• Title/Summary/Keyword: Operation Set Time

Search Result 536, Processing Time 0.04 seconds

Towards inferring reactor operations from high-level waste

  • Benjamin Jung;Antonio Figueroa;Malte Gottsche
    • Nuclear Engineering and Technology
    • /
    • v.56 no.7
    • /
    • pp.2704-2710
    • /
    • 2024
  • Nuclear archaeology research provides scientific methods to reconstruct the operating histories of fissile material production facilities to account for past fissile material production. While it has typically focused on analyzing material in permanent reactor structures, spent fuel or high-level waste also hold information about the reactor operation. In this computational study, we explore a Bayesian inference framework for reconstructing the operational history from measurements of isotope ratios from a sample of nuclear waste. We investigate two different inference models. The first model discriminates between three potential reactors of origin (Magnox, PWR, and PHWR) while simultaneously reconstructing the fuel burnup, time since irradiation, initial enrichment, and average power density. The second model reconstructs the fuel burnup and time since irradiation of two batches of waste in a mixed sample. Each of the models is applied to a set of simulated test data, and the performance is evaluated by comparing the highest posterior density regions to the corresponding parameter values of the test dataset. Both models perform well on the simulated test cases, which highlights the potential of the Bayesian inference framework and opens up avenues for further investigation.

FMS 스케쥴링을 위한 Priority 함수의 자동 생성에 관한 연구

  • 김창욱;신호섭;장성용;박진우
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 1997.04a
    • /
    • pp.93-99
    • /
    • 1997
  • Most of the past studies on FMS scheduling problems may be classified into two classes, namely off-line scheduling and on-line scheduling approach. The off-line scheduling methods are used mostly for FMS planning purposes and may not be useful real time control of FMSs, because it generates solutions only after a relatively long period of time. The on-line scheduling methods are used extensively for dynamic real-time control of FMSs although the performance of on-line scheduling algorithms tends vary dramatically depending on various configurations of FMS. Current study is about finding a better on-line scheduling rules for FMS operations. In this study, we propose a method to create priority functions that can be used in setting relative priorities among jobs or machines in on-line scheduling. The priority functions reflect the configuration of FMS and the user-defined objective functions. The priority functions are generated from diverse dispatching rules which may be considered a special priority functions by themselves, and used to determine the order of processing and transporting parts. Overall system of our work consists of two modules, the Priority Function Evolution Module (PFEM) and the FMS Simulation Module (FMSSM). The PFEM generates new priority functions using input variables from a terminal set and primitive functions from a function set by genetic programming. And the FMSSM evaluates each priority function by a simulation methodology. Based on these evaluated values, the PFEM creates new priority functions by using crossover, mutation operation and probabilistic selection. These processes are iteratively applied until the termination criteria are satisfied. We considered various configurations and objective functions of FMSs in our study, and we seek a workable solution rather than an optimum or near optimum solution in scheduling FMS operations in real time. To verify the viability of our approach, experimental results of our model on real FMS are included.

  • PDF

Reallocation of Force in the Lanchester (3,3) Combat Model (란체스터 (3,3) 전투모형의 전투력 재할당 방안에 관한 연구)

  • Jong-Hyeon Hwang;Dong-Hyung Lee
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.4
    • /
    • pp.263-271
    • /
    • 2023
  • In the (3,3) close combat model based on the Lanchester Square Law, this study proposes a plan to optimally allocate residual combat power after the battle to other battlefields. As soon as the two camps of three units can grasp each other's information and predict the battle pattern immediately after the battle began, the Time Zero Allocation of Force (TZAF) scenario was used to initially allocate combat power to readjust the combat model. It reflects travel time, which is a "field friction" in which physical distance exists from battlefields that support combat power to battlefields that are supported. By developing existing studies that try to examine the effect of travel time on the battlefield through the combat model, this study forms a (3,3) combat model, which is a large number of minimum units. In order to achieve the combat purpose, the principle of optimal combat force operation is presented by examining the aspect that support combat power is allocated to the two battlefields and the consequent battle results. Through this, various scenarios were set in consideration of the travel time and the situation of the units, and differentiated results were obtained. Although the most traditional, it can be used as the basic logic of the training or the commander's decision-making system using the actual war game model.

The Improvement of Electrical Point Machine Wiring Set (선로전환기(NS)의 배선세트 개선)

  • Jeong, Rag-Gyo;Park, Gun-Won
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.9
    • /
    • pp.351-358
    • /
    • 2016
  • An Electrical Point Machine (NS:New-type Switch), which is equipped and operated at railways in Korea, has been used since the 1960s after being imported from Japan. On the other hand, although the mechanical configuration has improved the position motor control circuit, the electrical connection has not been improved, so NS may have a problem, such as the interlocking system of automatic train operation. In addition, NS is the most vulnerable part in the railway system and a huge train accident may occur due to minor defects. The existing NS wiring set of the circuit controller should be checked only if fixed. Therefore, an excessive inspection time only by a Railroad Signal expert is required. In this paper, the improvement of electrical connection in a NS wiring set, such as the position motor control circuit, was developed and the prototype was installed at Seoul Metro in the distance to go section. The results can be used to help make appropriate adjustments. The improvement of the NS wiring set enhance the maintenance efficiency, passenger service and the stability of the signal system as well as reducing the maintenance cost.

Relationship Between Farm Land Structure and Machine Efficiency

  • Singh, Gajendra;Ahn, Duck-Hyun
    • Proceedings of the Korean Society for Agricultural Machinery Conference
    • /
    • 1993.10a
    • /
    • pp.119-128
    • /
    • 1993
  • Effective machine capacity is affected by the physical and geometrical conditions of the fields. In the small and scattered farmland structure field efficiency is greatly influenced by plot geometry. In this paper, a method for estimating field efficiency and effective machine capacity was developed . The developed method was applied to Korean paddy cultivation. Various time elements related to farm operations for small and scattered plots are discussed in this paper . Available working time is divided into two parts, viz. the preparation time for machine operation and actual working time. Two kinds of machine efficiencies, namely , Machine Efficiency 1, applicable on a single large plot or set of well consolidated plots ; and Machine Efficiency 2, applicable on small and scattered multiple plots, are considered. Based assumptions made and steps followed to construct the model are discussed. Effective capacity of each machine based on different plot geometries are calculated y the model. Machine efficiency on a single plot increases with increase in the dimension of longer side of the plot . Low speed, low theoretical capacity machines have higher machine efficiency which is only slightly influenced by plot geometry. As plot geometry is improved , the machine efficiency of high speed, high capacity machines increases rapidly. The effects of short side length and plot size on machine efficiency on a single plot depend on the type of farm operation. For a particular plot shape, as plot size increases, machine efficiency on multiple plots increases rapidly. The effects of consolidation on machine efficiency is highly significant if the plot size is small and/or machine size is large.

  • PDF

Resource Allocation Method using Credit Value in 5G Core Networks (5G 코어 네트워크에서 Credit Value를 이용한 자원 할당 방안)

  • Park, Sang-Myeon;Mun, Young-Song
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.24 no.4
    • /
    • pp.515-521
    • /
    • 2020
  • Recently, data traffic has exploded due to development of various industries, which causes problems about losing of efficiency and overloaded existing networks. To solve these problems, network slicing, which uses a virtualization technology and provides a network optimized for various services, has received a lot of attention. In this paper, we propose a resource allocation method using credit value. In the method using the clustering technology, an operation for selecting a cluster is performed whenever an allocation request for various services occurs. On the other hand, in the proposed method, the credit value is set by using the residual capacity and balancing so that the slice request can be processed without performing the operation required for cluster selection. To prove proposed method, we perform processing time and balancing simulation. As a result, the processing time and the error factor of the proposed method are reduced by about 13.72% and about 7.96% compared with the clustering method.

A study on introduction and operation plan of air traffic services operating certification system: Centered on small airfields (항공교통업무증명제도 도입과 운영 방안에 대한 연구: 소규모 비행장을 중심으로)

  • Lim, Jae-Hwan;Kim, Young-Rok;Choi, Yun-Chul
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.25 no.4
    • /
    • pp.154-160
    • /
    • 2017
  • In the former aviation law, only the Ministry of Land, Infrastructure and Transport has to provide air traffic services, In the case of providing aviation transportation service from civilian, such as aviation special education institution, private airfield installer, it was possible to carry out only by receiving a private contract from the government. But at the time of private consignment, the fact that the government has to bear the cost through the contract act. It is pointed out that it is a factor that hinders efficiency in the operation sector. Accordingly, in Article 85 of the Aviation Safety Act, which was enforced in March 2017, legal grounds were established to provide air traffic services excluding the Ministry of Land, Infrastructure and Transport. At the same time, we have introduced the air traffic services operating certification system, which enables the air traffic services to meet the requirements set by the Ministry of Land, Infrastructure and Transport in order to secure the safety of air traffic. In this study, we examine the major issues and problems of the small private control tower operated by the private institute in Korea. The effect of introduction of the air traffic services operating certification system which can introduce all the institutions which do not belong to the control agency in the former aviation law into the institutional system and the operation plan were examined.

Drone Force Deployment Optimization Algorithm For Efficient Military Drone Operations (효율적 군용 드론 작전 운영을 위한 Drone Force Deployment Optimization 알고리즘)

  • Song, Ju-Young;Jang, Hyeon-Deok;Chung, Jong-Moon
    • Journal of Internet Computing and Services
    • /
    • v.21 no.1
    • /
    • pp.211-219
    • /
    • 2020
  • One of the major advancements of the Fourth Industrial Revolution is the use of Internet of Drones (IoD), which combines the Internet of Things (IoT) and drone technology. IoD technology is especially important for efficiently and economically operating C4ISR operations in actual battlefields supporting various combat situations. The purpose of this study is to solve the problems of limited battery capacity of drones and lack of budgeting criteria for military drone transcription, introduction, and operation. If the mission area is defined and corresponding multi-drone hovering check points and mission completion time limits are set, then an energy and time co-optimized scheduling and operation control scheme is needed. Because such a scheme does not exist, in this paper, a Drone Force Deployment Optimization (DFDO) scheme is proposed to help schedule multi-drone operation scheduling and networked based remote multi-drone control.

Through load prediction and solar power generation prediction ESS operation plan(Guide-line) study (부하예측 및 태양광 발전예측을 통한 ESS 운영방안(Guide-line) 연구)

  • Lee, Gi-Hyun;Kwak, Gyung-il;Chae, U-ri;KO, Jin-Deuk;Lee, Joo-Yeoun
    • Journal of Digital Convergence
    • /
    • v.18 no.12
    • /
    • pp.267-278
    • /
    • 2020
  • ESS is an essential requirement for resolving power shortages and power demand management and promoting renewable energy at a time when the energy paradigm changes. In this paper, we propose a cost-effective ESS Peak-Shaving operation plan through load and solar power generation forecast. For the ESS operation plan, electric load and solar power generation were predicted through RMS, which is a statistical measure, and a target load reduction guideline for one hour was set through the predicted electric load and solar power generation amount. The load and solar power generation amount from May 6th to 10th, 2019 was predicted by simulation of load and photovoltaic power generation using real data of the target customer for one year, and an hourly guideline was set. The average error rate for predicting load was 7.12%, and the average error rate for predicting solar power generation amount was 10.57%. Through the ESS operation plan, it was confirmed that the hourly guide-line suggested in this paper contributed to the peak-shaving maximization of customers.Through the results of this paper, it is expected that future energy problems can be reduced by minimizing environmental problems caused by fossil energy in connection with solar power and utilizing new and renewable energy to the maximum.

AN APPLICATION OF INTERPOLATION TECHNIQUE WITH OPTIMUM PATTERN TO VOLTAGE - REACTIVE POWER CONTROL OF POWER SYSTEM (전력계통 전압 - 무효전력제어에의 최적 패턴을 이용한 내삽기법의 적용)

  • Park, Young-Moon;Lee, Jeong-Ho;Yoon, Man-Chul;Kwon, Tae-Won
    • Proceedings of the KIEE Conference
    • /
    • 1992.07a
    • /
    • pp.214-217
    • /
    • 1992
  • This paper introduces a new methodology to apply the interpolation technique wi th optimum pattern to voltage-reactive power control of power system. The conventional tool for the optimal operation of power system is Optimal Power Flow(OPF) by standard optimization techniques. The achievement of solution through OPF programs has a defect of computation time, so that it is impossible to apply the OPF programs to the real-time control area. The proposed method presents a solution in a short period of time and an output with a good accuracy. The optimum pattern is a set of input-output pairs, where an input is a load level and a type of outage and an output is the result of OPF program corresponding to the input. The output in the OPF represents control variables of voltage-reactive power control. The interpolation technique is used to obtain the solution for an arbitrary input. As a result, the new technique helps operators in the process of the real-time voltage-reactive power control in both normal and emergency operating states.

  • PDF