• 제목/요약/키워드: On-Site Assessment

Search Result 1,367, Processing Time 0.034 seconds

Structural performance assessment of fixed offshore platform based on in-place analysis

  • Raheem, Shehata E. Abdel;Aal, Elsayed M. Abdel;AbdelShafy, Aly G.A.;Mansour, Mahmoud H.;Omar, Mohamed
    • Coupled systems mechanics
    • /
    • v.9 no.5
    • /
    • pp.433-454
    • /
    • 2020
  • In-place analysis for offshore platforms is essentially required to make proper design for new structures and true assessment for existing structures. The structural integrity of platform components under the maximum and minimum operating loads of environmental conditions is required for risk assessment and inspection plan development. In-place analyses have been executed to check that the structural member with all appurtenances robustness and capability to support the applied loads in either storm condition or operating condition. A nonlinear finite element analysis is adopted for the platform structure above the seabed and the pile-soil interaction to estimate the in-place behavior of a typical fixed offshore platform. The analysis includes interpretation of dynamic design parameters based on the available site-specific data, together with foundation design recommendations for in-place loading conditions. The SACS software is utilized to calculate the natural frequencies of the model and to obtain the response of platform joints according to in-place analysis then the stresses at selected members, as well as their nodal displacements. The directions of environmental loads and water depth variations have important effects on the results of the in-place analysis behavior. The result shows that the in-place analysis is quite crucial for safe design and operation of offshore platform and assessment for existing offshore structures.

Advanced Reactor Passive System Reliability Demonstration Analysis for an External Event

  • Bucknor, Matthew;Grabaskas, David;Brunett, Acacia J.;Grelle, Austin
    • Nuclear Engineering and Technology
    • /
    • v.49 no.2
    • /
    • pp.360-372
    • /
    • 2017
  • Many advanced reactor designs rely on passive systems to fulfill safety functions during accident sequences. These systems depend heavily on boundary conditions to induce a motive force, meaning the system can fail to operate as intended because of deviations in boundary conditions, rather than as the result of physical failures. Furthermore, passive systems may operate in intermediate or degraded modes. These factors make passive system operation difficult to characterize within a traditional probabilistic framework that only recognizes discrete operating modes and does not allow for the explicit consideration of time-dependent boundary conditions. Argonne National Laboratory has been examining various methodologies for assessing passive system reliability within a probabilistic risk assessment for a station blackout event at an advanced small modular reactor. This paper provides an overview of a passive system reliability demonstration analysis for an external event. Considering an earthquake with the possibility of site flooding, the analysis focuses on the behavior of the passive Reactor Cavity Cooling System following potential physical damage and system flooding. The assessment approach seeks to combine mechanistic and simulation-based methods to leverage the benefits of the simulation-based approach without the need to substantially deviate from conventional probabilistic risk assessment techniques. Although this study is presented as only an example analysis, the results appear to demonstrate a high level of reliability of the Reactor Cavity Cooling System (and the reactor system in general) for the postulated transient event.

Analysis of Land Suitability and Ecological Environment Using GIS Focused on the Evaluation Model for Designating of Natural Ecological Preservation Zone (지리정보체계를 이용한 생태환경분석 및 적지분석: 자연생태계 보전지역 설정 및 평가 모형을 중심으로)

  • Lee, Myungwoo
    • Journal of Environmental Impact Assessment
    • /
    • v.6 no.2
    • /
    • pp.61-80
    • /
    • 1997
  • This study tried to propose the guidelines for the ecological preservation zoning in Korea. So some related laws and regulations were inspected, which were Natural Environment Preservation Act, Nature Park Act, Cultural Asset Conservation Act, Forest Act and Urban Planning Act. In these acts, I could find several concepts related to the ecosystem that are described as the protection area. But there aren't detailed and practical characteristics in those concepts. So for making the practical concept of ecosystem preservation, I considered Multiple Use Module, Wildlife habitat model, and Environmental evaluation model. Thorough this step, the process and methodology was established for evaluating and analysing. The potentiality of the GIS system was inspected. So the TM5 scene of the site was acquired and processed by ER-Mapper, Idrisi, Arc/Info and Arcview. And several digitized data were input by scanning and vecterizing. The Erdas format was mostly exchangeable to any program. The site is the Byonsan Peninsula National Park. The forest stand information and topographic data were digitized, types of which are forest year, DBH, density, slope, aspect etc. And also the watershed boundary, roads and paths, natural and cultural resources were mapped and analysed. Modelling of preservation suitability found the dispersed patterns for the best suitable zone through all the site. And the development potential areas were checked on downwatershed. This patterns are thought to result from the forest location for the wildlife habitat and the low altitude and no-steep slopes for developing. And Early warning system concept was introduced by overlapping these two patterns on the both potential area. As the conclusions, I proposed that the preservation zone be assigned according to the watershed unit as the main ecosystem zone. This main area should be linked by the eco-corridor through the point type eco-system. Finally, I thought the comprehensive information system should be established for making the rational and efficient decision making in natural area.

  • PDF

Application of Probabilistic Tsunami Hazard Analysis for the Nuclear Power Plant Site (원자력 발전소 부지에 대한 확률론적 지진해일 재해도 분석의 적용)

  • Rhee, Hyun-Me;Kim, Min Kyu;Sheen, Dong-Hoon;Choi, In-Kil
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.19 no.6
    • /
    • pp.265-271
    • /
    • 2015
  • The tsunami hazard analysis is performed for testing the application of probabilistic tsunami hazard analysis to nuclear power plant sites in the Korean Peninsula. Tsunami hazard analysis is based on the seismic hazard analysis. Probabilistic method is adopted for considering the uncertainties caused by insufficient information of tsunamigenic fault sources. Logic tree approach is used. Uljin nuclear power plant (NPP) site is selected for this study. The tsunamigenic fault sources in the western part of Japan (East Sea) are used for this study because those are well known fault sources in the East Sea and had several records of tsunami hazards. We have performed numerical simulations of tsunami propagation for those fault sources in the previous study. Therefore we use the wave parameters obtained from the previous study. We follow the method of probabilistic tsunami hazard analysis (PTHA) suggested by the atomic energy society of Japan (AESJ). Annual exceedance probabilities for wave height level are calculated for the site by using the information about the recurrence interval, the magnitude range, the wave parameters, the truncation of lognormal distribution of wave height, and the deviation based on the difference between simulation and record. Effects of each parameters on tsunami hazard are tested by the sensitivity analysis, which shows that the recurrence interval and the deviation dominantly affects the annual exceedance probability and the wave heigh level, respectively.

A Study on Suitability of Road Traffic Noise Map for Environmental Noise Impact Assessment (환경소음 영향평가 시 도로교통 소음지도의 적용성 검토 연구)

  • Kim, Ji-Yoon;Park, Sang-Kyu
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2008.11a
    • /
    • pp.311-316
    • /
    • 2008
  • It is needed to assess the impact of the road traffic noise for city planning. In Korea, the current noise impact assessment h3s not yet considered the impacts of the multiple reflection, the deflection and the ground attenuation caused by buildings and other obstacles. A noise map is useful tool to solve this problems. But before everything else, suitability of noise map must be assessed for variety of geometry conditions. In this study, we assessed suitability of road traffic noise map by compared measured noise levels with predicted noise levels from each road traffic noise map for Site A, B and C.

  • PDF

A Study on the Improvement Plan of Construction Noise Monitoring (공사장 소음모니터링 개선방안에 관한 연구)

  • Park, Young-Min;Kim, Kyoung-Min
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.23 no.12
    • /
    • pp.1056-1065
    • /
    • 2013
  • Noise generated from Construction site has been raised most civil complaints to 64.4 % among the environmental pollution in 2011. Therefore, local government recommends and prescribes that construction sites over a certain scale install sound level meter for noise monitoring. For example, Seoul has implemented a 24 hour noise monitoring system, with real time communication, to the large construction sites more than 10,000 $m^2$ from the end of August 2012. But it is difficult to use noise measurement data for the construction noise assessment, since the installation standards and technical specifications for construction noise monitoring system are not presented. In this paper, we proposed noise monitoring system improvement plan including technical specifications and installation standards using the investigating results of the problems of current noise monitoring system and the foreign cases.

Probabilistic Risk Assessment Techniques for the Risk Analysis of Construction Projects (건설공사의 위험도분석을 위한 확률적 위험도 평가)

  • 조효남;임종권;박영빈
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1997.04a
    • /
    • pp.27-34
    • /
    • 1997
  • In this paper, systematic and comprehensive approaches are suggested for the application of quantitative PRA techniques especially for those risk events that cannot be easily evaluated quantitatively In addition, dominant risk events are identified based on their occurrence frequency assessed by both actual survey of construction site conditions and the statistical data related with the probable accidents. Practical FTA(Fault Tree Analysis) and ETA(Event Tree Analysis) models are used for the assessment of the identified risks. When the risk events are lack of statistical data, appropriate Bayesian models incorporating engineering judgement and test results are also introduced in this paper. Moreover, a fuzzy probability technique is used for the quantitative risk assessment of those risk components which are difficult to evaluate quantitatively.

  • PDF

A Case Study on the Safety Assessment for Groundwater Pathway in a Near-Surface Radioactive Waste Disposal Facility

  • Park, Joo-Wan;Chang, Keun-Moo;Kim, Chang-Lak
    • Nuclear Engineering and Technology
    • /
    • v.34 no.3
    • /
    • pp.232-241
    • /
    • 2002
  • A safety assessment is carried out for the near-surface radioactive waste disposal in the reference engineered vault facility. The analysis is mainly divided into two parts. One deals with the release and transport of radionuclide in the vault and unsaturated zone. The other deals with the transport of radionuclide in the saturated zone and radiological impacts to a human group under well drinking water scenario. The parameters for source-term, geosphere and biosphere models are mainly obtained from the site specific data. The results show that the annual effective doses are dominated by long lived, mobile radionuclides and their associated daughters. And it is found that the total effective dose for drinking water is far below the general criteria of regulatory limit for radioactive waste disposal facility.

A Study on Development of Pre-Hazards Risk Analysis Guide Tool (연구실 위험분석을 위한 사전유해인자 가이드 Tool 개발 연구)

  • Choi, Byeong Kyu;Rhie, Kwang Won
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.4
    • /
    • pp.133-140
    • /
    • 2017
  • The Ministry of Science, ICT and Future Planning made law for Pre-Hazard Risk Analysis in December 31, 2014 to protect researchers from continuing accidents in laboratory. Conducted before an experiment, Pre-Hazard Risk Analysis finds hazards of the experiment and rules to manage the hazards.So the Pre-Hazard Risk Analysis can support laboratory safety system by prevent accidents in laboratory. Pre-Hazards Risk Analysis is newly created system so that executors need Guidelines to perform this analysis properly. This study is to develop guide tool for Pre-Hazard Risk Analysis by analyzing other risk assessment systems; PSM, Off-site Consequence Assessment, laboratory safety system. Also, this study suggested how to establish database for Pre-Hazard Risk Assessment by analyse KRAS.

Health Evaluation and Fish Population Analysis by Using LEHA (Lentic Ecosystem Health Assessment) Model (LEHA 모델을 이용한 어류군집 특성 분석 및 건강성 평가)

  • Han, Seock-Jung;Kim, Bong-Rae;Cha, Jun-Seong;Kang, Kyoung-Ho;Jung, Min-Min
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.26 no.6
    • /
    • pp.1185-1192
    • /
    • 2014
  • Health assessment of aquatic ecosystem was investigated by using LEHA (Lentic Ecosystem Health Assessment) model method with habitat fish population structure analysis in this study. The investigation was two comparison spots (St 1; floating island, St 2; 500 m away site from st 1) in the Habcheon lake of Korea. As results, health evaluation of Habcheon lake ecosystem was fair grade of LEHA scores base on metric values in both place (30 score in st. 1 and 32 score in st. 2).