• Title/Summary/Keyword: Off-line testing

Search Result 47, Processing Time 0.04 seconds

On-line and Off-line Partial Discharge Monitoring System with HVAC Testing (HVAC에 의한 On-line, Off-line PD 모니터링)

  • Choi, Yong-Sung;Lee, Kyung-Sup
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2008.04c
    • /
    • pp.111-114
    • /
    • 2008
  • The paper considers the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PD) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PD testing delivers the best possible information about defects and enables the classification of the risk. Because alternating voltage (AC) is the most important test voltage, the AC generation on site is considered. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PD measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers - is described.

  • PDF

A Research Trend on On-Line/Off-Line PD Insulation Diagnostic System (온라인 및 오프라인 PD 모니터링에 관한 연구 동향)

  • Choo, Jong-Hoon;Hong, Chang-Il;Choi, Yong-Sung;Lee, Kyung-Sup
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.2008-2009
    • /
    • 2007
  • The paper considers the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PD) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PD testing delivers the best possible information about defects and enables the classification of the risk. Because alternating voltage (AC) is the most important test voltage, the AC generation on site is considered. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PD measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers - is introduced.

  • PDF

Development of a Headlamp Testing System for Automobile Headlamp Beam Pattern Recognition (차량의 헤드램프 빔 패턴 인식을 위한 헤드램프 검사 시스템 개발)

  • Kim, Junghoon;Cho, Chiwoon
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.22 no.7
    • /
    • pp.23-30
    • /
    • 2014
  • "Cut off line" in automotive passing beam has very important safety function because it serves for headlamp aiming. Headlights that are aimed incorrectly will not only perform poorly but also offend oncoming traffic. In addition, an objective definition of cut off line in low beam is necessary, since a requirement for correct aiming of the beams is specified within all the existing regulations. Accordingly, headlight regulations are requirements that automobiles must satisfy in order to be sold in a particular country. In this study, a more advanced recognition method for the cut off lines of the various headlamps commonly used in Europe, North America, and domestic is suggested and a headlamp testing system is developed to adjust the beam to the country-specific regulation. This system uses image processing technology to detect the cut off lines in the beam patterns of halogen headlamps, high-intensity discharge headlamps, and light-emitting diode headlamps as well.

Analysis and lest of On-line and off-line PD Testing for High Voltage Rotating Machines Stator Windings using Ceramic Coupler (세라믹 커플러를 이용한 고전압회전기 고정자권선의 On-line 및 off-line 부분방전 특성 시험 및 분석)

  • Oh, Bong-Keun;Kim, Hyun-Il;Kang, Seong-Hwa;Lim, Kee-Joe
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.20 no.10
    • /
    • pp.895-900
    • /
    • 2007
  • Partial discharge(PD) test can be performed either when the rotating machine is not operating(off-line) or during normal machine operation(on-line). This paper presents an on-line and off-line PD test on a large hydro-generator and induction motor using the same PD acquisition system(PDAS) and ceramic coupler(CC) sensor. PD signal characteristics of CC sensor proved similar with that of epoxy mica coupler(EMC) sensor as a results of PD test for simulated defect winding and frequency response test. A comparison of on-line and off-line PD test for PD characteristic parameters-phase resolved PD(PRPD), maximum PD value(Qmax) and PD occurrence energy(POE)-indicated that on-line PD test could reliably and effectively diagnose insulation conditions which were verified by off-line PD test.

Analysis of Off-Line and On-Line Partial Discharge in High Voltage Motor Stator Windings

  • Kim, Hee-Dong;Kong, Tae-Sik;Lee, Sang-Kil;Kim, Beom-Soo;Kim, Doo-Young
    • Journal of Electrical Engineering and Technology
    • /
    • v.10 no.3
    • /
    • pp.1086-1092
    • /
    • 2015
  • The off-line and on-line partial discharge (PD) in the stator winding of three high-voltage (HV) motors (1,400 HP, 6.6 kV) is measured and analyzed in this paper. The off-line PD is measured at high values between 24,300 ~ 36,100 pC after 18 years of motor operation. Spare replacement motors were not available for testing the degree of deterioration of the stator windings in standstill status. Therefore, on-line periodic analysis was conducted to monitor the trend of PD after installing a ceramic sensor (110 pF, 6.6 kV) in the terminal box for each phase of each motor. In the stator winding of the No.1 and No.2 HV motors, which showed high magnitudes of off-line PD and low magnitudes of on-line PD, defects are expected to appear in the neutral end of the winding. On the contrary, in the stator windings of the No.3 HV motor, which exhibits high off-line and on-line PD magnitude, defects are expected to appear in the terminal end of the winding where a voltage close to the phase voltage is applied.

Trend in Off-Line PD Monitoring with HVAC Testing (배전반 설비의 온라인 모니터링 및 진단의 동향)

  • Yun, Ju-Ho;Hong, Chang-Il;Hwang, Jong-Sun;Choi, Yong-Sung;Lee, Kyung-Sup
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2007.06a
    • /
    • pp.529-530
    • /
    • 2007
  • The paper considers the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PD) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PD testing delivers the best possible information about defects and enables the classification of the risk. Because alternating voltage (AC) is the most important test voltage, the AC generation on site is considered. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PD measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers - is described.

  • PDF

Assessment of Insulation Condition in Gas Turbine Generator Stator Windings (가스터빈 발전기 고정자 권선의 절연상태 평가)

  • Kim, Hee-Dong;Yang, Gyu-Hyun;Ju, Young-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.8
    • /
    • pp.1423-1428
    • /
    • 2010
  • The results of off-line and on-line diagnostic tests performed on the stator winding of an air-cooled gas turbine(G/T) generator are reported in this paper. Off-line diagnostic tests included measurements of the ac current, dissipation factor(tan${\delta}$), and partial discharge(PD). Six epoxy-mica capacitors were installed in the three phases of G/T generator for performing on-line diagnostic testing with the turbine generator analyzer(TGA). The TGA showed that the normalized quantity number(NQN) and the PD magnitude($Q_m$) were high in phase A of the stator winding. Internal discharges were generated in phases B and C, and slot discharge occurred in phase A. According to the trend analyses of the NQN and $Q_m$ values available for insulation condition assessment for G/T generator stator windings, it was concluded that phases B and C were in good condition, whereas phase A has been significantly deteriorated.

On-line Condition Monitoring for Electric Equipments (전력 설비 시스템의 온라인 감시)

  • Choi, Yong-Sung;Lee, Kyung-Sup
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2008.04c
    • /
    • pp.103-105
    • /
    • 2008
  • In, this paper, we consider the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PO) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PO testing delivers the best possible information about defects and enables the classification of the risk. Because alternating voltage (AC) is the most important test voltage, the AC generation on site is considered. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PO measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers - is described.

  • PDF

On-Line System for Partial Monitoring Discharge (온라인 부분방전 감시 시스템)

  • Choi, Yong-Sung;Hwang, Jong-Sun;Lee, Kyung-Sup
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.2114-2115
    • /
    • 2008
  • We consider the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PD) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PD testing delivers the best possible information about defects and enables the classification of the risk. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PD measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers is described.

  • PDF

Development of Automatic Data Acquisition & Remote Diagnostic System for Improving Efficiency of High-Voltage Motors Off-Line Insulation Diagnostic Test (고압전동기 Off-Line 절연진단시험 효율개선을 위한 데이터자동취득 및 원격진단시스템 구축)

  • Kang, Sang-Mu;Kang, Dae-Jeong;Han, Hyun-Seok;Kim, Won-Kyung
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.707-708
    • /
    • 2015
  • This paper proposes a method for improving efficiency of high-voltage motors off-line insulation diagnostic test. The conventional manual test method has measurement errors and excessive processing time. We developed the KITAS system and solved these problems by using the instrument remote control and communication technology. The result of proficiency testing by interlaboratory comparisons using Power Factor Tip-Up test was '${\mid}E_n{\mid}$ < 1'. It was possible to confirm the validity of acquired data from the KITAS and establish a remote diagnostic system for easy access without physical limitations.

  • PDF