• Title/Summary/Keyword: Off-site construction

검색결과 124건 처리시간 0.029초

프리캐스트 콘크리트 모듈러 개발 및 현장적용에 관한 연구 (A Study on the Development of Precast Concrete Modular and its Application Onsite)

  • 배규웅;부윤섭;신상민
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.27-28
    • /
    • 2023
  • Currently, the Off-Site Construction (OSC) construction method, which emphasizes the minimization of field work, is being emphasized at construction sites due to the lack of construction skilled manpower, extreme weather, and the Severe Disaster Punishment Act. In this study, we developed a stacked PC modular, which is a method of stacking PC modules, and solved the lifting problem by reducing the weight of the unit module, which is emerging as the biggest disadvantage of PC modules, to around 20 tons. For the connection between modules, structural safety was secured through repeated history tests of the wall and slab connection. Walls and slabs satisfied all statutory fire resistance times through fire resistance tests, and residential performance was evaluated to be satisfactory through mock-up demonstration. The developed PC modular has been applied to the construction of commercial houses, detached houses, shopping malls, churches, etc., and has design results for many buildings such as dormitories, detached houses with 4 floors or more, and resorts, so it is expected that an atmosphere of revitalization of construction methods will be created.

  • PDF

공동주택 OSC공법 적용 확산을 위한 공사비 분야 경제성 개선 요인 분석 - PC 부재 설계, 제작, 운송, 시공을 중심으로 - (Analysis of Factors for Improvement of Economic Feasibility of Construction Cost to Spread Application of OSC Construction Method for Apartment Housing)

  • 윤원건;신은영;강태경
    • 한국건설관리학회논문집
    • /
    • 제22권6호
    • /
    • pp.55-63
    • /
    • 2021
  • 최근 건설공사 노동 및 현장 여건 변화에 따라 전통적인 현장 노동집약적 건설생산방식의 문제가 제기됨에 따라 이에 대한 대안으로 OSC 공법이 점차 확산되고 있다. 공동주택에서도 PC공법 적용이 지하주차장을 중심으로 확대되고 있으나 재래식 거푸집 공법에 비해 높은 원가 구조가 문제가 되고 있다. 본 연구에서는 공동주택 공법 결정에 있어 핵심이 되는 경제성 평가에 있어 공사비 산정에 영향을 미치는 요인들을 국내·외 문헌고찰과 전문가자문을 통해 도출하고, PC공사 설계, 제작/운송, 시공 단계별 각 요인들의 중요도를 산업계 전문가를 대상으로한 의견조사를 통해 분석하였다. 공사비 절감 방안들은 설계 및 제작공정 개선에서 주로 도출되었으며, 이를 종합하여 PC공법 적용시 경제성 개선을 위한 주요 전략을 제시하였다. 본 연구에서 도출된 PC공법의 공사비 영향요인 및 개선 방안들은 향후 공동주택 PC공법 적용 확산을 위한 기술 개발에 방향성이 될 수 있을 것으로 기대된다.

Study on Dose Rate on the Surface of Cask Packed with Activated Cut-off Pieces from Decommissioned Nuclear Power Plant

  • Park, Kwang Soo;Kim, Hae Woong;Sohn, Hee Dong;Kim, Nam Kyun;Lee, Chung Kyu;Lee, Yun;Lee, Ji Hoon;Hwang, Young Hwan;Lee, Mi Hyun;Lee, Dong Kyu;Jung, Duk Woon
    • Journal of Radiation Protection and Research
    • /
    • 제45권4호
    • /
    • pp.178-186
    • /
    • 2020
  • Background: Reactor pressure vessel (RV) with internals (RVI) are activated structures by neutron irradiation and volume contaminated wastes. Thus, to develop safe and optimized disposal plan for them at a disposal site, it is important to perform exact activation calculation and evaluate the dose rate on the surface of casks which contain cut-off pieces. Materials and Methods: RV and RVI are subjected to neutron activation calculation via Monte Carlo methodology with MCNP6 and ORIGEN-S program-neutron flux, isotopic specific activity, and gamma spectrum calculation on each component of RV and RVI, and dose rate evaluation with MCNP6. Results and Discussion: Through neutron activation analysis, dose rate is evaluated for the casks containing cut-off pieces produced from decommissioned RV and RVI. For RV cut-off ones, the highest value of dose rate on the surface of cask is 6.97 × 10-1 mSv/hr and 2 m from it is 3.03 × 10-2 mSv/hr. For RVI cut-off ones, on the surface of it is 0.166 × 10-1 mSv/hr and 2 m from it is 1.04 × 10-1 mSv/hr. Dose rates for various RV and RVI cut-off pieces distributed lower than the limit except the one of 2 m from the cask surface of RVI. It needs to adjust contents in cask which carries highly radioactive components in order to decrease thickness of cask. Conclusion: Two types of casks are considered in this paper: box type for very-low-level waste (VLLW) as well as low-level waste (LLW) and cylinder type for intermediate-level waste (ILW). The results will contribute to the development of optimal loading plans for RV and RVI cut-off pieces during the decommissioning of nuclear power plant that can be used to prepare radioactive waste disposal plans for the different types of wastes-ILW, LLW, and VLLW.

Lessons Learned during the Early Phases of a Modular Project: A Case Study of UNLV's Solar Decathlon 2020 Project

  • Choi, Jin Ouk;Lee, Seungtaek;Weber, Eric
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.543-550
    • /
    • 2022
  • The U.S. Department of Energy conducts the Solar Decathlon competition as a student-based achievement that encourages sustainable design with energy efficiency and solar energy technologies. In the 2020 competition, the University of Nevada, Las Vegas (UNLV) team designed, fabricated, and constructed a net-zero modular house that applies innovative and highly efficient building technologies. This paper focused on the lessons learned during the early phases of this ongoing modular project. The research methodology included obtaining feedback from key project participants using a well-structured questionnaire. The results showed that the major items/challenges in the project's planning phase included selecting the modular size, planning the construction system, planning the materials and procurement, estimating costs and duration, selecting a fabricator, collaboration and communication, safety, and planning module transportation. These findings will help modular practitioners and future Solar Decathlon competition participants better understand how and what factors they should consider most during the early phases through the lessons learned.

  • PDF

PC부재의 생산계획 수립에 영향을 미치는 요인 고찰에 관한 연구 (A Study on the Consideration for Factors Affecting Production Plan Establishment of Precast Concrete Members)

  • 전영훈;신은영;윤원건;김경훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.253-254
    • /
    • 2023
  • The production plan of Precast Concrete members is closely related to the assembly plan of Precast Concrete members, and is an important management factor for the process planning of Precast Concrete construction. This may cause a delay in the construction period due to manufacturing errors occurring in the production process of members and transportation errors according to the production sequence. Therefore, it is necessary to have an efficient production plan for Precast Concrete members that can produce the necessary quantity from the point of assembly of the members and supply them in a timely manner. This study is a basic study for establishing a production plan for Precast Concrete members, and the purpose of the study is to examine the factors that affect the establishment of a production plan for Precast Concrete members. In this study, the influencing factors according to the production method and conditions when establishing a production plan for Precast Concrete members were considered. In the future, correlation analysis among influencing factors will be carried out, and it is expected that it will be used as basic data for schedule management of Precast Concrete construction and derivation of construction period calculation standards.

  • PDF

Low Impact Urban Development For Climate Change and Natural Disaster Prevention

  • Lee, Jung-Min;Jin, Kyu-Nam;Sim, Young-Jong;Kim, Hyo-Jin
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.54-55
    • /
    • 2015
  • Increase of impervious areas due to expansion of housing area, commercial and business building of urban is resulting in property change of stormwater runoff. Also, rapid urbanization and heavy rain due to climate change lead to urban flood and debris flow damage. In 2010 and 2011, Seoul had experienced shocking flooding damages by heavy rain. All these have led to increased interest in applying LID and decentralized rainwater management as a means of urban hydrologic cycle restoration and Natural Disaster Prevention such as flooding and so on. Urban development is a cause of expansion of impervious area. It reduces infiltration of rain water and may increase runoff volume from storms. Low Impact Development (LID) methods is to mimic the predevelopment site hydrology by using site design techniques that store, infiltrate, evaporate, detain runoff, and reduction flooding. Use of these techniques helps to reduce off-site runoff and ensure adequate groundwater recharge. The contents of this paper include a hydrologic analysis on a site and an evaluation of flooding reduction effect of LID practice facilities planned on the site. The region of this Case study is LID Rainwater Management Demonstration District in A-new town and P-new town, Korea. LID Practice facilities were designed on the area of rainwater management demonstration district in new town. We performed analysis of reduction effect about flood discharge. SWMM5 has been developed as a model to analyze the hydrologic impacts of LID facilities. For this study, we used weather data for around 38 years from January 1973 to August 2014 collected from the new town City Observatory near the district. Using the weather data, we performed continuous simulation of urban runoff in order to analyze impacts on the Stream from the development of the district and the installation of LID facilities. This is a new approach to stormwater management system which is different from existing end-of-pipe type management system. We suggest that LID should be discussed as a efficient method of urban disasters and climate change control in future land use, sewer and stormwater management planning.

  • PDF

레일부유궤도 시스템에 대한 성능 평가 (Performance Evaluation On Floating Rail Track System)

  • 김순철;강정옥;지윤배;한광섭;전병찬
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.756-762
    • /
    • 2004
  • Up to now, the only way is Floating Slab Track System, which cuts off vibration by installing spring between concrete slab and ground for the lines of particularly requiring attenuating vibration. The weak point of Floating Slab Track System is large increase of construction cost because normally the structure is getting bigger. In regards to this matter, Floating Rail Track System has been developed, which cuts off vibration by floating the first cause of vibration rail, and the system is in operation. In the thesis, the application of new attenuating vibration track system has been confirmed by studying theoretical background of Floating Rail Track System and evaluating dynamic deflection of track and attenuating of noise and vibration performance through various measurements from laboratory tests and site inspection.

  • PDF

전자뇌관을 이용한 수평방향 데크차지 발파공법의 효율성검토 연구 (A Study on the Efficiency of Horizontal Direction Deck-charge Blasting Method Using Electronic Detonator)

  • 윤지선;한석주;배상훈
    • 한국지반공학회논문집
    • /
    • 제29권4호
    • /
    • pp.5-11
    • /
    • 2013
  • 도심지 근접시공 발파에는 진동 소음에 따른 민원의 문제가 주요시된다. 발파 진동 소음을 줄이기 위해 최근에 국내에 도입된 전자뇌관을 사용하여 데크차지 공법에 적용하면 cut off 등과 같은 현상이 없어져서 안전한 시공이 가능하고, 또한 수평방향으로 발파가 가능해져서 대규모 발파가 가능해진다. 본 연구에서는 전자뇌관을 사용한 수평방향데크차지 공법의 효율을 기존 공법의 것과 비교해보고, 현장적용 가능성을 평가해보았다. 그 결과 발파 진동 소음과 2차 파쇄량의 감소를 확인하였고, 뿐만 아니라 전반적으로 발파 효율이 증가하여 진동 규제 기준치 내에서 대규모 발파가 가능함을 확인하였다.

유닛 모듈러 공법의 효율성 확보를 위한 공장제작, 운반, 현장설치의 최적 공정 제안 (A Proposal for Optimizing Unit Modular System Process to Improve Efficiency in Off-site Manufacture, Transportation and On-site Installation)

  • 이광복;김경래;신동우;차희성
    • 한국건설관리학회논문집
    • /
    • 제12권6호
    • /
    • pp.14-21
    • /
    • 2011
  • 모듈러 공법은 전체공정의 50%~90%를 공장에서 제작하여 이를 운반하여 현장에서 설치하는 공법이다. 이 공법은 현장에서 공정을 최소화하고 공장에서 작업을 극대화하여 공기를 단축하고 품질을 향상시킬 수 있다. 모듈러 공법으로 시공하면, 사용연한이 지나 건축물 철거시 일부 또는 전체를 재사용이 가능하기 때문에 건축폐기물까지 줄일 수 있는 친환경적인 공법이라고 할 수 있다. 이 모듈러 공법은 최근 수요가 증가하는 소형주택과 한국전쟁 당시 지어진 전방의 노후화된 병영시설의 교체에 적합한 공법이다. 경량철골을 사용한 모듈러 공법의 국내 시공 사례는 2003년 신기초등학교를 시작으로 군 병영시설에 확대 적용되고 있지만 아직까지 시장 초기단계이다. 따라서 범용 적으로 활용이 가능한 모듈 유닛의 표준과 공정의 표준정립이 시급한 상태이다. 본 연구에서는 기존 독신숙소의 신축 사례를 바탕으로 1인 숙소를 표준 모듈로 가정하고 모듈의 공장제작, 운반, 현장설치의 모듈러 공법의 최단 공사기간내의 최소 공사비 투입이 가능한 표준 공정을 제안하고자 한다. 공장에서 완성품을 제작하는 것이 가장 합리적이지만 운반시 하자발생을 감안한다면 공장제작비율 80%일 때 가장 합리적인 것으로 도출 되었다.

이중 복합터널 상부구조물의 진동에 대한 안정성 평가 (Estizmation of Structure Stability on the Ground to Vibration from Dual Composite Tunnels)

  • 신승목;장연수;이우진;권순정
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.1244-1250
    • /
    • 2008
  • The site of interest is a residence redevelopment area which has excavation construction with cut-off walls. The site is located over Dong-Mang-Bong tunnel and Seoul No. 6 subway tunnel. This study analyzed numerically the influence of vibrations from No. 6 subway tunnel to the basement of the redeveloped apartment away from the distance about 11m. Kyoung-bu highspeed railway's time history model with linearly reduced maximum acceleration is applied to take into the subway maximum speed of 75km/h. The maximum velocity of vibration for the cross section of the interest was estimated as 0.28cm/sec which satisfied the allowable standard of 0.5cm/sec for apartment and residence of Seoul.

  • PDF