• Title/Summary/Keyword: Operation Plan

Search Result 2,247, Processing Time 0.028 seconds

A Strategy of Technology Development for the Railway System based on Railway Network (철도망 구축을 고려한 철도시스템의 기술개발전략)

  • Lee Hi-Sung
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.3 s.34
    • /
    • pp.319-324
    • /
    • 2006
  • Studied was a strategy of technology development for railway system in terms of railway network. First, The successful launch of the Korean HST system has not only decreased logistics burden but also significantly transformed the Korean trunk-line railway network, revolutionizing the logistics and technology sectors and reinvigorating the Korean railway industry in one century. Korean railway industry sector is now investing to develop many different types of railway system(G7, Post G7, tilting train...) so that these kinds of various railway system development should be integrated with the National Inter-modal Transportation Network Plan. To secure sufficient capacity that is required by the National Railroad Plan, the railway industry needs to establish mid- and long-term train purchase and operation strategies in compliance with railway construction and operation policies. During a railway construction planning, train operators, based on their train operation strategies, should come up with measures to closely cooperate with project operators from the planning stage through to the opening of a railway system. To be more precise, train operators should establish long-term train procurement plans reflecting both long-term national railroad network plans and plans for each railway line in order to suggest appropriate roles and schedules for each line. Also, based on the long-term railway plan, directions should be decided concerning the research and development of trains in advance.

Application of A* Algorithm to solve a Cutting Problem in Metal Manufacturing Process (A* 알고리즘을 적용한 금속 그레이팅 생산 공정에서의 절단문제 해결)

  • Kim, Jin-Myoung;Cho, Tae-Ho
    • Journal of the Korea Society for Simulation
    • /
    • v.14 no.4
    • /
    • pp.1-8
    • /
    • 2005
  • In a metal grating manufacturing process, the cutting operation allocates the gratings and cut them out from given panels or a plate sheets. Before the cutting operation an operator generates a cutting plan. The cutting plan should decide how pieces of metal rectangles i.e., gratings, are allocated and cut from the panel. This plan generation is a deal of weight on the production cost. the generation of cutting plan is similar to the general two-dimensional cutting problem. In this paper, we first define cutting problem and Af algorithm of Artificial Intelligence to solve the problem. Also, through a simulation, we compare the proposed cutting algorithm to an existing method in terms of material loss

  • PDF

Train Regulation by the Advanced Algorithm for Subway (개선된 알고리즘에 의한 지하철 운행간격 제어)

  • Park, Hong-Kyu;Shim, Won-Sup;Hong, Soon-Heum
    • Proceedings of the KIEE Conference
    • /
    • 2002.11d
    • /
    • pp.330-333
    • /
    • 2002
  • Even if the train of subway starts in a certain interval from the origin according to the operation plan. as the number of passenger gets increased during operation. the boarding and getting-off time will increase, and the temporary breakdown happens to the system of train during operation, causing the delay from the operation plan. this leads to the vicious circle of train operation. making the interval of train operation irregular in downtown especially. To solve this problem, we propose the method of advanced algorithm by the actual data relating to the train operation including operation time required between stations, distance between stations. capability of train, and the dwelling time, location and distance between the preceding train and next one. The central train control system adjusts the dwelling time at each station in order to recover the delayed time, and increase the operation speed at the each station. As control algorithm is applied the dwelling time and to increase the speed, the train maintains certain interval after certain amount of time passes.

  • PDF

Ballasting plan optimization for operation of a 2D floating dry dock

  • Yoon, Kyungho;Kim, Hyo-Jin;Yeo, Seungkyun;Hong, Younghwa;Cha, Jihye;Chung, Hyun
    • Structural Engineering and Mechanics
    • /
    • v.74 no.4
    • /
    • pp.521-532
    • /
    • 2020
  • A floating dry dock is an advanced structure that can provide a solution for dry dock space shortages. The critical point in floating dock operation is compensating the deflection caused by a heavy payload by adjusting the water level in the ballast system. An appropriate ballasting plan warrants safe and precise construction on a floating dock. Particularly, in the case of a 2D floating dock, ballasting plan evaluation is crucial due to complex deformation modes. In this paper, we developed a method to calculate the optimal ballasting plan for accurate and precise construction on a 2D floating dock. The finite element method was used for considering the flexibility of the floating dock as well as the construction blocks. Through a gradient-based optimization algorithm, the optimal ballasting plan for the given load condition was calculated in semi-real time (5 min). The present method was successfully used for the actual construction of an offshore structure on the 2D floating dock.

Wheel/Rail Interaction and Organizational Design (차륜/레일 상호작용과 조직설계)

  • Bhang Youn-keun;Lee Heon-seok
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.1281-1286
    • /
    • 2005
  • This study shows organizational designs to increase the coordination between infrastructure and rolling stock operation organizations after rail reform based on wheel/rail interface and train/track interaction. Information sharing, face-to-face meeting, liaison role, task force, manager responsible for coordination, and team organization could help to coordinate infrastructure construction plan and train operation plan. It is necessary for the organizations to begin to study the interaction between track and train in Korean environments to make the coordination more efficient.

  • PDF

A Study of the Improvement of Train Diagram with KTX Operation (고속철도 개통효과를 최대화하기 위한 열차체계 개선방안)

  • 도도로키히로시
    • Proceedings of the KSR Conference
    • /
    • 2002.05a
    • /
    • pp.106-110
    • /
    • 2002
  • The KTX, first Korean Highspeed train from Seoul to Busan, is scheduled to begin its passenger service in 2004, with improvement of existing railroad between Daegu and Busan and Honam region. This paper aims to suggest the best train operation plan and detailed diagram pattern so that the KTX could work effectively as much as possible. I suggest for instance, connecting direct train and local train, hub stations plan, multi-destination train, and improvement of fare system.

  • PDF

A Study on Improving Management & Operation of TMC (ITS 교통관리센터 운영관리 방안 연구)

  • Kim Seung-Il;Kim Young-Chan;Ryu Seung-Ki
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.4 no.1 s.6
    • /
    • pp.31-41
    • /
    • 2005
  • Currently many Traffic Management Centers(TMC) have been constructed, there are in the process of operating and propelling. Although many TMC are constructed up to now, we have no discussion about positive operation plan and no many studies. We consider that the center should foster many experts for a qualitative development. So we provides to analysis internal and external operation system of UC and to Present the solution about a problem of government subject and an adequate scale of operation system. Also we Present a drawing up plan about regular and occasional educational plan and operation manual for activating the educational system. We suggest that many TMC and government should pay attention to those issues and invest money in operation issues and researches.

  • PDF

A Study of the Client′s Importance Perception on the Factors Affecting the Foodservice Management Contract (위탁급식 업체선정에 영향 미치는 요인에 대한 고객사의 중요도 인식 조사)

  • 김현아;양일선;이보숙;박진영
    • Journal of Nutrition and Health
    • /
    • v.37 no.5
    • /
    • pp.406-414
    • /
    • 2004
  • The purposes of this study were 1) to investigate the importance level on factors affecting the foodservice management contract perceived by the clients in the office building, government and public offices and manufacturing company in Seoul and Kyungi 2) to compare the perceived importance levels of the present contract and future contract 3) to compare the perceived importance levels of the competitive bid with those of the private contract. To collect the data on the perceived importance level on the affecting the foodservice management contract, the questionnaires were developed by the delphi technique and modified by the pilot test. The questionnaires consisted of 4 categories and 19 items on the factors affecting the foodservice management contract and the importance level on the factors were measured by 5-likert scale. From March 12 to April 13 in 2003, the self-administrative questionnaires were mailed to 280 clients. The questionnaires were responded from the 50 clients (respondent rate: 25%). On the factors affecting the present contract and the future contract, among the 4 categories (the appropriateness of foodservice operation plan, the evaluation of the foodservice company, sales ability, the conditions of the cost in the contract), the importance level of the appropriateness of foodservice operation plan was higher than those of the other categories. In the comparison of the perceived importance level between the present contract and the future contract, the importance level of 4 items (sanitation and safety management plan, menu management plan, service management plan, food cost per meal) in the future contract were significantly higher than those in the present contract (p<.01, p<.05, p<.05, p<.01). There were the significant differences between the private contract and competitive bid on the factors affecting the present contract in the 3 items, which were $\ulcorner$renewal plan for interior and environment$\lrcorner$, $\ulcorner$strategic alliance with the contractor$\lrcorner$, $\ulcorner$lobby of the foodservice company$\lrcorner$ (p<.05, p<.05, p<.05). And on the factors affecting the future contract, there were significant differences in the 2 items, which were $\ulcorner$renewal plan for interior and environment$\lrcorner$and $\ulcorner$cost per meal$\lrcorner$in comparing the competitive bid and private contract (p<.05, p<.01). The clients perceived the appropriateness of foodservice operation plan was more important than the other categories in the future foodservice management contract. It was proposed that the foodservice management contract company should focus on the foodservice operation to satisfy the customers and clients in order to get more contract in the future.

Study on Operational Plan of Hot Gas Parts for Cost Reduction of Gas Turbine with Cases Oriented (가스터빈의 운전유지비 절감을 위한 고온부품의 운영방안에 관한 연구 - 사례중심으로 -)

  • Yu, Won-Ju;Cho, Chi-Woon
    • Journal of the Korea Safety Management & Science
    • /
    • v.11 no.1
    • /
    • pp.93-101
    • /
    • 2009
  • The use of the gas turbine for power supply is increasing recently. Accordingly, the operation and maintenance cost of the gas turbine is gradually increasing and the various efforts to cut the cost are needed. For an operation and maintenance cost saving of the gas turbine, reductions of the new purchasing charge and the reproduction repair cost of the hot gas parts are required through more effective operation and life management methods for the hot gas parts. The hot gas parts are the main parts of the gas turbine and they are replaced with the periodic. In this research, efficient operation and life management methods for the hot gas parts were presented with the cases. The methods were analyzed and verified based on real data and the cases for improving a lifetime were utilized in the field.

A STUDY ON SPACE ZONING BY COMPUTING IDLE-TIMES IN CONSTRUCTION PROCESSES

  • Sang-Min Park;Won-Suk Jang;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.509-512
    • /
    • 2013
  • An inappropriate space zoning plan causes the unnecessary transportation of construction material and equipment among work areas and increases the disorder of work space. Space zoning is an essential operation management technique which contributes to reduce the process and/or operation idle-time. This paper introduces a method that computes the idle-times between construction operations (or processes) by using Web-CYCLONE. It allows computing with idle-times that affect the construction productivity. Using the idle time between operations and between processes, it computes the optimal number of zones and finds the optimal combination of zones that minimize the idle times. The method contributes to minimize the idle times relative to the operation schedule using complete enumeration. This paper presents the system prototype in detail. A case study is presented to demonstrate the system and verifies the validity of the model. It allows a project manager to establish space zoning plan that effectively segregates a project into optimal number of construction zones and to assign the constrained resources (e.g., laborer, equipment).

  • PDF