• Title/Summary/Keyword: Offshore Installation

Search Result 227, Processing Time 0.031 seconds

A Study on the Public Acceptance of Offshore Wind Farm near Maldo (말도 인근 해상풍력발전에 대한 주민수용성 연구)

  • Park, Jaepil;Lee, Sanghyuk
    • New & Renewable Energy
    • /
    • v.17 no.3
    • /
    • pp.24-31
    • /
    • 2021
  • Through 'The Renewable Energy 3020 Implementation Plan' for carbon neutrality, the government promised to raise the proportion of renewable energy generation to 20% and renewable energy installation capacity to 63.8% by 2030. Therefore, we plan to test a 5.5 MW offshore wind turbine near Maldo, Gunsan. In this project, we measure the level of public acceptance and perform ordinary least squares (OLS) regression analysis to show the determinants of public acceptance. The regression results are as followed. First, it is judged that the closer the distance to the offshore wind turbine, the more the economic effects considered by residents. Second, especially in Maldo, the experience of being discriminated from the Saemangeum project, is understood to have caused distrust in the surrounding fishing villages chief/Fisheries Cooperatives, converted into a local community effect. Finally, the policy implications are as follows. First, a bottom-up problem-solving method is required to improve public acceptance, based on the Living Lab. Second, the island community may be indifferent to the briefings or forums of outsiders. Therefore, a gradual approach is required through (in)formal channels based on reliability from a long-term perspective with nearby universities and research institutes using SamsØ Energy Academy.

Design of Vertically Adjustable Transition Piece of Concrete Gravity Based Substructure for Offshore Wind Turbine (수직도 조정이 가능한 콘크리트 중력식 해상풍력 지지구조물 연결부 설계)

  • Shim, WunBo;Ahn, Jin-Young;Kwak, Dong-Woo;Bae, Kyung-Tae;Zi, Goangseup
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.4
    • /
    • pp.42-51
    • /
    • 2018
  • Verticality problem during the installation process in offshore wind turbine substructures could degrade the safety of the whole structures. Therefore, in this paper, the design of vertically adjustable transition piece(T.P.), using a PS anchor and grout of anchor socket in concrete gravity based substructure(G.B.S.), was proposed. T.P. was designed for 5MW offshore wind trubine and can adjust up to $0.5^{\circ}$ in verticality, occurred during installation. The design plan for each members and design procedure for T.P. was proposed. Then based on the proposed design, actual design targeting sea of Jeju-island was carried out. Finally, by use of non-linear 3D Finite Element Analysis(F.E.A.), evaluation of design was performed. As a result of evaluation, by checking load transfer mechanism and stress of T.P, proposed design was considered safe up to $0.5^{\circ}$ of adjustment.

Study on the Vessel Traffic Safety Assessment for Routeing Measures of Offshore Wind Farm (해상풍력발전단지의 대체통항로 통항안전성 평가에 관한 연구)

  • Yang, Hyoung-Seon
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.20 no.2
    • /
    • pp.186-192
    • /
    • 2014
  • In this paper, we analysed vessel traffic volume and patterns of traffic flow for ships using areas where included wind farm site and adjacent waters of Daejeong Offshore Wind Farm, and estimated traffic volume by classified navigational routes according to suggestion of rational routeing measures on the basis of classified patterns after installation of offshore wind facilities. Also, we assessed vessel traffic safety for each designed routeing measures on the basis of estimated traffic volume and proposed requisite countermeasures for the safe navigation of ships. With a result of analysing patterns of traffic flow, the current traffic flow was classified by 8 patterns and the annual traffic volume was predicted to 8,975 ships. On the basis of these, expected the vessel traffic volume according to designed four routeing mesaures after installation of wind farm. As result of assessing vessel traffic safety by using powered-vessel collision model of SSPA on the basis of the estimated traffic volume, the value of collision probability was less than safe criteria $10^{-4}$. Thereby we made sure usability of the designed routeing measures for the safe navigation of ships.

Understanding of Offshore Drilling System and Trend Analysis (해양 시추시스템 구성요소에 대한 이해 및 동향분석)

  • Woo, Nam-Sub;Kwon, Jae-Ki;Park, Jong-Myung;Kim, Sang-Shik;Kim, Young-Ju
    • Transactions of the KSME C: Technology and Education
    • /
    • v.1 no.1
    • /
    • pp.33-38
    • /
    • 2013
  • Offshore drilling refers to a mechanical process where a wellbore is drilled through a seabed. It is typically carried out in order to explore for and subsequently extract petroleum which lies in rock formations beneath the seabed. There are many different type of facilities from which offshore drilling operations take place. These include bottom founded drilling rigs, combined drilling and production facilities either bottom founded or floating platforms, and deepwater mobile offshore drilling units including semi-submersibles and drillships. These are capable of operating in water depths up to 3,000 m. In this paper, we introduce the drilling system, which is mounted on the offshore drilling facilities.

Optimization of Grid Network for Offshore Wind Power Plant (해상풍력발전단지의 전력망 구성의 최적화에 관한 연구)

  • Moon, Won-Sik;Jo, Ara;Kim, Jae-Chul;Bae, In-Soo;Yoon, Gi-Gab;Park, Sang-Ho;Choy, Young-Do
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.1094-1095
    • /
    • 2015
  • The costs of installation, loss, and energy not supplied energy for submarine cable of offshore wind power plant (OWPP) are very high because the level of technology is still in the early stage as well as because of the marine environments. Therefore, reducing the total costs of a grid network for OWPPs is very important for financial feasibility. In particular, it is needed to minimize the project cost for optimizing the grid design and offshore substation location of a OWPP. The suggested method can reduce the total system cost and make it lower compared with existing methods.

  • PDF

Effects of Heat Inputs on the Mechanical Properties of FCA Weldment of YP 690MPa Grade Steels (항복강도 690MPa급 전자세용 FCA 용접와이어 개발에 있어 용접 입열의 영향 평가)

  • Jo, Young-Ju;Seo, Dae-Gon;Shin, Yong-Taek
    • Journal of Welding and Joining
    • /
    • v.34 no.6
    • /
    • pp.11-15
    • /
    • 2016
  • YP 690MPa grade steels are used as the main structural steel for offshore structure such as Jack-up Rig and WTIV(Wind Turbine Installation Vessel). Most of welding consumables applied to YP 690MPa grade steels are basic type flux cored wires that shows the poor weldability and not suitable for all position welding. For this reason, welding consumables with rutile type flux system is required. Rutile type flux cored wires show excellent weldability and apply to all position welding. This paper presents the mechanical properties of weld metal with rutile type flux cored wire developed and finally assessed the possibility for application.

Installation of Meteorological Mast for the Test Bed of Offshore Wind Power (서해 100MW 해상풍력 실증단지 기상타워 구축사례)

  • Ryu, Moosung;Kang, Keumseok;Kim, Jiyoung;Lee, Junshin
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.55.2-55.2
    • /
    • 2011
  • The final site of offshore wind power plant should be decided by comprehensive examination of various conditions such as wind resource, sea depth, geology, grid connection, social circumstance and environmental issue. Wind condition is typically regarded as the most important factor because wind energy increases in proportion to wind velocity and it directly relates to the amount of power output, efficiency of power plant and profitability. Advanced countries in the offshore wind power sector such as Denmark, UK and Germany, they are analyzing wind resource accurately by installing the meteorological mast in the ocean in order to get the optimal type of wind turbine and maximum generation efficiency. Also, it is made much of designing offshore power plant on the basis of actual measurement by met-mast and those wind farms have a chance to get the loan with reduced interest rate in project financing. In Korea, the HEMOSU-1 is installed in the ocean around Wido island to analyze wind resource of test bed of 100MW offshore wind power on october last year. This paper deals with the design and construction procedure of the first met-mast in Korea and also shows the site characteristics of test bed. Therefore, this paper will give useful information to local governments and private business sector who are trying to construct offshore wind farm and it can also be a good reference for the following projects of meteorological mast in near future.

  • PDF

Critical Limits of Commercial Diving on the Construction of Tidal Current Power in Jangjuk Channel (장죽수로 조류발전건설시 작업특성에 따른 산업잠수 작업한계)

  • Kim, Won-Seok
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.25 no.3
    • /
    • pp.733-742
    • /
    • 2013
  • The Korea has significant tidal current energy resources, but it is so hard to work underwater for tidal turbine installation. Therefore commercial diving work is very important for tidal current generator. Also, Jangjuk channel is vary famous as proper area to generate tidal current energy. Nevertheless, no one is studied about characteristics of commercial diving works with installation of tidal current generator. The purpose of this study is to introduce commercial diving with work types and investigate critical limits of diving working under the conditions, which are working only to minutes at slack tide during the neap tide. As the results, work types are five as like mooring installation, OMAS(Offshore Maintenance Access System), support structure installation, cable and turbine installation. Here, the original construction period is expected about 4 months, but the construction take 18 months to complete. The cause of extends construction period is insufficiency of researching tidal current conditions at the site and ignorance of slack tide which need to secure diving working time. Total diving working times are 110th during 18 months, the highest percentage of diving times is turbine installation about 43.6 %, and cable, mooring installation and support structure construction are 27.3 %, 15.5 %, 13.6 %, respectively. On the basis of this study, estimation of times of commercial diving is possible with work types of tidal current power, and has a significance as basic data to determining construction period.

Investigation on the Penetration Resistance of Suction Bucket Foundation in Sand using Model Test (모형실험을 통한 모래지반에서 석션버켓기초의 관입저항력 평가)

  • Kim, Keunsoo;Kwon, Osoon;Oh, Myounghak;Jang, Insung
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.6
    • /
    • pp.75-83
    • /
    • 2014
  • Suction bucket foundation is installed with the differential pressure created by pumping water out of bucket. Bucket foundation has usually been utilized in mooring anchor for offshore platform or floating oil and gas production facilities in the open sea. After suction bucket foundation successfully was applied as the foundation for offshore wind turbines in Europe, it recently attracts much attention in Korea, too. To estimate the penetration resistance of the suction bucket foundation is one of the important matters that should be considered during its installation. This study carried out a series of model tests to investigate the penetration resistance of suction bucket foundation. And the mobilized soil strength factor was reviewed through comparing the experimental results by two installation ways (e.g., push-in-load and suction) and the results calculated by the conventional equation.

Analysis on the Change of Wave Behaviour Due to Installation of Offshore Wind Turbine Foundations (해상풍력터빈 기초 구조물 설치로 인한 파랑거동 변화 검토)

  • Kim, Ji-Young;Kang, Keum-Seok
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.22 no.5
    • /
    • pp.306-315
    • /
    • 2010
  • As developing the large-scale offshore wind farm is expected, the preliminary environmental impact assessment is very essential. In this study, the wave hindcast model is verified based on observed data at the coast around Wido which is among the candidate sites for developing the offshore wind farm. In addition, the effect of the wind turbine foundations on wave height is analyzed when total 35 wind turbines including monopile foundations of 5 m in diameter are installed. Calculation result of significant wave height is in good accord with observed data since the RMS error is 0.35 m. Moreover, it is found that the presence of the wind turbine foundations hardly affects wave height as wave damping ratio is less than 1%.