• 제목/요약/키워드: Offshore Installation

검색결과 227건 처리시간 0.032초

Study on System Support for Offshore Plant Piping Process Using 3D Simulator

  • Kim, Hyun-Cheol;Lee, Gyu-Hong
    • 한국해양공학회지
    • /
    • 제34권3호
    • /
    • pp.217-226
    • /
    • 2020
  • An offshore plant is an offshore platform that can process oil and gas resources in rough seas with a poor working environment. Moreover, it is a complex structure with different types of offshore facilities and a large amount of outfitting that connects different offshore installations. In particular, an enormous amount of various piping materials is installed in a relatively narrow space, and thus, the difficulty of working is relatively high compared to working in ships or ground plants. Generally, when the 3D detailed design is completed, an offshore plant piping process is carried out at the shipyard with ISO 2D fabrication drawings and ISO 2D installation drawings. If a worker wants to understand the three-dimensional piping composition in the working area, he can only use three-dimensional viewers that provide limited functionality. As offshore plant construction progresses, correlating work with predecessors becomes more complicated and rework occurs because of frequent design changes. This viewer function makes it difficult to identify the 3D piping structure of the urgently needed part. This study deals with the process support method based on a system using a 3D simulator to improve the efficiency of the piping process. The 3D simulator is based on the Unity3D engine and can be simulated by considering the classification and priority of 3D models by the piping process in the system. Further, it makes it possible to visualize progress information of the process. In addition, the punch content can be displayed on the 3D model after the pipe inspection. Finally, in supporting the data in relation to the piping process, it is considered that 3D-simulator-supported piping installing could improve the work efficiency by more than 99% compared to the existing method.

2중 인버터 시스템을 갖는 해상용 풍력발전기의 3상 평형성에 관한 연구 (A Study on 3-Phase Balance of Offshore Wind Generator with Dual Inverter System)

  • 서장호
    • 조명전기설비학회논문지
    • /
    • 제27권6호
    • /
    • pp.23-30
    • /
    • 2013
  • This paper shows the method of winding connection and the balance of three phase of dual inverter systems used for offshore wind power generator. In order to satisfy low cost manufacturing of large scaled wind generator, the number of slot per pole per phase should be reduced. For this reason, in this research, the number is selected as '1' which is the minimum number that stator can have. Based on the prototype machine, three types of machine for the analysis are selected, and various performances especially in terms of electrically balanced condition are also investigated. Moreover, in this paper, new inductance modeling of dual 3-phase considering cross-coupling between two inverter systems is proposed. The several inductances such as mutual-, synchronous inductances are studied. By using FEA, based on calculated the flux linkage of d and q-axis, the validity of the proposed inductance modeling is confirmed.

해양 스태빙 가이드 설계 고찰 (Study on Offshore Stabbing Guide design)

  • 조철희;홍성근
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1999년도 봄 학술발표회 논문집
    • /
    • pp.69-77
    • /
    • 1999
  • The stabbing guide is often used to guide an add-on pile into an existing pile in offshore jacket installation. It provides a pile alignment for a welding tie-in in static condition as well. Even stabbing guide is an essential component in pile installation, it is not considered as a permanent offshore structure. In this regard, there is not a define design guideline proposed. In API RP 2A WSD, it briefly define the design considerations of stabbing guide. The failure of stabbing guide can cause a greate economical loss and a serious impact to the project schedule. Stabbing guide design should consider many factors considering actual work conditions for both static and dynamic situations. In the paper, a design method is proposed by appling the plate theory and it is confirmed numerically with FEM modeling. The geometry of stabbing guide is assumed as a cylinder shape with various wall thickness and effective length. The various thickness, effective length and pile size are compared for stable stabbing guide design.

  • PDF

Performance of novel dynamic installed anchors during installation and monotonic pullout

  • Kim, Youngho;Rosher, Lachlan Thomas
    • Geomechanics and Engineering
    • /
    • 제18권2호
    • /
    • pp.153-159
    • /
    • 2019
  • This paper examines the results from three-dimensional dynamic finite element analysis undertaken to develop a new dynamically installed anchor (DIA). Several candidate shapes of new DIAs were selected after an investigation into previous researches of existing DIA designs. The performances of selected DIAs during the installation and loading in non-homogeneous clay were investigated through large deformation finite element (LDFE) analyses. Findings were compared to the current anchors in operation (i.e., Torpedo and Omni-Max DIA) to assess the viability of the new designs in the field. Overall, the anchor embedment depths of the novel DIAs lied under the results of OMNI-Max DIA. And also, the tracked anchor trajectory confirmed that, the novel DIAs dove deeper with stiffer travelling angle, compared to the OMNI-Max DIA. These elements are more critical and beneficial especially in a field where the achieved embedment depths are generally low.

Swell description for Bonga offshore Nigeria location

  • Olugbenga, Akinsanya Akinyemi;Gudmestad, Ove Tobias;Agbakwuru, Jasper
    • Ocean Systems Engineering
    • /
    • 제7권4호
    • /
    • pp.345-369
    • /
    • 2017
  • The ocean environment offshore West Africa is considered to be mild. However, the generated swell from distant North and South Atlantic during austral winter and summer can reach high wave amplitudes with relatively low wave periods or low wave amplitudes with long wave periods, the later can be a crucial scenario to consider when the assessment of vessel resonance is of importance. Most offshore operations, which include offshore drilling, and installation in West Africa, are carried out from floating systems. The response of these systems and performance are governed by characteristics, such as amplitude and frequency of the wave and swell seas. It is therefore important to fully understand the sea conditions offshore Nigeria. This study covers the description of the swell sea offshore Nigeria using Bonga offshore wave measurements collected from the directional wave-rider (DWR), positioned at the Bonga site off the coast of Nigeria.

해양플랜트 배관재 공정관리 방법에 관한 연구 (A Study on Process Management Method of Offshore Plant Piping Material)

  • 박중구;우종훈
    • 대한조선학회논문집
    • /
    • 제55권2호
    • /
    • pp.124-135
    • /
    • 2018
  • In order to secure manufacturing competitiveness of offshore plants, piping process is one of the most important processes. This study is about the design of management system for piping materials manufacturing of the offshore plant. As a result of the study, we analyzed the system and algorithms needed for the processing of piping material products and designed the structure of the entire management system. We conducted a process analysis of the design, manufacturing and installation processes. And also we proposed a system structure to improve the various problems that have come out. We also proposed an algorithm to determine the delivery order of the pipe spools, and proposed a raw material management system for the manufacturing of the pipe spools. And we designed a manufacturing process management system to manage the risk of pipe materials delivery. And finally we proposed a data structure for the installation process management system. The data structures and algorithms were actually implemented, and applied the actual process data to verify the effect of the system.

Suction Pile 공법 개요 및 그 적용 (Introduction of Suction Pile Technology)

  • 조영기;방상철;박중배;곽대진
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2001년도 지반환경 및 준설매립에관한 학술세미나
    • /
    • pp.110-121
    • /
    • 2001
  • The interest in suction piles by the oil industry was risen in the middle of 1980's. Recently, suction piles have been applied increasingly in offshore engineering due to its low cost, simplicity, efficiency, and reliability. Suction piles have normally been used as anchors of floating structures and foundations of marine structures in deep-water locations. Suction piles have several technical advantages over conventional piles and anchors; fast and easy installation at any depth of water, extremely large resistance due to its huge size, and easy retrieval by applying a positive suction pressure inside the pile, etc. Daewoo E&C Co., Ltd. has conducted a series of field suction pile installation and loading tests inside the Okpo harbor located in Geojedo and the Onsan harbor in Ulsan, Korea, during the summer of 2001, which may provide additional validation of the analytical solutions previously developed by the US Naval Facilities Engineering Service Center. This is a brief description of the general mechanisms of suction pile installation and loading capacity based on the study conducted by the US Navy and Daewoo E&C Co., Ltd.

  • PDF

Feasibility study for wrap-buoy assisted wet-tow and stepwise installation of mono-bucket foundation for 15 MW offshore wind turbine

  • Ikjae, Lee;Moohyun, Kim
    • Ocean Systems Engineering
    • /
    • 제12권4호
    • /
    • pp.413-437
    • /
    • 2022
  • An innovative concept for wet-transportation and stepwise installation of mono-bucket foundation for 15 MW offshore wind turbine is proposed. Case studies for two different mono-bucket and wrap-buoy dimensions are conducted and their hydrostatic and hydrodynamic performances are compared for both wet-towing and lowering operations. The intact stability and transient responses are analyzed in detail for various stages of lowering operation. Wave-induced motion statistics during wet tow in sea state 4 (highest operational window) are checked. The proposed concept is found to be feasible and can be an alternative cost-effective solution without using heavy-lift crane vessel in practice.

해상풍력단지의 내부 계통망 구성을 위한 신뢰도 평가에 관한 연구 (A Study on Reliability Evaluation for Constructing Inner Grid of Offshore Wind Farm)

  • 배인수;신제석;김진오
    • 조명전기설비학회논문지
    • /
    • 제27권11호
    • /
    • pp.89-95
    • /
    • 2013
  • In resent years, Offshore Wind Farm (OWF) is being actively developed. Typically, OWF has a better wind resource than onshore one, but also have a very high investment cost and maintenance cost. Furthermore, due to a difficulty of geographical access, OWF can be affected by the failure for a longer time. As the result, OWF has a higher loss cost. Therefore, a reliability evaluation should be performed more carefully at OWF planning stage. In this paper, a methodology for the reliability evaluation on inner grid is suggested. Inner grid connects wind turbines via submarine cables and transfers power to offshore substation. According to location of the faulted cable under layouts of inner grid, the transfer ability of inner grid is influenced. In order to indicate the transfer ability of inner grid, several indices are introduced such as PNDR, EEND and EENDC. To demonstrate the methodology described in this paper, diversity case studies were performed.