Journal of the Korean Society for Precision Engineering
/
v.13
no.6
/
pp.90-101
/
1996
Determination of assembly sequence of components is a key issue in assembly operation. Although a number of articles dealing with assembly sequence determination have appeared, an efficient and general methodology for complex products has yet to appear. The objective of this paper is to present the problems and models used to generate assembly sequence from design data. An essential idea of this research is to acquire a finite number of voxels from any complex geometric entity, such as 3D planar polygons, hollow spheres, cylinders. cones, tori, etc. In order to find a feasible assembly sequence, the following four steps are needed: (1) The components composing of an assembly product are identified and then the geometric entities of each component are extracted. (2) The geometric entities extracted in the first step are translated into a number of voxels. (3) All the mating or coupling relations between components are found by considering relations between voxels. (4) The components to be disassembled are determined using CCGs (Component Coupling Graph).
Journal of Korean Institute of Industrial Engineers
/
v.28
no.3
/
pp.264-273
/
2002
This paper focuses on disassembly sequencing, which is the problem of determining the optimum disassembly level and the corresponding disassembly sequence for a product at its end-of-life with the objective of maximizing the overall profit. In particular, sequence-dependent operation times, which frequently occur in practice due to tool-changeover, part reorientation, etc, are considered in the parallel disassembly environment. To represent the problem, a modified directed graph of assembly states is suggested as an extension of the existing extended process graph. Based on the directed graph, the problem is transformed into the shortest path problem and formulated as a linear programming model that can be solved straightforwardly with standard techniques. A case study on a photocopier was done and the results are reported.
This paper introduces a simulation study regarding the operation of the Painted Body Storage (PBS) in an automobile factory. In the paint shop of the factory, same colored bodies are grouped together in order to increase the effectiveness of process, for example decrease the loss of cleaning the painting-gun when the color of body changes from one to another. However the production of automobiles in the assembly shop is a typical example of the mixed model assembly production. Therefore PBS locates between the paint shop and the assembly shop for control the input sequence of bodies to the assembly shop, and it enables to meet the smoothing requirement of assembly sequence. There are highly restricted constraints on the assembly sequence in a assembly shop. Those are spacing restriction and smoothing restriction. If such restrictions are violated, conveyor-stop or utility work will be necessary. Thus the major objective of PBS is to control the assembly sequence in a way to meet the two restrictions. In this paper a case study of PBS in an automotive factory is introduced. The storage/retrieval algorithms are suggested and the proposed system is verified using simulation models. Sensitivity analysis for operating factors is also conducted.
Kim, Yong-Sik;Lee, Hong-Chul;Kang, Jung-Yun;Nam, Yoon-Seok
IE interfaces
/
v.14
no.3
/
pp.247-254
/
2001
As current postal automation is limited to dispatch and arrival sorting, delivery sequence sorting is performed manually by each postman. It not only acts as a bottleneck process in the overall mailing process but is expensive operation. To cope with this problem effectively, delivery sequence sorting automation is required. The important components of delivery sequence sorting automation system are sequence sorter and Hangul OCR which function is to extract the address of delivery point. DSI database will be interfaced to both Hangul OCR and sequence sorter for finding the accurate delivery sequence number and stacker number. The objectives of this research are to develop DSI(Delivery Sequence Information) database prototype and client application for managing information effectively. For database requirements collection and analysis, we draw all possible sorting plans, and apply the AHP(Analytic Hierarchy Process) method to determine the optimal one. And then, we design DSI database schema based on the optimal one and implement it using Oracle RDBMS. In addition, as address information in DIS database consist of hierarchical structure which has its correspondence sequence number, so it is important to reorganize sequence information accurately when address information is inserted, deleted or updated. To increase delivery accuracy, we reflect this point in writing application.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.48
no.12
/
pp.1554-1563
/
1999
This paper presents the design of high speed processor for a sequence logic control using field programmable gate array(FPGA). The sequence logic controller is widely used for automating a variety of industrial plants. The FPGA designed by VHDL consists of program and data memory interface block, input and output block, instruction fetch and decoder block, register and ALU block, program counter block, debug control block respectively. Dedicated clock inputs in the FPGA were used for high speed execution, and also the program memory was separated from the data memory for high speed execution of the sequence instructions at 40 MHz clock. Therefore it was possible that sequence instructions could be operated at the same time during the instruction fetch cycle. In order to reduce the instruction decoding time and the interface time of the data memory interface, an instruction code size was implemented by 16 bits or 32 bits respectively. And the real time debug operation was implemented for easy debugging the designed processor. This FPGA was synthesized by pASIC 2 SpDE and Synplify-Lite synthesis tool of Quick Logic company. The final simulation for worst cases was successfully performed under a Verilog HDL simulation environment. And the FPGA programmed for an 84 pin PLCC package was applied to sequence control system with inputs and outputs of 256 points. The designed processor for the sequence logic was compared with the control system using the DSP(TM320C32-40MHz) and conventional PLC system. The designed processor for the sequence logic showed good performance.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.23
no.12
/
pp.224-232
/
2009
Power plant start-up is a complicate process involving hundreds of operations that should be performed either automatically or manually. Several major operations should be proceeded in parallel and each major operation is again broken down into detailed operations that must be carried out in a strict sequence. Even though most of the operations are automated, still substantial portions of the operations are carried out manually and the operational status should be monitored by the crew members, which are quite stressful tasks to be performed in real time. In this paper, a data structure called an Event Sequence Monitoring Graph(ESMG) is proposed for monitoring a sequence of events involved in the power plant start-up process. The ESMG is currently being applied to a thermal power plant with a rated output of 500MW. An application example is shown with the boiler feed water pump system start-up process, which exhibits a good potential for future applications.
Journal of the Korean Society for Precision Engineering
/
v.16
no.5
s.98
/
pp.29-39
/
1999
Many industrial products can be assembled in various sequences of assembly operations. To save time and cost in assembly process and to increase the quality of products, it is very important to choose an optimal assembly sequence. In this paper, we propose a methodology that generates an optimal assembly sequence by using the knowledge of experts. First, a product is divided into several sub-assemblies. Next, the disassembly sequences of sub-assembly are generated using disassembly rules and special information can be extracted through the disassembly process. By combining every assembly sequence of sub-assemblies, we can generate all the possible assembly sequences of a product. Finally, the expert system evaluates all the possible assembly sequences and finds an optimal assembly sequence. It can be achieved under consideration of the parameters such as assembly operation, tool change, safety of part. basepart location, setup change, distance, and orientation. The developed system is applied to UBR(Unit Bath Room) example.
Pavlov, V.;Baystrukov, K.;Golobokov, Yu.;Ovchinnikov, A.;Mezentsev, A.;Merkulov, S.;Lee, A.;Tazhibayeva, I.;Shapovalov, G.
Nuclear Engineering and Technology
/
v.46
no.5
/
pp.667-674
/
2014
One of the largest problems for tokamak devices such as Kazakhstan Tokamak for Material Testing (KTM) is the operation scenarios' development and execution. Operation scenarios may be varied often, so a convenient hardware and software solution is required for scenario management and execution. Dozens of diagnostic and control subsystems with numerous configuration settings may be used in an experiment, so it is required to automate the subsystem configuration process to coordinate changes of the related settings and to prevent errors. Most of the diagnostic and control subsystems software at KTM was unified using an extra software layer, describing the hardware abstraction interface. The experiment sequence was described using a command language. The whole infrastructure was brought together by a universal communication protocol supporting various media, including Ethernet and serial links. The operation sequence execution infrastructure was used at KTM to carry out plasma experiments.
The Transactions of The Korean Institute of Electrical Engineers
/
v.60
no.4
/
pp.830-837
/
2011
A turbine control system which has been operated for years in a nuclear power plant was retrofitted with a newly developed digital control system. After completion of the retrofit, turbine valve tests were performed to ensure the integrity of each valve's control function. The sequence of each valve test is composed of a closing process and a reopening process. To minimize megawatt variation which normally occurs during the test sequence, we employed a kind of compensator algorithm in the new digital control system which also have been used in the old system. There were difficulties finding optimal parameter settings for our new compensator algorithm because the power plant didn't allow us to perform necessary tuning procedures while the turbine is on load operation. Therefore an alternative measure for the compensator tuning which is independent of the turbine actual operation had to be implemented. So, a process model for the test was required to overcome this situation. We analyzed the operation data of the test and implemented the process model by use of input and output variable relations. Also we verified the process model by use of another condition's operating data. The result shows that the output of model is similar to the actual operation data.
Remarshalling operation is one of the operations considered important in an automated container terminal to perform quickly loading operations and delivery operations. It arranges the containers scattered at a verticla yard block in order to reduce the transfer time and the rehandling time of ATC(Automated Transfer Crane)s. This paper deals with the remarshalling planning problem minimizing the weighted operation time. This problem can be decomposed into 2 subproblems, storage space assignment problem and operation sequencing problem Storage space assignment problem decides to where containers are transported in terms of transportation time cost.. With results of a previous subproblem, operation sequence problem determines the ATC operation sequence, which minimizes the dead-heading of ATC This study formulates each subproblem with mixed integer program and dynamic program. To illustrate the proposed model, we propose an instance to explain the process of remarshalling planning.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.