• Title/Summary/Keyword: Number of Boring

Search Result 37, Processing Time 0.022 seconds

Experimental verification for prediction method of anomaly ahead of tunnel face by using electrical resistivity tomography

  • Lee, Kang-Hyun;Park, Jin-Ho;Park, Jeongjun;Lee, In-Mo;Lee, Seok-Won
    • Geomechanics and Engineering
    • /
    • v.20 no.6
    • /
    • pp.475-484
    • /
    • 2020
  • The prediction of the ground conditions ahead of a tunnel face is very important, especially for tunnel boring machine (TBM) tunneling, because encountering unexpected anomalies during tunnel excavation can cause a considerable loss of time and money. Several prediction techniques, such as BEAM, TSP, and GPR, have been suggested. However, these methods have various shortcomings, such as low accuracy and low resolution. Most studies on electrical resistivity tomography surveys have been conducted using numerical simulation programs, but laboratory experiments were just a few. Furthermore, most studies of scaled model tests on electrical resistivity tomography were conducted only on the ground surface, which is a different environment as compared to that of mechanized tunneling. This study performed a laboratory experimental test to extend and verify a prediction method proposed by Lee et al., which used electrical resistivity tomography to predict the ground conditions ahead of a tunnel face in TBM tunneling environments. The results showed that the modified dipole-dipole array is better than the other arrays in terms of predicting the location and shape of the anomalies ahead of the tunnel face. Having longer upper and lower borehole lengths led to better accuracy of the survey. However, the number and length of boreholes should be properly controlled according to the field environments in practice. Finally, a modified and verified technique to predict the ground conditions ahead of a tunnel face during TBM tunneling is proposed.

Suggestion of New Rock Classification Method Using the Existing Classification Method (기존의 암반분류법의 조합에 의한 새로운 암반평가법의 제안)

  • SunWoo Choon;Jung Yong-Bok
    • Explosives and Blasting
    • /
    • v.24 no.1
    • /
    • pp.21-28
    • /
    • 2006
  • Rock mass classification systems such as RMR and Q system have been widely served as a simple empirical approach for the design of various rock mass structures in the stage of site survey as well as under the construction. For the RQD determination, the boring is partially carried out and what is more, the survey boring is not normally carried out under construction. Therefore RQD is frequently determined by empirical method or indirect method. Since it is difficult to determine the discontinuity characteristics such as RQD, spacing, persistence, filling and so on, it is essential to develop suitable and simple systems without drilled core and a cert 없 n number of representative parameters. One of the primary objectives of the classification systems for a practicing engineer has been to make it simple to use as a preliminary design tool for the structures in rock mass. In the present study, the modifications for both the RMR and GSI system are suggested by authors to introduce new classification system as well as to improve the scope of some of the existing classification systems for a practicing engineer.

STUDIES ON THE MORTALITY OF THE YOUNG BIVALVES, MERETRIX LUSORIA (1) Boring Rates of Drills on the Young Bivalve, Meretrix lusoria (대합 Meretrix lusoria 치패의 폐사에 관한 연구 (1) 대합치패의 천공복족류 Neverita didyma, Natica severa에 의한 천공률에 관하여)

  • LEE Jung Jae
    • Korean Journal of Fisheries and Aquatic Sciences
    • /
    • v.2 no.1
    • /
    • pp.63-70
    • /
    • 1969
  • 1. This paper deals with the natural mortality of the early young bivalve, Meretrix lusoria, (less than 13mm in shell length) and the perforations bored in the bivalve by bering snails, Neverita didyma and Natica severa. The investigation was carried out in the Kunsan area and in the laboratory from May to October of 1968. 2. The natural mortality of the field population during this period was $12.1\%$ and among this number $38.1\%$ were drilled by boring snails. 3. The common species of the Naticid gastropods, boring snails-Neverite didyma and Natice severa - are encountered in the habitat of M. lusoria. The perforations drilled by these species were broadly bevelled. 4. The location of the holes on the valves varied widely, while most of holes on the valves were located at a relatively definite umbo position. 5. The inner and outer diameters of the holes varied in proportion to the shell length of the clam; each ranging in shell length from 1 to 3mm, 3 to 6mm, and 6 to 13mm, and the outer diameters were 0.4-0.5mm, 0.7-0.9mm and 0.9-1.2mm. On the other hand, the ratio of the inner and outer diameters differed in proportion to the shell length of the clam. 6. Predation rates of Neverita didyma was much greater at night than during the day at room temperature. An average of 1.7 young clams was drilled and consumed, per snail, per day. This rate was greater than that of the Natica severa. 7 Predation rates varied in proportion to the shell length of the clam and the shell height of the snails.

  • PDF

A Study on the Precision Hole Machiningof Pre Hardened Mould Steel (프리하든 금형강의 정밀 홀 가공에 관한 연구)

  • Lee, Seung-Chul;Cho, Gyu-Jae;Park, Jong-Nam
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.11 no.2
    • /
    • pp.98-104
    • /
    • 2012
  • In this paper, precision processing is carried out for the pre hardened steel(HRC 54), which is one of injection mould materials. Processing characteristics are estimated according to the number of tool cutting blade and roundness is observed by the 3-Dimensional measuring machine. The surface roughness affected by the wire electric discharge machining are measured. Cutting component force of STAVOX is the highest in condition of 2F processing because load per a blade of cutting tool is high. Especially, the difference in Fz is over 20N by cutting load. The slower spindle rotation speed and tool feed rate are, the better cutting component force is. The roundness of hole processed in condition of 4F is good because feed rate is able to be fast. When rotation speed is increased, the surface roughness is decreased. The surface roughness acquired in condition of 2F processing is higher about 50% than 4F processing.

Disc Cutter Consumptions Prediction on Applying Shield TBM at the Han Riverbed Tunnel (한강하저터널의 쉴드TBM 적용시 디스크 커터 소모량 예측과 소모량)

  • Choi, Jung-Myung;Jung, Hyuk-Sang;Chun, Byung-Sik;Lee, Yong-Joo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.562-570
    • /
    • 2010
  • This study was conducted to estimate the number of disc cutter consumption and to predict amount of disc cutters when a shield TBM(Tunnel Boring Machine) of the Han Riverbed Tunnel was applied. In fact, it is almost impossible to change the machine after starting the excavation using the shield TBM method. Therefore, it is important to design an appropriate equipment in the shield method - an efficiency choice of the operation equipment plays a key role in the shield tunnel processing. For the above reason, the disc cutter consumption prediction is quite important so that the detailed analysis is required. A number of disc cutter consumption was predicted by the three methods, viz. KOMATSU, MITSUBISHI and NTNU. In addition, the predicted results were compared with field data. The prediction of disc cutter consumption showed that 237 for KOMATSU, 501 for MITSUBISHI, and 634 for NTNU, respectively. However, a total number of 1,263 disc cutter consumption were investigated during the tunnel construction. It was found that there was a huge difference between the predicted and real values of the disc cutter consumption. The more detailed investigation showed that the disc cutter was worn out bluntly in the northbound tunnel, meanwhile it was worn out sharply in the southbound tunnel. In particular, the disc cutter consumption in the southbound tunnel was increased rapidly because of rear abrasion for remaining mucks in the chamber.

  • PDF

A Study On The Reinforcing Effect Multibell Anchor Applied To The Cut Slope (비탈면에 적용된 다구근 앵커의 보강효과 연구)

  • Cha, Kyung-Sub;Kim, Seon-Ju;Kim, Tae-Hoon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.1286-1293
    • /
    • 2010
  • The ground anchor used in domestic area, which resists by adhesion between anchor body and the ground to the external force, seems not to be adequate for soft ground and urban area where the boundary between structures is close because the ground is disturbed and lost its strength during boring. In order to overcome such a shortcoming an expanded anchor system has been developed. The ground expansion is accomplished by means of Pulse Discharge Technology. In this technology, a high voltage of electricity is stored and discharged in milliseconds which induces high pressure acting on the ground. By making a couple of bulbs, a passive resistance as well as shaft resistance are mobilized, and therefore a higher pullout resistance comparing existing ground anchors is developed.In this study, a couple of full scale tests were conducted in order to figure out how much the resistance of an expanded anchor increases comparing to the straight. As a result, it was found that a remarkable increase in ultimate pullout capacity is observed for the soft ground and as the number of bulb increases. In addtion, as a result of applying to a cut slope reinforcement, it appeared that the length of fixed zone of anchor can be reduced effectively.

  • PDF

A Case Study on the Design of High Capacity Foundations for High-Rise Buildings (국외 초고층 건축물의 대형기초 적용 사례)

  • Cho, Sung-Han;Han, Byoung-Kwon;Lee, Je-Man;Kim, Tae-Bum
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2007.09a
    • /
    • pp.78-89
    • /
    • 2007
  • Two design examples of deep foundations for high-rise buildings on soft ground are introduced in this paper. The first one is a 54-story building in Ho-Chi-Minh city, Vietnam, which was designed to be founded on $2.8m{\times}1.0m$ barrette foundations with approximately 60m to 75m depth. Based on a number of design guides and existing load test data from the construction sites in Ho-Chi-Minh city, the capacity of a barrette foundation in sand or clay layered ground was calculated to be 17.2MN to 27.8MN depending on the installing depth. The second one is a 40-story building in Baku city, Azerbaijan, which was designed to be supported by 2.0m diameter bored pile foundations with approximately 23m depth. As analytical or empirical guides for the local ground conditions were very limited, the design procedure from the SNiP Code, one of Russian specifications, was adopted and used to calculate the pile capacity. The capacity of bored pile foundation in highly weathered soil was expected to be 14.8MN to 15.5MN depending on the boring depth.

  • PDF

Numerical simulations on electrical resistivity survey to predict mixed ground ahead of a TBM tunnel (TBM 터널 전방 복합지반 예측을 위한 전기 비저항 탐사의 수치해석적 연구)

  • Seunghun Yang;Hangseok Choi;Kibeom Kwon;Chaemin Hwang;Minkyu Kang
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.6
    • /
    • pp.403-421
    • /
    • 2023
  • As the number of underground structures has increased in recent decades, it has become crucial to predict geological hazards ahead of a tunnel face during tunnel construction. Consequently, this study developed a finite element (FE) numerical model to simulate electrical resistivity surveys in tunnel boring machine (TBM) operations for predicting mixed ground conditions in front of tunnel faces. The accuracy of the developed model was verified by comparing the numerical results not only with an analytical solution but also with experimental results. Using the developed model, a series of parametric studies were carried out to estimate the effect of geological conditions and sensor geometric configurations on electrical resistivity measurements. The results of these studies showed that both the interface slope and the difference in electrical resistivity between two different ground formations affect the patterns and variations in electrical resistivity observed during TBM excavation. Furthermore, it was revealed that selecting appropriate sensor spacing and optimizing the location of the electrode array were essential for enhancing the efficiency and accuracy of predictions related to mixed ground conditions. In conclusion, the developed model can serve as a powerful and reliable tool for predicting mixed ground conditions during TBM tunneling.

A TBM data-based ground prediction using deep neural network (심층 신경망을 이용한 TBM 데이터 기반의 굴착 지반 예측 연구)

  • Kim, Tae-Hwan;Kwak, No-Sang;Kim, Taek Kon;Jung, Sabum;Ko, Tae Young
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.1
    • /
    • pp.13-24
    • /
    • 2021
  • Tunnel boring machine (TBM) is widely used for tunnel excavation in hard rock and soft ground. In the perspective of TBM-based tunneling, one of the main challenges is to drive the machine optimally according to varying geological conditions, which could significantly lead to saving highly expensive costs by reducing the total operation time. Generally, drilling investigations are conducted to survey the geological ground before the TBM tunneling. However, it is difficult to provide the precise ground information over the whole tunnel path to operators because it acquires insufficient samples around the path sparsely and irregularly. To overcome this issue, in this study, we proposed a geological type classification system using the TBM operating data recorded in a 5 s sampling rate. We first categorized the various geological conditions (here, we limit to granite) as three geological types (i.e., rock, soil, and mixed type). Then, we applied the preprocessing methods including outlier rejection, normalization, and extracting input features, etc. We adopted a deep neural network (DNN), which has 6 hidden layers, to classify the geological types based on TBM operating data. We evaluated the classification system using the 10-fold cross-validation. Average classification accuracy presents the 75.4% (here, the total number of data were 388,639 samples). Our experimental results still need to improve accuracy but show that geology information classification technique based on TBM operating data could be utilized in the real environment to complement the sparse ground information.

Development of Distribution System for Enhancing Utilization of Geotechnical Information DB (지반정보 DB 활용향상을 위한 유통시스템 개발)

  • Jang, Yong-Gu;Lee, Sang-Hoon;Koo, Jee-Hee
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.10 no.1
    • /
    • pp.183-193
    • /
    • 2007
  • Geotechnical Information Database Project was began by Ministry of Construction Transport at the 1999, because many people need a sharing and reusing the geotechnical report in construction process. In the beginning, target was report of national highway construction, the whole of country has been target on since the 2005. Today, the 60,581 number of geotechnical data(counted by boring number) is maintained. In this study, Geotechnical Information Distribute System(GIDS) was developed, in order to improve practical use and to be connected to National Geographic Information Center. and program to be applicable to construction was suggested. GIDS is able to search/download geotechnical report with digital map by internet. This system is consisted of geotechnical data and metadata editor, registration tool, and web system. We expect that GIDS make a effect to improve geotechnical data management and to be use in all part of construction process.

  • PDF