• Title/Summary/Keyword: Operation Problem

Search Result 3,648, Processing Time 0.037 seconds

A Study on the Optimal Position of Lightning Arrester on Joint Operation of Neutral Wire and Overhead Grounding Wire through Lightning Surge Analysis in Combined Distribution System (혼합배전계통에서 뇌과전압 해석을 통한 중성선과 가공지선 혼용 운전시 적정 피뢰기 위치에 관한 연구)

  • Jeong, Seok-San;Jang, Hwa-Youn;An, Chun-Yong;Lee, Jong-Beom
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.535-536
    • /
    • 2011
  • This paper studies the validity about a joint operation of neutral wire and overhead grounding wire in combined distribution systems. The overhead grounding wire and neutral wire are currently installed separately and grounded by common. However there is no any ineffectiveness or electrical problem in case of the proposed system, such system can be operated at real distribution system. Therefore this paper describes the suitability of a joint operation through lightning surge analysis on combined distribution systems and analyzes the optimal position of lightning arrester on joint operation of neutral wire and overhead grounding wire. Lightning surge analysis is carried out by EMTP/ATPDraw to obtain the overvoltage of overhead line and underground cable in various conditions such as location and current types of lightning stroke. Over voltage gained by the analysis show that the insulation strength of the joint operation case is not stable compare with the current operation case.

  • PDF

Study on Multi-scale Unit Commitment Optimization in the Wind-Coal Intensive Power System

  • Ye, Xi;Qiao, Ying;Lu, Zongxiang;Min, Yong;Wang, Ningbo
    • Journal of Electrical Engineering and Technology
    • /
    • v.8 no.6
    • /
    • pp.1596-1604
    • /
    • 2013
  • Coordinating operation between large-scale wind power and thermal units in multiple time scale is an important problem to keep power balance, especially for the power grids mainly made up of large coal-fired units. The paper proposes a novel operation mode of multi-scale unit commitment (abbr. UC) that includes mid-term UC and day-ahead UC, which can take full advantage of insufficient flexibility and improve wind power accommodation. First, we introduce the concepts of multi-scale UC and then illustrate the benefits of introducing mid-term UC to the wind-coal intensive grid. The paper then formulates the mid-term UC model, proposes operation performance indices and validates the optimal operation mode by simulation cases. Compared with day-ahead UC only, the multi-scale UC mode could reduce the total generation cost and improve the wind power net benefit by decreasing the coal-fired units' on/off operation. The simulation results also show that the maximum total generation benefit should be pursued rather than the wind power utilization rate in wind-coal intensive system.

Parallel Operation of Three-Phase Four wire UPS using Droop Control (Droop Control을 이용한 3상 4선식 UPS의 병렬운전)

  • Kim, Hyunseob;Han, Jungho;Song, Joong-Ho
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.27 no.4
    • /
    • pp.88-95
    • /
    • 2013
  • A new droop control method which can be applied to 3-phase 4-wire uninterruptible power supply is proposed in this paper. The droop control method for parallel operation is very attractive one as UPS parallel operation can be carried out without any data communication devices provided among UPS systems connected, but it reportedly shows a PnP(plug-and-play) problem. A basic reason why a circulating current could flow among parallel-connected UPS systems is clearly investigated as well when droop-controlled-ups systems are operated in the manner of PnP. The proposed algorithm is deduced from the investigated result and is basically structured to keep a balanced frequency and balanced voltage profile against power variation. This paper shows that balanced parallel operation of droop control method can be obtained under unbalanced load as well as balanced load conditions when PnP operation is needed and load change occurs.

Optimum Allocation Model of Military Engineer Equipments for Artillery Position Development (포병진지 구축을 위한 공병장비 최적배정 모형)

  • Jang, Young Cho;Lee, Moon Gul
    • Korean Management Science Review
    • /
    • v.34 no.2
    • /
    • pp.103-113
    • /
    • 2017
  • The artillery is a key element of the ground forces operation during wartime, and the military engineers support the artillery position development operation to support the smooth operation of the artillery. In establishing the artillery position development operation plan, the commander requires more than his intuition to find the best option reflecting a number of elements of the battlefield situation which changes every minute. Moreover, the number of available equipment is smaller than the number of required position developments, and the effective equipment operation becomes essential element of this issue. This study quantified the capability of the available engineering equipment, organized a number of teams enabling equipment to put out the maximum capacity based on the quantified figures, and formed the model which allocates the team to the developing points to minimize the developing time. The goal programming method was applied to resolve the problem. The developed model was applied to compare the total mission duration following the number of teams, the variable for commander's decision, and the result of this study can be used as the quantitative data for commander's decision making process in establishing the artillery position development support operation through effective equipment management.

A study on the Optimal Economic Vessel in the South-East Asian Trade Route (동남아 항로의 최적 경제선박에 관한 연구)

  • Lee, Dong-Gon
    • 한국기계연구소 소보
    • /
    • s.14
    • /
    • pp.145-155
    • /
    • 1985
  • The recent trend in shipbuilding technology is toward development of highly economical vessels of which construction and operation costs are minimized, whereas cargo transport capacity is maximized. But, most of the vessel which are now operated by some of the nation's shipping companies are uneconomical ones built before oil crisis and consequently the companies are suffering from long-lasted deficit problem. In this paper, derivation study of optimum vessel for multi purpose cargo vessel on south-East Asian trade route is carried out to solve this problem. The Required Freight Rate is used as a measure of merits.

  • PDF

Production Scheduling using Overtime (잔업을 고려한 생산 스케쥴링)

  • 민병도;임석철
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.20 no.44
    • /
    • pp.197-205
    • /
    • 1997
  • Manufacturers can meet the due dates of orders by using overtime, in which case, additional cost incurs for the amount of overtime. Although many studies have been reported on scheduling, only a few papers are founds on production scheduling using overtime. We consider the problem of production scheduling using overtime on a single machine, in which each job has a given due-date, a constant processing time. We assume that the daily overtime does not exceed the daily regular operation time. The objectives is to minimize the total overtimes, while meeting all due dates. We first present a mathematical model, and then suggest a heuristic algorithm for the problem.

  • PDF

English-to-Korean Machine Translation and the Problem of Anaphora Resolution (영한기계번역과 대용어 조응문제에 대한 고찰)

  • Ruslan Mitkov
    • Proceedings of the Acoustical Society of Korea Conference
    • /
    • 1994.06c
    • /
    • pp.351-357
    • /
    • 1994
  • At least two projects for English-to-Korean translation have been already in action for the last few years, but so far no attention has been paid to the problem of resolving pronominal reference and a default pronoun translation has been considered instead. In this paper we argue that pronous cannot be handled trivially in an English-to-Korean translation and one cannot bypass the task of resolving anaphoric reference if aiming at good and natural translation. In addition, we propose lexical transfer rules for English-to-Korean anaphor translation and outline an anaphora resolution model for an English-to-Korean MT system in operation.

  • PDF

A Mixed 0-1 Linear Program for the Inspection Location Problem

  • Yum, Bong-Jin
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.10 no.1
    • /
    • pp.11-16
    • /
    • 1984
  • An economic model is developed for determining optimal locations of screening inspection stations in a multistage production system. The effect of screening inspection on the production rate is explicitly considered, and a fixed cost for maintaining an inspection station is assumed. The product is allowed to have multiple defects, each of which may be inspected at any inspection station after the defect-generating operation. The problem is formulated as a mixed 0-1 linear program which offers the advantage of versatility in handling various system constraints.

  • PDF

Design and Implementation of Questionnaire Creation System by Expert Collaboration

  • Park, Hee-Chang;Cho, Kwang-Hyun
    • Journal of the Korean Data and Information Science Society
    • /
    • v.18 no.1
    • /
    • pp.149-159
    • /
    • 2007
  • The main purpose of this paper is to develop a questionnaire creation system by expert co-operation on the web. The most difficult problem in a survey is to make questionnaires. To solve this problem, we suggest the questionnaire creation system which is to create questionnaire for survey by expert collaboration. We can create the best questionnaire because it can gather and exchange to questionnaire information from experts.

  • PDF

Multiobjective fuzzy control system using reinforcement learning

  • Oh, Kang-Dong;Bien Zeungnam
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2002.10a
    • /
    • pp.110.4-110
    • /
    • 2002
  • In practical control area, there are many examples with multiple objectives which may conflict or compete with each other like overhead crane control, automatic train operation, and refuse incinerator plant control, etc. These kinds of control problems are called multiobjective control problems, where it is difficult to provide the desired performance with control strategies based on single-objective optimization. Because the conventional control theories usually treat the control problem as the single objective optimization problem , the methods are not adequate to treat the multiobjective control problems. Particularly, in case of large scale systems or ill-defined systems, the multiple obj..

  • PDF