• 제목/요약/키워드: Operation & Maintenance

검색결과 2,115건 처리시간 0.034초

주기적인 예방보전정책의 베이즈 접근방법 (A Bayesian Approach to Periodic Preventive Maintenance Policy)

  • 한성실;정기문;권영섭
    • 품질경영학회지
    • /
    • 제29권3호
    • /
    • pp.39-48
    • /
    • 2001
  • Preventive maintenance(PM) is an action taken on a repairable system while it is still operating, which needs to be carried out in order to keep the system at the desired level of successful operation. In this paper, we consider a Bayesian approach to determine an optimal periodic preventive maintenance policy. When the failure time is Weibull distribution with uncertain parameters, a Bayesian approach is established. Some numerical examples are presented for illustrative purpose.

  • PDF

Burn-in When Repair Costs Vary With Time

  • Na, Myung-Hwan;Lee, Sangyeol
    • 품질경영학회지
    • /
    • 제31권1호
    • /
    • pp.142-147
    • /
    • 2003
  • Burn-in is a widely used method to eliminate the initial failures. Preventive maintenance policy such as block replacement with minimal repair at failure is often used in field operation. In this, paper burn-in and maintenance policy are taken into consideration at the same time. The cost of a minimal repair is assumed to be a non-decreasing function of its age. The problems of determining optimal burn-in times and optimal maintenance policy are considered.

원전 주요기기의 예방정비 현황 및 연구 동향 (Present State and Tendency of the Preventive Maintenance for Major Components in Nuclear Power Plants)

  • 박성근
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2008년도 춘계학술대회논문집
    • /
    • pp.407-412
    • /
    • 2008
  • 원자력발전소의 안전성 확보를 위해서, 설비의 유지 관리 기법은 고장이 발생했을 때 조치하는 고장정비에서부터 고장을 미연에 방지하기 위한 예방정비, 예측정비 그리고 상태기반정비로 진행되어 가고 있다. 국내 원자력발전소에서는 고장정비와 예방 정비가 적용되고 있으며, 예측정비와 상태기반정비에 대한 연구가 수행되고 있다. 본 논문에서는 모터구동밸브, 공기구동밸브, 역지밸브 그리고 펌프에 대한 예방정비 현황과 기술 개발 동향에 대해 살펴보았다.

  • PDF

RCM 치명도 분석을 통한 유지보수 개선 절차 (Procedure for Maintenance Improvement by RCM Criticality Analysis)

  • 이창환;송미옥;박병노;이정모
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.2209-2214
    • /
    • 2010
  • The purpose of Reliability Centered Maintenance(Hereafter, RCM) is to enhance the effectiveness and efficiency of preventive maintenance by applying the improvement plan after analysis of existing preventive maintenance. To accomplish this, it is required to collect the failure data for equipments during operation, and to carry out the quantitative criticality analysis for each equipment. This paper shows that the case study of RCM criticality analysis based on the accumulative failure data and following improvement activity for KORAIL AIRPORT RAILROAD's E&M system.

  • PDF

Today's Nuclear Challenge: Maintenance and Radiation Exposure

  • Willis, Chales A.
    • Nuclear Engineering and Technology
    • /
    • 제7권2호
    • /
    • pp.159-165
    • /
    • 1975
  • The Nuclear power industry today faces a serious and rapidly emerging problem in reactor maintenance and occupational radiation exposure control. The basic problem is the need for much maintenance on nuclear power plants. The problem is seriously compounded by radiation exposure control requirements. Many studies are underway seeking solutions tut the industry is developing rapidly and new plants will not await the results of such studies. It is essential that attention be given to maintenance and exposure control in all phases of plant design, construction and operation.

  • PDF

Development of the Maintenance Process Using Virtual Prototyping for the Equipment in the MSM's Unreachable Area of the Hot cell

  • Lee, Jong-Youl;Song, Tai-Gil;Kim, Sung-Hyun;Yoon, Ji-Sup
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2003년도 ICCAS
    • /
    • pp.1354-1358
    • /
    • 2003
  • The process equipment for handling high level radioactive materials like spent fuels is operated in a hot cell, due to high radioactivity. Thus, this equipment should be maintained and repaired optimally by a remotely operated manipulator. The master-slave manipulators(MSM) are widely used as a remote handling device in the hot cell. The equipment in the hot cell should be optimally placed within the workspace of the wall-mounted slave manipulator for the maintenance operation. But, because of the complexity in the hot cell, there would be some parts of the equipment that are not reached by the MSM. In this study, the maintenance process for these parts of the equipment is developed using virtual prototyping technology. To analyze the workspace of the maintenance device in the hot cell and to develop the maintenance processes for the process equipment, the virtual mock-up of the hot cell for the spent fuel handling process is implemented using IGRIP. For the implementation of the virtual mock-up, the parts of the equipment and maintenance devices such as the MSM and servo manipulator are modeled and assembled in 3-D graphics, and the appropriate kinematics are assigned. Also, the virtual workcell of the spent fuel management process is implemented in the graphical environment, which is the same as the real environment. Using this mock-up, the workspace of the manipulators in the hot cell and the operator's view through the wall-mounted lead glass are analyzed. Also, for the dedicated maintenance operation, the analyses for the detailed area of the end effectors in accordance with the slave manipulator's position and orientation are carried out. The parts of the equipment that are located outside of the MSM's workspace are specified and the maintenance process of the parts using the servo manipulator that is mounted in the hot cell is proposed. To monitor the process in the hot cell remotely, the virtual display system by a virtual camera in the virtual work cell is also proposed. And the graphic simulation using a virtual mock-up is performed to verify the proposed maintenance process. The maintenance process proposed in this study can be effectively used in the real hot cell operation and the implemented virtual mock-up can be used for analyzing the various hot cell operations and enhancing the reliability and safety of the spent fuel management.

  • PDF

Graphic Simulator of Master/Slave Manipulator in Virtual Hot Cell

  • Kim, Sung-Hyun;Song, Tae-Gil;Lee, Jong-Yul;Yoon, Ji-Sup
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2002년도 ICCAS
    • /
    • pp.100.6-100
    • /
    • 2002
  • The crane and the master-slave manipulators (MSM) are widely used as a remote handling device in nuclear facilities such as the hot cell. The equipment to be installed in the hot cell should be optimally placed within the workspace of the wall-mounted slave manipulator for the maintenance operation. Also, the slave manipulator with the end effectors should be properly positioned and oriented for the dedicated maintenance operation. Hence, the workspace and the motion of the slave manipulator, as well as, the remote operation task should be analyzed before installing the manipulators and the hot cell equipment. For this purpose, the 3D graphic simulator, which simulates the remote operation o...

  • PDF

Development of Lifetime Assessment and Rehabilitation Cost Calculation Methods for Overseas ROMM Project

  • Hyun, Jung-Seob;Kim, Doo-Young;Hwang, Kwang-Won;Park, Min-Gyu
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제3권2호
    • /
    • pp.119-125
    • /
    • 2017
  • Regarding the implementation of ROMM project (Rehabilitation, Operation, Maintenance & Management), which is one of overseas development projects, it is very important to diagnose the exact current status of aged thermal power plant. However, when people visit the power plant for the purpose of prediagnosis to implement the ROMM project, most target power plants for diagnosis, in general, are under operation. This can be a big interference factor to diagnose the exact current status of power plants. Therefore, in order to solve such interference factor, based on the 30 years of know-how in the field, the present study has developed a regression curve for a simple life time assessment and the calculation of rehabilitation cost that may be used as a reference relatively for the quantitative diagnosis on the status of a relevant power plant even during the operation of the power plant.

가스터빈의 운전유지비 절감을 위한 고온부품의 운영방안에 관한 연구 - 사례중심으로 - (Study on Operational Plan of Hot Gas Parts for Cost Reduction of Gas Turbine with Cases Oriented)

  • 유원주;조지운
    • 대한안전경영과학회지
    • /
    • 제11권1호
    • /
    • pp.93-101
    • /
    • 2009
  • The use of the gas turbine for power supply is increasing recently. Accordingly, the operation and maintenance cost of the gas turbine is gradually increasing and the various efforts to cut the cost are needed. For an operation and maintenance cost saving of the gas turbine, reductions of the new purchasing charge and the reproduction repair cost of the hot gas parts are required through more effective operation and life management methods for the hot gas parts. The hot gas parts are the main parts of the gas turbine and they are replaced with the periodic. In this research, efficient operation and life management methods for the hot gas parts were presented with the cases. The methods were analyzed and verified based on real data and the cases for improving a lifetime were utilized in the field.

철도전기설비의 최적점검주기에 관한 기초연구 (Study on a Optimal Inspection Cycle of Electrical facility of Railroad)

  • 추철민;김재철;이희태;안재민;문종필
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2007년도 춘계학술대회 논문집
    • /
    • pp.224-228
    • /
    • 2007
  • It is focused on a methodology to establish a optimal inspection cycle of electrical facility of railroad Decision method of optimal inspection cycle is a process which establishes maintenance plan for facilities' immanent function as using reliability theory in operation term In order to ensure normal operation in a given condition, the decision method is logical for selecting effective maintenance plan to consider characteristic of system In estimation of failure rate, critical facility is selected firstly. After that, proper distribution function on each facility is decided to investigate distribution function for extraction of failure rate. Next, cost produced by the case that facility's failure is occurred is surveyed. Finally, maintenance method developed until now is investigated, before suitable model for the facility applying maintenance method is developed, and that maintenance decision is made. Therefore, this process is the method to find optimal inspection cycle for reasonable cost and effective reliability on facility.

  • PDF