient of Variation) on repairing frequency is small but the 1st repairing timing is shown to be major parameter. The probabilistic model for repairing cost is capable of reducing the number of repairing with changing the intended service life unlike deterministic model of repairing cost since it can provide continuous repair cost with time.

Analysis for the Economic efficiency of District Heating and Gas Engine Co-generation System comparing with Central Heating System (중앙난방방식을 지역난방.소형열병합난방방식으로 전환시의 경제성 비교 분석)

  • Kim, Kyu-Saeng;Lee, Sang-Hyeok;Hong, Kyung-Pyo;Won, Young-Jae
    • Proceedings of the SAREK Conference
    • /
    • 2007.11a
    • /
    • pp.459-465
    • /
    • 2007
  • This study was conducted to calculate the LCC of a apartment complex with a type of heating system, district heating and cogeneration system. For the purpose of analyzing LCC according to size of apartment complex, 500, 1,500 and 4,000 houses of model apartment selected. This research performs design of heating system and the life cycle cost analysis including an initial cost, energy cost, maintenance and operation cost, replacement cost and renovation cost during the project period(15years). According to the calculated results, 1) Initial cost of cogeneration system with 500, 1500 and 4000 houses is higher than district heating system each of 20%, 13%, 12%. 2) In case of cogeneration system, the payback period by electric generation is 5.21, 4.92 and 4.47 years and saving cost was calculated 29 billion won, 94 billion won and 262 billion won after payback period. 3) Cogeneration system LCC was 1.12, 1.07 and 1.06 times larger than district system with the size of apartment complex. According to the case of this study district heating system is more efficient than cogeneration system in terms of the reduction of LCC. 4) Gas Engine Co-generation System is more efficient than other systems because it can collect progressive part from electric charge progressive stage system. However, the efficiency is decreasing because of raising of fuel bills(LNG) and lowering of power rate for house use. Especially the engine is foreign-made so the cost of maintenance and repair is high and the technical expert is short. 5) District heating is also affected by fuel bills so we should improve energy efficiency through recovering of waste heat(incineration heat, etc.). Also, we should supply district cooling on the pattern of heat using of let the temperature high in winter and low in summer.

  • PDF

A Study of Appling RIMS of Train's Wheels Management (RIMS 데이터와 도시철도차량 차륜관리에 관한 연구)

  • Jeon, Seo-Tak;Lee, Do-Sun;Kim, Dong-Min;Park, Soo-Choong;Kim, Nam-Woo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.666-672
    • /
    • 2008
  • Train wheels are the most important part of the high-speed rail system with supporting body, running stably and safely. Wheel exchange and fix plan is computed by the worker who managing entire Train Maintenance Process based on his know-how so that this system is losing its reliability and accuracy. And predicting of the wheel's lifetime is absolutely difficult matter because of uncertainty between trains like mileage of the type of trains, condition of operation, curve section and wheel's cutting pattern. Therefore workers always used to hold many wheels. For this reason, the cost of stock is soar when the level of stock was normal. If the stock is sufficient, the cost of stock will rise. On the other hand, If the stock is deficient, we would have trouble that the plan of the train maintenance process will be failed. Thus this paper aimed at application that "Wheel Managing System" which is able to predict wheel's life-cycle and demands under the RIMS(Rolling-Stock Information Maintenance System) with analysing wheel exchanging and cutting status considering economical or stable aspects.

  • PDF

A Statistical Review on States Relating to Operation of Radiotherapy Equipments in Seoul National University Hospital (서울대학교병원의 방사선치료장비 운용 통계에 관한 고찰)

  • Park, Heung-Deuk;Kim, Wan-Sun;Ahn, Hee-Yong
    • The Journal of Korean Society for Radiation Therapy
    • /
    • v.6 no.1
    • /
    • pp.21-30
    • /
    • 1994
  • To analyze the states of operation of radiotherapy facilities in the period from 1979 to 1992 and to get the base for efficient operation and maintenance of the radiotherapy facilities. Data on the records of annual number of patients operated by each facility; span of suspension of operation, the cost and span of repairing, and parts of oui-of-order in the period from 1979 to 1992 were analyzed. We made a comparative analysis of average annual number of patients, annual span of the suspension of operation, annual cost ratio of repair, span of repairing per break down, and total number of broken parts. We could get following annual number of patients(day), span of the suspension of span ($\%$)(day). annual cost ratio fo repair($\%$), span of repairing per break down(Min-Max, day), and number of broken parts from this analysis. 1. Cobalt unit (Picker C-9) : 10,389(43), 0.4(0.83) 0.07, 1hr-2, 3 2. Linac(Clinac 6/100) : 11,492(50), 4.0(9.57), 0.98, 1hr-30, 12 3. Linac(Clinac 18) : 9.115(44), 12.7(30.5), 3.54, 1hr-108. 41 4. Simulator(Picker Ther-X) : 2,017(9), 0.51(1.3), 0.24, 1hr-2, 7 5. RTP(Capentec Cap-plan) : 528(2), 0.4(0.93), - hrs, - The conclusion obtained from statistical analysis above are as follows. 1. The rate of operation of Cobalt unit($99.6\%$) was higher that of Linear Accelerators ($87.3\%$). The rates operation of Simulator and RTP computer were very close to that of Cobalt unit. 2. In order to raise up the working ratio of accelerator. it is desirable that we keep our engineer to learn a sufficient technical skill and the equipment agent to stock sufficient spare parts. 3. In order to maintain Linear Accelerator efficiently, it is desirable to have annually $2.3\%$ of the purchase price of equiment for repairing.

  • PDF

A Study on Cost Prediction of Highway Operating Risk through a Case Study of Power Failure (정전사고 사례분석을 통한 고속도로 운영 위험비용 산정에 대한 연구)

  • Kwon, Yong-Hoon;Kim, Kyong-Ju;Lim, Won-Seok;Park, Chan-Jin;Chae, Myung-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.78-90
    • /
    • 2009
  • Recently, operation of highway is the complex digital Infrastructure based on complicated IT. The application of IT is increasing more and more in digital Infrastructure. Though IT is very convenient, if unpredicted operating risk of highway occurs, widespread damage can be large. When operating risk of highway occurs, road users are out of smoothly-run service because of the operating interruption. This risk causes unpredicted operating management cost and additional maintenance cost. It will excess over the planned operating cost, which may leads to users's unsafety and operator's insolvency because of income loss. Until now, related studies to find out the risk are not sufficient. The purpose of this study is to suggest risk cost items and to estimate the reasonable risk cost by using simulation method in case of occurring the huge power failure at the operating digitalized highway. This study indicates the several plans to hedge against risk cost and the management of highway project. From now on, it will be used as basic data to confirm the soundness of operating system in Digital Infrastructure.

The Economic Effects and Operating Characteristics of the Outdoor Unit in Accordance with Zoning Plan of Gas Engine Driven Heat Pump Installed in the University Building (대학 건물에 설치된 가스엔진구동 히트펌프(GHP) 실외기의 조닝 계획에 따른 운전 특성과 경제적 효과)

  • Park, Kang-Hyun;Kim, Su-Min
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.24 no.1
    • /
    • pp.70-76
    • /
    • 2012
  • The purpose of this study is to analyze of the operating characteristics of the Gas engine driven Heat Pump(GHP) and to reduce maintenance costs through the most Economical plan. As the zoning modifications that have economic effects were confirmed. Applications should be made with a similar purpose of the space. The combination of a modified space has led to reduced operating hours of the outdoor unit. The reduction of the outdoor unit operating hours, reducing maintenance costs accordingly. When analyzed at six years have elapsed, the amount of savings through zoning modifications is more than an additional construction cost. During the design phase, cost-effective operation of the GHP is required for the proper zoning plan.

Crack Initiation and Propagation at the Gas Turbine Blade with Antioxidation and Thermal Barrier Coating (내산화 및 열차폐 코팅처리 가스터빈 블레이드의 균열거동)

  • Kang, Myung-Soo;Kim, Jun-Sung
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.27 no.12
    • /
    • pp.99-106
    • /
    • 2010
  • Gas turbines operation for power generation increased rapidly since 1990 due to the high efficiency in combined cycle, relatively low construction cost and low emission. But the operation and maintenance cost for gas turbine is high because the expensive superalloy hot gas path parts should be repaired and replaced periodically This study analyzed the initiation and propagation of the crack at the gas turbine blades which are coated with MCrAIY as a bond coat and TBC as a top coat. The sample blades had been serviced at the actual gas turbines for power generation. Total 7 sets of blades were analyzed and they have different EOH(equivalent operation hour). Blades were sectioned and the cracking distribution were measured and analyzed utilizing SEM(scanning electron microscope) and optical microscope. The blades which had 52,000 EOH of operation had cracks at the substrate and the maximum depth was 0.2 mm. Most of the cracks initiated at the boundary layer between TBC and bond coat and propagated down to the bond coat. Once bond coat is cracked, the base metal is exposed to the oxidation condition and undergoes notch effect. Under this environment, the crack branched at the inter-diffusion layer and propagated to the substrate. Critical cracks affecting the blade life were analyzed as those on suction side and platform.

Economic Analysis of Heat Pump System through Actual Operation (교육 시설에서의 히트 펌프 냉난방 시스템 실사용을 통한 경제성 분석)

  • Kim, Gil-Tae;Cheong, Seong-Ir;Joo, Ho-Young;Ahn, Young-Chull;Lee, Jae-Keun
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.19 no.6
    • /
    • pp.470-475
    • /
    • 2007
  • The present study has been conducted economic analysis through actual operation of electric heat pump (EHP) and gas engine driven heat pump (GHP) which are installed at the same building in the university. Cost items, such as initial cost, annual energy cost and maintenance cost of each system are considered to analyze life cycle cost (LCC) and economical efficiencies are compared. The initial cost is considered on the basis of actual cost, and annual energy cost is converted into the cost after measuring electricity and gas consumption a day LCC applied present value method is used to assess economical profit of both of them. Variables used to LCC analysis are electricity cost escalation rate, natural gas cost escalation rate, interest rate, and service lives when each of them are 4%, 2%, 8%, and 20 years. The result shows that EHP (148,257,306 won) is more profitable than GHP (161,239,296 won) by 8.05% (12,981,990 won).

Standardization of maintenance and failure of Transfer Crane (Transfer Crane의 고장 및 정비 작업 표준화)

  • Yun Won-Young;Lee You-Hyoun;Ha Young-Ju;Kim Gui-Rae;Son Beom-Sin
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2006.06b
    • /
    • pp.363-366
    • /
    • 2006
  • In the port, Yard Crane is very important. If container crane or transfer crane broke down, it costs much money for delaying of work during the period of repair or reorder. But, we can not have enough spare parts for its high cost. It is necessary for having the reliability of crane through the effective preventive maintenance and failure analysis. In this paper, we analysed the system's function and failure mechanism of transfer crane which is main equipment in the yard. Also, we standardized the failure and maintenance work using the historical data of failure and maintenance. This study which is the basic work for IT of equipment operation and maintenance is going to be new attempt for optimal design of next generation equipment and operation policy of equipment.

  • PDF