Chang-Yong Yi;Chan-Sik Park;Doo-Jin Lee;Dong-Eun Lee
국제학술발표논문집
/
The 3th International Conference on Construction Engineering and Project Management
/
pp.400-408
/
2009
Simulation applications for analyzing the productivity of construction operations at operation level and project schedules at project level are crucial methods in project management. The application at two different levels should be very tightly linked to each other in practice. However, appropriate integration at the levels is not achieved in that existing systems do not support to integrate operation models into a schedule model. This paper presents a new approach named to Discrete Event Simulation-Nesting modeling approach, which supports not only productivity analysis at operation level but also schedule management at a project level. The system developed by the authors allows creating operation models at the operation level, maintaining them in operation model library, executing sensitivity analysis to find the behaviors of the operation models when different combination of resources are used as existing DES systems do. On top of the conventional functions, the new system facilitates to find the optimum solution of resource combinations which satisfy the user's interest by computing the hourly productivity and the hourly cost of the operation. By drag-and-dropping an operation model kept in the operation model library, the operation models are integrated into an activity of the schedule model. When a complete schedule model is established by nesting operation models into the schedule model, stochastic simulation based scheduling is executed. A case study is presented to demonstrate the new simulation system and verify the validity of the system.
This paper discusses the development of a generic train operation model from a set of Korean Urban Transit Regulations such as Regulation for Train Operation of Urban Transit, Regulation for Safety Requirements of Urban Transit and so on. It is to communicate with various stakeholders on urban transit system, and to elicit copious requirements in performance of the urban transit train operation based on the model.
Recently, researches on IT Service Management (ITSM) for improving information system operation service and information system outsourcing cost estimation model are proliferating. This study suggests a new cost model of IT operation service and optimizing method based upon the characteristics of operation service as a long-term and continuous business service for both user's and service provider's point of view. This study explains the cost optimization model of IT operation service by improving service request management process, such as adequate reception and control, proper valuation, process management using project management methodology, effective organization and time management of service personnel. Especially in this study, service ability improvement effect and fixed operation cost reduction effect are defined to prove the proposed new cost model.
Facility location planning (FLP) problem is the strategic level planning in supply chain. The FLP is significantly affected by the operation time of each facility. In most of the FLP researches, operation time of facility has been treated as a fixed value. However, the operation time is not a static factor in real situations and the fixed operation time may lead unrealistic FLP. In this paper, a mixed integer programming (MIP) model is proposed for solving the 3-stage FLP problem and operation times are adjusted by the results from the simulation model and an iterative approach combining the analytic model and simulation model is proposed to obtain more realistic operation plans for FLP problems.
Consideration for parallel operation in a high power system has been increased due to the advantages of parallel operation like as high productivity, simplicity of design, and redundancy of power. This paper discussed the parallel operation of DC-DC Converter, Which Can be used as a high power system, is studied. Based on the small signal model of DC-DC Converter, the simple and exact power stage model of parallel operation system is derived and the parallel operation system using current balance method for the uniform current distribution among the parallel operation system is discussed. To verify the high performance of the proposed DC-DC converter system for parallel operation, the simulation test of the parallel operation, which has 2 Converter modules, is accomplished.
The objectives of this study were to explore the duties and tasks of educational program operation, to develop the performance model including the duties and tasks, and to construct the action manual of the tasks and duties in related with implementing effectively the educational program. The findings of this study were as follows. First, The identifying duties and tasks was 1,942 related with implementing educational program operation based on theoretical job model through activity analysis and experience sampling techniques. Second, the finding duties and tasks was reconstructed through classifying with 9 duties and 88 tasks, and then it was developed as educational program operation model of Korean Rural HRD Center. Finally Third, the implementing manual was constructed including the contents and task-elements.
This research is intended to integrate long-term operation rules and real time operation policy for conservation & flood control in a reservoir. The familiar Yield model has been modified and used to provide long-term rule curves. The model employs linear programming technique under given physical conditions, i.e., total capacity, dead storage, spillways, outlet capacity and their respective elevations to find required and desired minimum storage fur different demands. To investigate the system behavior resulting from the above-mentioned operating policy, i.e., the rule curves, the simulation model was used. Results of the simulation model show that the results of the optimization model are indeed valid. After confirmation of the above mentioned rule curves by the simulation models, gate operation procedure was merged with the long term operation rules to determine the optimum reservoir operating policy. In the gate operation procedure, operating policy in downstream flood plain, i.e., determination of damaging and non-damaging discharges in flood plain, peak floods, which could be routed by reservoir, are determined. Also outflow hydrograph and variations of water surface levels for two known hydrographs are determined. To examine efficiency of the above-mentioned models and their ability in determining the optimum operation policy, Esteghlal reservoir in Iran was analyzed as a case study. A numerical model fur the solution of two-dimensional dam break problems using fractional step method is developed on unstructured grid. The model is based on second-order Weighted Averaged Flux(WAF) scheme with HLLC approximate Riemann solver. To control the nonphysical oscillations associated with second-order accuracy, TVD scheme with SUPERBEE limiter is used. The developed model is verified by comparing the computational solutions with analytic solutions in idealized test cases. Very good agreements have been achieved in the verifications.
The study suggests a contract model of application operation through case study of A bank's IT outsourcing application contract based on workload. The IT outsourcing order form has a problem in that the scope of work is ambiguous due to the integration of operation and maintenance. In this study, application operation and maintenance were separated by referring to application operation history provided in ISO/IEC15504-5 standard. The scope of the IT outsourcing service was clarified by organizing the definition and detail activities of the application operation business. Application operation contract method has generally applied estimation method by the number of input manpower and period by agreement between buyer and client. As there is no activity to calculate the number of input manpower based on the operational work history and based on the standard workload per activity. In this case is not guaranteed due to the simple agreement between the contractors. In this paper, we propose an application operating cost estimation model that measures the size of the operating software using function point analysis that is the basis of application operation tasks. In order to verify the validity of the application operation cost model, we verified the correlation between the application size and the labor cost through regression analysis using SPSS.
This paper describes a split operation for generation of core and cavity plates of an injection mold for a pseudo-solid model of a plastic part. Here, a pseudo-solid model means a sheet model that looks like a solid model. but whose boundary is not closed. When a solid model created in a different CAD system is imported through standard data exchange format, a pseudo-solid model is created in most cases as tolerance or some other problems make sewing operation failed. As most existing mold design system based on solid modeling kernels require a complete part solid model, mold designers have to do time-consuming healing operations to convert a pseudo-solid to solid. The essential capability of mold design system is the split operation for generation of core and cavity plates. Thus. we developed a split operation for pseudo-solid part model to eliminate or reduce healing preprocessing for mold design.
IT 아웃소싱 운영의 효율적이고 품질 높은 서비스를 제공하기 위하여 정보시스템 운영 원칙을 세우고, 그 원칙을 통하여 운영관리가 이루어져야 한다. 따라서, 정보시스템 운영관리 프로세스를 참조한 정보시스템 운영관리 프로세스의 정립이 필요하다. 정보시스템 운영감리는 구축 개발 감리와는 다르게 일회성이 아닌 매주기별로 지속적인 감리가 필요함으로 운영관리 프로세스의 변화에 따라 운영감리 지침도 보완이 이루어져야 한다. 이에 본 논문에서는 IT아웃소싱 운영을 위한 정보시스템 운영감리 모형을 제안하였다. IT서비스 영역을 참조하여 계획, 전략, 계약, 서비스, 관리 등 IT아웃소싱 운영관리를 위한 정보시스템 운영감리 모형 및 점검항목을 제안하였으며, 도출된 감리모형 및 점검항목은 전문가들의 설문조사를 통하여 제안한 모형의 적합성을 검증하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.