Development of earthquake instrumentation for shutdown and restart criteria of the nuclear power plant using multivariable decision-making process

  • Hasan, Md M.;Mayaka, Joyce K.;Jung, Jae C.
    • Nuclear Engineering and Technology
    • /
    • 제50권6호
    • /
    • pp.860-868
    • /
    • 2018
  • This article presents a new design of earthquake instrumentation that is suitable for quick decision-making after the seismic event at the nuclear power plant (NPP). The main objective of this work is to ensure more availability of the NPP by expediting walk-down period when the seismic wave is incident. In general, the decision-making to restart the NPP after the seismic event requires more than 1 month if an earthquake exceeds operating basis earthquake level. It affects to the plant availability significantly. Unnecessary shutdown can be skipped through quick assessments of operating basis earthquake, safe shutdown earthquake events, and damage status to structure, system, and components. Multidecision parameters such as cumulative absolute velocity, peak ground acceleration, Modified Mercalli Intensity Scale, floor response spectrum, and cumulative fatigue are discussed. The implementation scope on the field-programmable gate array platform of this work is limited to cumulative absolute velocity, peak ground acceleration, and Modified Mercalli Intensity. It can ensure better availability of the plant through integrated decision-making process by automatic assessment of NPP structure, system, and components.

사용후 핵연료 취급장비의 내진해석 (A Seismic Analysis of Spent Fuel Handling Tool)

  • 김성종;이영신;김재훈;김남균
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2002년도 춘계학술대회논문집
    • /
    • pp.1210-1215
    • /
    • 2002
  • The spent fuel handling tool is used to handle the refuel bundle and treated by hoist rope on the bridge crane. The new developed handling tool of NPP(Nuclear Power Plant) should be conformed the structural stability under earthquake condition. In this study, the stress and seismic analysis of the handling tool are performed by finite element method. Using the Floor Response Spectrum(FRS) obtained through the time history analysis, the modal and seismic analysis under Operating Basis Earthquake(OBE) and Safe Shutdown Earthquake(SSE) load conditions are carried out. Total 4 cases of different locations of the trolly and the hook are investigated. With the spring-damper element, the tension analysis of hoist rope is conducted. The stability of handling tool under earthquake load condition is conformed with regulatory guide.

  • PDF

Theoretical analysis on vibration characteristic of a flexible tube under the interaction of seismic load and hydrodynamic force

  • Lai, Jiang;He, Chao;Sun, Lei;Li, Pengzhou
    • Nuclear Engineering and Technology
    • /
    • 제52권3호
    • /
    • pp.654-659
    • /
    • 2020
  • The reliability of the spent fuel pool instrument is very important for the security of nuclear power plant, especially during the earthquake. The effect of the fluid force on the vibration characteristics of the flexible tube of the spent fuel pool instrument needs comprehensive analysis. In this paper, based on the potential flow theory, the hydrodynamic pressures acting on the flexible tube were obtained. A mathematical model of a flexible tube was constructed to obtain the dynamic response considering the effects of seismic load and fluid force, and a computer code was written. Based on the mathematical model and computer code, the maximum stresses of the flexible tube in both safe shutdown earthquake and operating basis earthquake events on the spent fuel pool with three typical water levels were calculated, respectively. The results show that the fluid force has an obvious effect on the stress and strain of the flexible tube in both safe shutdown earthquake and operating basis earthquake events.

설계기준초과지진 하의 원전 배관 구조건전성 평가를 위한 변형률 기반 방법 (Strain-Based Structural Integrity Evaluation Methods for Nuclear Power Plant Piping under Beyond Design Basis Earthquake)

  • 이대영;박흥배;김진원;류호완;김윤재
    • 한국압력기기공학회 논문집
    • /
    • 제12권2호
    • /
    • pp.66-70
    • /
    • 2016
  • Following the 2011 Fukushima Nuclear Power Plant accident, the IAEA has issued a revised version of the Nuclear Safety Standard for beyond design basis earthquake to consider the core meltdown accident. In Korea, relevant laws and regulations were also revised to consider beyond design basis earthquake to nuclear components. In this paper, CAV, an seismic damage factor that determines the restart of nuclear power plant after operating breakdown earthquake, is proposed for extension to the beyond design basis earthquake. For pipings not satisfying the beyond design basis earthquake condition, several evaluation methods are suggested, such as strain-based evaluation methods, simple nonlinear analysis method and cumulative damage evaluation method.

유체와 구조물의 연성을 고려한 rack 구조물의 내진해석 (Seismic Analysis of Rack Structure with Fluid-Structure Interaction)

  • 김성종;이영신;류충현;양계형;정성환
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2001년도 추계학술대회논문집A
    • /
    • pp.465-470
    • /
    • 2001
  • In this study, the seismic analysis of rack structure with fluid-structure interaction is performed through use of the Finite Element Method(FEM) code ANSYS. Fluid-structure interaction can specify in terms of an hydrodynamic effect which is defined as the added mass per unit length divided by the area of the cross section. Using the Floor Response Spectrum(FRS) obtained through the time-history analysis, modal analysis and seismic analysis under Operating Basis Earthquake(OBE) and Safe Shutdown Earthquake(SSE) condition is carried out. The fluid-structure interaction effects on the rack structure are investigated.

  • PDF

발전소 배관계의 내진해석 (Seismic Analysis of Power Plant Piping System)

  • 김정현;이영신;김연환
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2011년도 추계학술대회 논문집
    • /
    • pp.480-485
    • /
    • 2011
  • In this study, the seismic analysis of power plant piping system was performed using finite element model. This study was performed by ANSYS 12.1. For qualification of power plant piping system, the response spectrum analysis was performed using the given operating basis earthquake(OBE) and safe shutdown earthquake(SSE) floor response spectrum. The maximum stresses of power plant piping system were 166 MPa under OBE condition and 281 MPa under SSE condition. Thus, it can shown that the structural integrity of tpower plant piping system has a stable structure for seismic load conditions.

  • PDF

해수여과장치의 내진해석 (Seismic Analysis of Traveling Sea Water Screen)

  • 김흥태;이영신;박영문
    • 한국전산구조공학회논문집
    • /
    • 제24권3호
    • /
    • pp.289-294
    • /
    • 2011
  • 본 논문에서는 유한요소모델을 사용하여 원자력 발전용 해수여과장치에 대한 동적 내진해석을 수행하였다. 장치의 검증을 위해서 운전기준지진(Operating Basis Earthquake, OBE)과 안전정지지진(Safe Shutdown Earthquake, SSE)이 설계하중으로 작용하였을 때 부재에 미치는 영향을 평가하였다. 해석대상은 유한요소법을 사용하여 수학적 모델링을 완성하였고, 층응답스펙트럼(Floor Response Spectrum, FRS)에 따른 지진하중과 사하중 등을 적용하여 해석을 수행하였다. 해석된 해수여과장치의 최대변위는 OBE 조건에서 2.5mm이고, SSE 조건에서 최대변위는 4.6mm이다. 최대응력은 OBE 조건에서 24MPa, SSE 조건에서 44MPa이며, 이 값은 재료의 항복강도의 각각 18%, 27% 수준이다. 이에 따라 지진하중 조건에 따른 해수여과장치의 구조적 안전성이 제시되었다.

원자력 발전소 RCB 내 중요배관의 KEPIC 코드에 의한 내진 안전성 설계 (A Seismic Stability Design by the KEPIC Code of Main Pipe in Reactor Containment Building of a Nuclear Power Plant)

  • 이형복;이진규;강태인
    • 한국정밀공학회지
    • /
    • 제28권2호
    • /
    • pp.233-238
    • /
    • 2011
  • In piping design of nuclear power plant facilities, the load stress according to self-weight is important for design values in test run(shutdown and starting). But sometimes it needs more studies, such as seismic analysis of an earthquake of power plant area and fatigue life and stress of thermal expansion and anchor displacement in operating run. In this paper, seismic evaluations were performed to nuclear piping system of Shin-Kori NO. 3&4 being built in Pusan lately. Results of seismic analysis are evaluated on basis of KEPIC MN code. The structural integrity on RCB piping system was proved.

구조물 및 기기의 한계성능 평가를 위한 고진동수 지진 특성을 반영한 응답스펙트럼 형상 (A Shape of the Response Spectrum for Evaluation of the Ultimate Seismic Capacity of Structures and Equipment including High-frequency Earthquake Characteristics)

  • 임승현;최인길
    • 한국지진공학회논문집
    • /
    • 제24권1호
    • /
    • pp.1-8
    • /
    • 2020
  • In 2016, an earthquake occurred at Gyeongju, Korea. At the Wolsong site, the observed peak ground acceleration was lower than the operating basis earthquake (OBE) level of Wolsong nuclear power plant. However, the measured spectral acceleration value exceeded the spectral acceleration of the operating-basis earthquake (OBE) level in some sections of the response spectrum, resulting in a manual shutdown of the nuclear power plant. Analysis of the response spectra shape of the Gyeongju earthquake motion showed that the high-frequency components are stronger than the response spectra shape used in nuclear power plant design. Therefore, the seismic performance evaluation of structures and equipment of nuclear power plants should be made to reflect the characteristics of site-specific earthquakes. In general, the floor response spectrum shape at the installation site or the generalized response spectrum shape is used for the seismic performance evaluation of structures and equipment. In this study, a generalized response spectrum shape is proposed for seismic performance evaluation of structures and equipment for nuclear power plants. The proposed response spectrum shape reflects the characteristics of earthquake motion in Korea through earthquake hazard analysis, and it can be applied to structures and equipment at various locations.

원자력발전소 지진감시시스템의 운용프로그램 개발 (Development of the Operational Program for Seismic Monitoring System in Nuclear Power Plants)

  • 김성택
    • 한국지진공학회:학술대회논문집
    • /
    • 한국지진공학회 1997년도 추계 학술발표회 논문집 Proceedings of EESK Conference-Fall 1997
    • /
    • pp.82-89
    • /
    • 1997
  • Due to aging of the imported seismic monitoring system of Uljin 1&2 units it is difficult for this system to provide enough functions needed for the security of seismic safety and the evaluation of the earthquake data from the seismic instrumentation. For this reason, it is necessary to replace the seismic monitoring system of Uljin 1&2 units with an upgraded system with corresponding softwars. With operation of this system which incorporates the man-machine interface technology, the operators in nuclear power plant can rapidly and correctly determine the exceedance of Operating Basis Earthquake.

  • PDF