• Title/Summary/Keyword: Operation Planning for Performance Management

Search Result 119, Processing Time 0.024 seconds

Condition Parameter-based On-line Performance Reliability (상태 파라메터 기반의 온라인 성능 신뢰도)

  • Kim, Yon-Soo;Chung, Young-Bae
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.30 no.3
    • /
    • pp.103-108
    • /
    • 2007
  • This paper presents the conceptual framework for estimating and predicting system's susceptibility to failure as function of condition parameter value which is representing the current status of performance measure using on-line performance reliability. The performance of such system depends on one parameter with a probability distribution that degrades with time gracefully. Performance reliability represents the probability that physical performance will remain satisfactory over a finite period of time or usage cycles in the future. An empirical physical performance function is constructed to incorporate explanatory variables (operating and environmental conditions) over a time or usage dimension. This function enables one to model device performance and the associated classical reliability measures simultaneously, in the performance domain and time domain. The conditional performance reliability structure developed represents a tool to predict system performance over time or usage for next usage period. By enabling such a framework, it can bring us more efficient planning and execution in system's operation control as well as maintenance to reduce costs and/or increase profits.

A Case Study on Efficiency Evaluation of DMUs Performances for Digital Pioneer Project by Data Envelopment Analysis Model (DEA를 활용한 차세대첨단콘텐츠육성사업 참여 DMU의 효율성 평가에 관한 사례 연구)

  • Shin, Jae-Shig;Yang, Hae-Sool
    • Journal of Information Technology Services
    • /
    • v.6 no.1
    • /
    • pp.65-81
    • /
    • 2007
  • Recently, the affiliates of the Ministry of Information and Communication have been conducting a performance evaluation study on IT policy projects, based on the performance evaluation model of the U.S. Office of Management and Budgets, with regard to investment in computerization. The performance evaluation model for the policy project could provide the objective information required for the planning, development, and operation of the policy project. However, the performance of the most policy project is likely to be evaluated using the subjective evaluation criteria of evaluators. Therefore, this case study evaluates the relative efficiency using DEA (Data Envelopment Analysis) in order to improve the performance evaluation method of the digital pioneer' project implemented by the Korea IT Industry Promotion Agency. The improvement value of inefficient Decision Making Units (DMUs) was measured by a static efficiency analysis. The measured value will suggest a objective viewpoint of the performance between DMUs to evaluators. In doing so, it will show an appropriate direction for the policy project to be evaluated successfully.

A methodology for an effective utilization of construction equipment for highway construction projects (도로공사 공정계획을 위한 공정 로직 및 건설장비 효율화 방안)

  • Song, Hojeong;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.26-34
    • /
    • 2014
  • Highway construction is a combination of linear, repetitive, and highly equipment intensive operations. Various types of construction equipment are deployed to ensure undisrupted performance of construction, and thus productivity improvement and cost-saving can be achieved through well-thought-out planning. The selection of construction equipment is dependent upon construction sequence, site conditions, and construction methods. In the process of planning, management should consider various types of construction methods per each type of construction operation. Also, management should map out proper construction equipment operation plan that takes the construction duration and cost measures into consideration. However, limited availability of historic data from the similar types of operations has been a stumbling block to proper construction planning, making the operations performed based upon experience and intuition guided by rules-of-thumb. As a consequence, the planing phase rarely provided an adequate validity in the implementation phase. The researchers developed a process logic for each construction type that management can utilize from early phase of highway construction planning process. Moreover, derived the construction equipment combination optimized for efficiency by using the process simulation technique. The developed method is expected to be useful for the decision-making process that aims to evaluate efficiency of various process plans and to ensure optimal selection of construction equipment for highway construction projects.

A Study on the Development of the Data Linkage Method for Performance-based on Port Facility Maintenance Decision Marking System (성능기반의 항만시설물 유지관리 의사결정체계 개발을 위한 데이터 연계방안 도출에 관한 연구)

  • Kim, Yong-Hee;Kang, Yoon-Koo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.11
    • /
    • pp.9-18
    • /
    • 2020
  • Recently, studies of integrated management platform and performance-based maintenance decision-marking systems have proceeded to the efficient management of port facilities. The purpose of this study was to manage and operate port facilities based on performance and to provide long-term durability and budgetary execution. Thus, it is essential to secure basic data to be analyzed in an integrated platform and decision-marking system. This study derived the data linkage measures to secure port facility design and management information. The target of deriving the data linkage was the POMS (Port Facility Management System) currently in operation by the MOF (Ministry of Oceans and Fisheries). To derive data linkage, analyze the database of POMS and select the data required for the operation-integrated platform and decision-marking system. The final data linkage target was determined by compiling the requirements of the relevant experts and selecting the final target of three groups (port and facility information, management information, and user information). As a result, the API interface design was prepared for detailed linked data and data linkage framework between the linkage data of POMS. The provision of real-time data linkage between POMS and integrated platform is expected to improve the operational efficiency of the integrated platform.

A Prototype of Distributed Simulation for Facility Restoration Operation Analysis through Incorporation of Immediate Damage Assessment

  • Hwang, Sungjoo;Choi, MinJi;Starbuck, Richmond;Lee, SangHyun;Park, Moonseo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.339-343
    • /
    • 2015
  • To rapidly recover ceased functionality of a facility after a catastrophic seismic event, critical decisions on facility repair works are made within a limited period of time. However, prolonged damage assessment of facilities, due to massive damage in the surrounding region and the complicated damage judgment procedures, may impede restoration planning. To assist reliable structural damage estimation without a deep knowledge and rapid interactive analysis among facility damage and restoration operations during the approximate restoration project planning phase, we developed a prototype of distributed facility restoration simulations through the use of high-level architecture (HLA) (IEEE 1516). The simulation prototype, in which three different simulations (including a seismic data retrieval technique, a structural response simulator, and a restoration simulation module) interact with each other, enables immediate damage estimation by promptly detecting earthquake intensity and the restoration operation analysis according to estimated damage. By conducting case simulations and experiments, research outcomes provide key insights into post-disaster restoration planning, including the extent to which facility damage varies according to disaster severity, facility location, and structures. Additional insights arise regarding the extent to which different facility damage patterns impact a project's performance, especially when facility damage is hard to estimate by observation. In particular, an understanding of required type and amount of repair activities (e.g., demolition works, structural reinforcement, frame installation, or finishing works) is expected to support project managers in approximate work scheduling or resource procurement plans.

  • PDF

Role and Task of Nurses in the Visiting Health Services at the Public Health Center: Focusing on the Elderly (노인대상 보건소 방문건강관리사업 간호사의 역할과 직무)

  • Han, Young Ran;Park, Eun A;Bang, Mi Ran;An, Na Won
    • Journal of Korean Public Health Nursing
    • /
    • v.35 no.3
    • /
    • pp.430-447
    • /
    • 2021
  • Purpose: The purpose of this study was to analyze the role and tasks of nurses who were working for the elderly in the visiting health services at the public health centers. Methods: Literature reviews, two rounds of meetings with 5 experts and a two-round Delphi technique with 15 experts were performed in this study. Results: The nurses' role and job analysis revealed 5 roles, 16 duties and, 71 tasks. The nurses' roles, including discovery and registration of households/groups in visiting health service in the community, case manager, administrative management, program planning, operation and evaluation, and development of job competency. Sixteen duties included client registration and management, need assessment and plan establishment, education, consultation and support, seasonal health care, prevention and monitoring of infectious diseases, basic nursing care, chronic disease management, linkage and utilization of resources, team cooperation and coordination, home environment management, monitoring and support for intervention outcomes, evaluation, administrative management, program planning, operation and evaluation, development of professional competency and, adoption of fourth industrial revolution technology. Conclusions: Based on the results, the government should provide sufficient nursing personnel to provide universal preventive health services for the elderly and a job training program to perform these roles well.

On the Implementation of Route Planning Algorithms on the Electronic Chart System (전자해도 상의 항해계획 알고리듬 구현에 관한 연구)

  • 위승민;김시화;장일동
    • Journal of the Korean Institute of Navigation
    • /
    • v.24 no.3
    • /
    • pp.167-176
    • /
    • 2000
  • The -advent of electronic navigation equipment and trustworthy computer which provides people with convenience made the management system by one-man bridge operation or the least people who are needed possible through the integration of communication network with various navigation equipment and related institution. One of the most needed ultra-modem navigation device for a mate, ECDIS is a core equipment for navigation in ENS that notifies peril to mate as well as supervises all tasks in hydrographical chart, voyage planning, course monitoring and voyage recording. We should make coast and ocean voyage planning first, for the secure navigation which is considering the course circumstances and next, for the reduction of voyage dates in economical aspect. There needs a thoughtful consideration about the feature of the ship itself and the course with weather condition in taking up the course and also we have to take into accounts about appropriate distance between ships. Considering the essential conditions of ECDIS the indispensable device in the future, it was developed the basic principle for voyage planning algorithm for officer and programmed to real implementation available. In this paper including most of the requirements in ECDIS performance standard I mentioned about such a basic and a core Principle with real application by using the Visual C++ programming language. The voyage plan includes the function that indicate and modifies all the way points in the course from department port to arrival port with erasing the wrong way points. Also, it provides in a document form that shows ETA at glance in average speed sailing.

  • PDF

Looking One Year Back at the Work of the Science Chief Teachers in Elementary Schools: Focus on Planning, Implementation, Management, and Supplementation (초등학교 교사들의 과학부장 업무 1년 돌아보기 - 계획·실행과 관리·보충의 관점을 중심으로 -)

  • Kim, Hyunguk
    • Journal of Korean Elementary Science Education
    • /
    • v.43 no.3
    • /
    • pp.402-414
    • /
    • 2024
  • The purpose of this study is to explore the experiences of Science Chief Teachers in schools, focusing on the specific activities in which they engage during the school year as a part of the science curriculum in the school. To do so, five research participants were selected who were in charge of the activities of the Science Chief Teacher in elementary schools. After the interviews, their activities and roles were categorized into "planning and implementation" and "management and supplementation." In addition, the research participants were asked to bring documents they had drafted and provide information about accomplishments related to science contests, lists of materials and equipment used in science labs, and other materials to be used as reference data for the research. As prompted by the research, the category of "planning and implementation," which represented the activities conducted by the Science Chief Teachers, was further classified into "operation of the intramural events for the Month of Science at the beginning of the school year," "participation in contests sponsored by the Office of Education in accordance with the results of the intramural events," " the operation of the science club in school," and "preparation for the end of the year evaluation of the science education performance." As for the category of "management and supplementation," it was further classified into "constant management and improvement of the science lab," "maintenance of the relationship with the public service officials present at science lab," and "management of other matters related to the science education." Through this study, it was possible to look into the activities of the Science Chief Teachers who supported the smooth progress of science education in schools. This study will provide implications for improving the work efficiency of the Chief Science Teachers and indicate the difficulties expected in the future.

A Methodology for Analysis of Supply Chain System using Reliability Theory (신뢰성 이론을 이용한 공급 사슬 시스템 분석에 관한 연구)

  • 조민관;이영해
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2001.10a
    • /
    • pp.257-260
    • /
    • 2001
  • The primary objective of Supply Chain Management (SCM) is to optimize the cash, material and information flow considering all components of Supply Chain (SC) . The plan, established for achieving such objective, is called Supply Chain Planning (SCP) . This SCP gives each SC component specific volume or operation task, should be done in specific due date, for optimizing SC. In detail, the degree of accomplishment for SCP, depends on the SCP achievement of each SC components, is very close to successful SCM. However, this achievement is affected by uncertainties about time and volume. In general, reliability concepts means the probability that a product or system will perform its specified function under prescribed conditions without failure for a specified period of time. Therefore, the concept of Supply Chain Reliability (SCR) and an analytic methodology to calculate the degree of achievement SCP using reliability concept are proposed in this paper. SCR means that the degree of achievement for SCP considering all SC components in due date. SCR can be used to measure the performance of whole supply chain and indicate the direction of SCP.

  • PDF

A Performance Measure for Supply Chain System using Reliability Theory (신뢰성 이론을 이용한 공급 사슬 시스템의 평가 척도에 관한 연구)

  • Cho Min Kwan;Lee Young Hae
    • Proceedings of the Society of Korea Industrial and System Engineering Conference
    • /
    • 2002.05a
    • /
    • pp.195-202
    • /
    • 2002
  • The primary objective of Supply Chain Management (SCM) is to optimize the cash, material and information flow for satisfying customer demands through coordinating the relationship between Supply Chain components such as suppliers, manufacturers, and inventories, etc. By Supply Chain Planning (SCP), operation tasks or goals, should be done in specific due date, are ordered to each SC component for achieving such objective. However, the achievement for operation tasks or goals is affected by uncertainties in SC. In general, reliability theory Is explained as the probability that a product or system will perform its specified function under prescribed conditions without failure for a specified period of time. Therefore, the reliability of SC can be defined as the probability that SC will satisfy customer demands until the specific due date. In this paper, a basic framework to evaluate reliability is respectively proposed as supply chain components, and then a overall framework to estimate the reliability for SC is also proposed.

  • PDF