• Title/Summary/Keyword: Offshore met-mast

Search Result 12, Processing Time 0.018 seconds

A Comparison of Offshore Met-mast and Lidar Wind Measurements at Various Heights (해상기상탑과 윈드 라이다의 높이별 풍황관측자료 비교)

  • Kim, Ji Young;Kim, Min Suek
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.29 no.1
    • /
    • pp.12-19
    • /
    • 2017
  • There is a need to substitute offshore met-mast with remote sensing equipment such as wind lidar since the initial installation and O&M costs for offshore met-mast are quite high. In this study, applicability of wind lidar is verified by intercomparison test of wind speed and direction data from offshore met-mast and wind lidar for simultaneous operational period. Results at various heights show no statistical difference in trend and size and data from wind lidar is found to be more accurate and have less error than data from offshore met-mast where error from structural shading effect is significant.

Installation of Meteorological Mast for the Test Bed of Offshore Wind Power (서해 100MW 해상풍력 실증단지 기상타워 구축사례)

  • Ryu, Moosung;Kang, Keumseok;Kim, Jiyoung;Lee, Junshin
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.55.2-55.2
    • /
    • 2011
  • The final site of offshore wind power plant should be decided by comprehensive examination of various conditions such as wind resource, sea depth, geology, grid connection, social circumstance and environmental issue. Wind condition is typically regarded as the most important factor because wind energy increases in proportion to wind velocity and it directly relates to the amount of power output, efficiency of power plant and profitability. Advanced countries in the offshore wind power sector such as Denmark, UK and Germany, they are analyzing wind resource accurately by installing the meteorological mast in the ocean in order to get the optimal type of wind turbine and maximum generation efficiency. Also, it is made much of designing offshore power plant on the basis of actual measurement by met-mast and those wind farms have a chance to get the loan with reduced interest rate in project financing. In Korea, the HEMOSU-1 is installed in the ocean around Wido island to analyze wind resource of test bed of 100MW offshore wind power on october last year. This paper deals with the design and construction procedure of the first met-mast in Korea and also shows the site characteristics of test bed. Therefore, this paper will give useful information to local governments and private business sector who are trying to construct offshore wind farm and it can also be a good reference for the following projects of meteorological mast in near future.

  • PDF

Application of ERA-Interim Reanalysis Data for Onshore and Offshore Wind Resource Assessment (육·해상 풍력자원평가를 위한 ERA-Interim 재해석 데이터의 적용)

  • Byun, Jong-Ki;Ko, Kyung-Nam
    • Journal of the Korean Solar Energy Society
    • /
    • v.37 no.2
    • /
    • pp.1-11
    • /
    • 2017
  • The investigation on reliability of ERA-Interim reanalysis wind data was conducted using wind data from the five met masts measured at inland and coastal areas, Jeju island. Shinchang, Handong, Udo, Susan and Cheongsoo sites were chosen for the met mast location. ERA-Interim reanalysis data at onshore and offshore twenty points over Jeju Island were analyzed for creating Wind Statistics using WindPRO software. Reliability of ERA-Interim reanalysis wind data was assessed by comparing the statistics from the met mast wind data with those predicted at the interest point using the Wind Statistics. The relative errors were calculated for annual average wind speed and annual energy production. In addition, the trend of the error was analyzed with distance from met mast. As a result, ERA-Interim reanalysis wind data was more suitable for offshore wind resource assessment than onshore.

Reliability assessment of ERA-Interim/MERRA reanalysis data for the offshore wind resource assessment (해상풍력자원 평가를 위한 ERA-Interim/MERRA 재해석 데이터 신뢰성 평가)

  • Byun, Jong-Ki;Son, Jin-Hyuk;Ko, Kyung-Nam
    • Journal of Power System Engineering
    • /
    • v.20 no.4
    • /
    • pp.44-51
    • /
    • 2016
  • An investigation on reliability of reanalysis wind data was conducted using the met mast wind data at four coastal regions, Jeju Island. Shinchang, Handong, Udo and Gangjeong sites were chosen for the met mast sites, and ERA-Interim and MERRA reanalysis data at two points on the sea around Jeju Island were analyzed for creating Wind Statistics of WindPRO software. Reliability of reanalysis wind data was assessed by comparing the statistics from the met mast wind data with those from Wind Statistics of WindPRO software. The relative error was calculated for annual average wind speed, wind power density and annual energy production. In addition, Weibull wind speed distribution and monthly energy production were analyzed in detail. As a result, ERA-Interim reanalysis data was more suitable for wind resource assessment than MERRA reanalysis data.

The Research on the Yeonggwang Offshore Wind Farm Generated Energy Prediction (영광 해상풍력단지 발전량 예측에 관한 연구)

  • Jeong, Moon-Seon;Moon, Chae-Joo;Jeong, Gwan-Seong;Choi, Man-Soo;Jang, Yeong-Hak
    • Journal of the Korean Solar Energy Society
    • /
    • v.32 no.3
    • /
    • pp.33-41
    • /
    • 2012
  • As the wind farms in large scale demand enormous amount of construction cost, minimizing the economic burden is essential and also it is very important to measure the wind resources and forecast annual energy production correctly to judge the economic feasibility of the proposed site by way of installing a Met mast at or nearby the site. Wind resources were measured by installing a 80[m] high Met mast at WangdeungYeo Island to conduct the research incorporated in this paper and offshore wind farm was designed using WindPRO. Wind farm of 100[MW] was designed making use of 3 and 4.5[MW] wind generator at the place selected to compare their annual energy production and capacity factor applying the loss factor of 10[%] and 20[%] respectively to each farm. As a result, 336,599[MWh] was generated by applying 3[MW] wind generator while 358,565 [MWh] was produced by 4.5[MW] wind generator. Difference in the energy production by 3[MW] generator was 33,660 [MWh] according to the loss factor with the difference in its capacity factor by 3.8[%]. On the other hand, 23 units of 4.5 [MW] wind generators showed the difference of annual energy production by 35,857 [MWh] with 4.0[%] capacity factor difference.

Development of Web-Based Wind Data Analysis System for HeMOSU-1 (웹기반 해모수-1 풍황자료 분석 시스템 개발)

  • Ryu, Ki-Wahn;Park, Kun-Sung;Lee, Jong-Hwa;Oh, Soo-Yun;Kim, Ji-Young;Park, Myoung-Ho
    • Journal of Wind Energy
    • /
    • v.4 no.1
    • /
    • pp.60-67
    • /
    • 2013
  • A web-based program was developed for analyzing weather and structure data from the HeMOSU-1 offshore meteorological mast installed by the KEPCO Research Institute, and 35 km west-southwestward away from Gyeokpo located in Jeonbuk province. All of the measured data are obtained through the data transmitter and the server systems equipped on the HeMOSU-1 and the aerodynamic laboratory in Chonbuk National University respectively. The dualised server system consists of two servers, one is for logging the 1 second based raw data with 10 minute averaged values, and the other is for managing web page with processed weather data. Daily or weekly 10-min averaged data can be provided based on the input date by users. Processed weather data such as wind rose, Weibull distribution, diurnal distribution, turbulence intensity according to wind speed, wind energy density, and so forth are visualized through the web page which would be both useful and informative for developing the wind farm or designing a wind blade for the wind farm nearby southwest sea around the Korean Peninsula. The URL for this web page is http://www.hemosu.org/.

The Development of Offshore Wind Resource Measurement System and Remote Monitoring System (해상기상관측 시스템 및 실시간 원격 모니터링시스템 개발)

  • Ko, Suk-Whan;Jang, Moon-Seok;Lee, Youn-Seop
    • Journal of the Korean Solar Energy Society
    • /
    • v.31 no.6
    • /
    • pp.72-77
    • /
    • 2011
  • The purpose for installation of offshore weather station is a measurement of wind resources and so on. If weather station is operated, it will be possible to analysis for wind resource and arrangement of wind farm by using measured data. In this paper, we carried out the development of offshore wind resource measurement system for measuring offshore wind resource. Also, In order to monitor for real-time wind data with 1 Hz, we installed the wireless transmission system. All wind characteristic data are sent to the server PC through the this system is connected outport of DataLogger. Transmitted wind data were used in order to look at in the Web-page and tablet PC on a real time basis in a graph. In this paper, we will introduce about the wind resource measurement and remote monitoring system that is the result of study.

A study on Design of Generation Capacity for Offshore Wind Power Plant : The Case of Chonnam Province in Korea (해상풍력 발전용량 설계에 관한 연구 : 전남사례를 중심으로)

  • Jeong, Moon-Seon;Moon, Chae-Joo;Chang, Young-Hak;Lee, Soo-Hyoung;Lee, Sook-Hee
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.13 no.3
    • /
    • pp.547-554
    • /
    • 2018
  • Wind energy is widely recognized as one of the cheapest forms of clean and renewable energy. In fact, in several countries, wind energy has achieved cost parity with fossil fuel-based sources of electricity generation for new electricity generation plants. Offshore wind energy development promises to be a significant domestic renewable energy source for the target of korea government 3020 plan. A pivotal activity during the development phase of a wind project is wind resource assessment. Several approaches can be categorized as three basic scales or stages of wind resource assessment: preliminary area identification, area wind resource evaluation, and micrositing. This study is to estimate the wind power capacity of chonnam province offshore area using three basic stages based on the six meteorological mast data. WindPRO was used, one of a well-known wind energy prediction programs and based on more than 25 years of experiences in development of software tools for wind energy project development. The design results of offshore wind power generation capacity is calculated as total 2.52GW with six wind farms in chonnam offshore area.

The Energy Production of Offshore Wind Farm Using WindPRO (WindPRO를 이용한 해상풍력단지 발전량 예측)

  • Jeong, Moon-Seon;Moon, Chae-Joo;Kwak, Seung-Hun;Choi, Man-Su;Chang, Young-Hak
    • Proceedings of the KIPE Conference
    • /
    • 2010.11a
    • /
    • pp.267-268
    • /
    • 2010
  • 본 논문에서는 풍력발전단지 설계를 목적으로 사용되고 있는 EMD사의 WindPRO2.6을 이용하여 서남해안에 설치된 50m 높이의 Met mast에서 1년 동안 관측된 풍황자원을 분석하고, 특정 풍력발전기를 적용하여 40MW급 해상풍력발전단지를 설계했을 경우 연간 생산되는 발전량을 예측하였다.

  • PDF

Analysis of Working Time at the Test Site of Southwest Offshore Wind Project in Korea Based on Weather Window (기상조건에 따른 서남해 해상풍력 실증단지 작업시간 분석)

  • Kim, Min Suek;Kim, Ji Young;Kwak, Ji Yeong;Kang, Keum Seok
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.27 no.5
    • /
    • pp.358-363
    • /
    • 2015
  • As a preparation process for successful establishment of demonstration offshore wind farm, analyses have been made for working time at the construction site where working time is defined as the time available for marine operation to take place under given weather conditions. Data used are hourly wave and wind data from met mast, HeMOSU-1, and 3 hour numerical model data from Korea Meteorological Administration (KMA). Seasonal results show the minimum working time during winter and moderate during autumn and spring. The most working time was seen during summer on average. Monthly analyses show the most working time in May, June, and August which was higher than the working time in July and September. Working time reaches at steady state and no significant change was seen above wave height of 1.5 m and wind speed of 8 m/s.