• Title/Summary/Keyword: O-2 Anchorge

Search Result 1, Processing Time 0.018 seconds

Improvement Plan on Operation of O-2 Anchorage at the Busan North Port (부산 북항 O-2 정박지의 운영개선 방안)

  • Song, Gye-Eui
    • Journal of Korea Port Economic Association
    • /
    • v.25 no.1
    • /
    • pp.29-46
    • /
    • 2009
  • According to construction work of No. 2 Lotte world, the alternative pier is under construction in Dongsam-dong Yeongdo-gu to accommodate small boats. As a result of that, in order to procure route of small boats passage,0-2 Anchorage used to bunkering or waiting for berth should be reduced, 220m. It is expected that the risk of passage and congestion around the anchorage could be increased because of the traffic of small boat using the alternative pier. Therefore, it is needed to enlarge the O-2 Anchorage 250m toward to inner breakwater. According to result of analyzing traffic circumstance and weather condition of anchorage near the Busan inner fairway, and to procure of alternative anchorage in order to resolve the problem caused by reduction of O-2 Anchorage, no problems incurred. In conclusion, reduction & enlargement of area of new O-2 Anchorage is expected to resolving of congestion & reducing of risk of traffic at O-2 Anchorage, and to operating O-2 Anchorage, efficiently.

  • PDF