• 제목/요약/키워드: New Project

검색결과 3,237건 처리시간 0.037초

면소마을 개발사업의 건조환경에의 영향과 개선 시사점 횡성군 우천면 우항1리의 경우 (Rural Development Projects and their Impacts on Built Environment; Case of Ucheon Myon-center Village)

  • 장성준
    • 농촌계획
    • /
    • 제5권1호
    • /
    • pp.66-75
    • /
    • 1999
  • The study intends to find out contents and impacts of rural development projects implemented by government in Ucheon myon-center village (Hoingseong-county) between 1989-1995. The projects in concern are Rural Industrial Estate Project(1989-90) and Rural Collective Village Project(1992-93), The restructuring of village plan introduced new construction and renewal of buildings that are required for a myon-center in general has to be. The study reveals some morphological patterns the village has and needs to be adjusted. As a conclusion, it proposes a conception of self-containment for a myon-center development. It is necessary that a project plan strategy should be based upon harmonious exploitation between old and new, flexible planning, and sense of technological alternatives.

  • PDF

Recent activities of superconducting power application in Japan

  • Akita, Shirabe
    • 한국초전도저온공학회:학술대회논문집
    • /
    • 한국초전도저온공학회 2001년도 학술대회 논문집
    • /
    • pp.131-131
    • /
    • 2001
  • FY2000, Japanese government has started three new projects on superconductive power application. Two are succeeding projects of flywheel energy storage and superconducting generator. The other one is fully new project on ac application of superconductivity. Therefore, there are four national projects in Japan on power application of superconductivity, including SMES project Though each project will be reviewed in detail in my talk, outlines are as follows; SMES : FY1999-FY2003, carried by ISTEC Superconducting generator: FY2000-FY2003, carried by Super-GM AC application: FY2000-FY2004, carried by Super-GM Flywheel energy storage: FY2000-FY2004 carried by ISTEC.

  • PDF

A new approach for resource allocation in project scheduling with variable-duration activities

  • 김수영;제진권;이상우
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1994년도 춘계공동학술대회논문집; 창원대학교; 08월 09일 Apr. 1994
    • /
    • pp.410-420
    • /
    • 1994
  • In many project-oriented production systems, e.g., shipyards or large-scale steel products manufacturing, resource loading by an activity is flexible, and the activity duration is a function of resource allocation. For example, if one doubles the size of the crew assigned to perform an activity, it may be feasible to complete the activity in half the duration. Such flexibility has been modeled by Weglarz [131 and by Leachman, Dincerler, and Kim [7] in extended formulations of the resource-constrained project scheduling problem. This paper presents a new algorithmic approach to the problem that combines the ideas proposed by the aforementioned authors. The method we propose involves a two-step approach: (1) solve the resource-constrained scheduling problem using a heuristic, and (2) using this schedule as an initial feasible solution, find improved resource allocations by solving a linear programming model. We provide computational results indicating the superiority of this approach to previous methodology for the resource-constrained scheduling problem. Extensions to the model to admit overlap relationships of the activities also are presented.

Evaluating Schedule Uncertainty in Unit-Based Repetitive Building Projects

  • Okmen, Onder
    • Journal of Construction Engineering and Project Management
    • /
    • 제3권2호
    • /
    • pp.21-34
    • /
    • 2013
  • Various risk factors affect construction projects. Due to the uncertainties created by risk factors, actual activity durations frequently deviate from the estimated durations in either favorable or adverse direction. For this reason, evaluation of schedule uncertainty is required to make decisions accurately when managing construction projects. In this regard, this paper presents a new computer simulation model - the Repetitive Schedule Risk Analysis Model (RSRAM) - to evaluate unit-based repetitive building project schedules under uncertainty when activity durations and risk factors are correlated. The proposed model utilizes Monte Carlo Simulation and a Critical Path Method based repetitive scheduling procedure. This new procedure concurrently provides the utilization of resources without interruption and the maintenance of network logic through successive units. Furthermore, it enables assigning variable production rates to the activities from one unit to another and any kind of relationship type with or without lag time. Details of the model are described and an example application is presented. The findings show that the model produces realistic results regarding the extent of uncertainty inherent in the schedule.

시스템 엔지니어링에 기초한 도시형 자기부상열차 실용화 타당성 조사 사업의 수행방법 연구 (A Study on the Method of the Project for Feasibility Study to Practical Use Urban Transit Maglev Based on System Engineering)

  • 정경렬;윤세균;박철호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 춘계학술대회 특별세미나. 특별세션
    • /
    • pp.47-59
    • /
    • 2006
  • This study is about a feasibility study for the practical using Urban Transit Maglev system based on systems engineering. First of all we defined what phase is matched with the project for feasibility study in the system life cycle and identified tasks that shall be done in the phase. Finally we suggested how to do in this project. The Urban Transit Maglev system is not wholly new system. It has similar architecture to a legacy urban railway system. But it is the system that is partially introduced new technology, because there are many projects have this characteristic within the country, we expect that this study may provide references.

  • PDF

차세대 고속철도기술개발사업 추진방향 (A progressive course of the Next Generation High-Speed Rail Development Project)

  • 김기환;박찬경;김석원
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.1228-1233
    • /
    • 2006
  • Since 1996, the G7 R&D and High-Speed Rail development project have been accomplished and it will be completed in 2007. During that time, we have achieved the origin design technique based on technique development experience. However, in order to magnify and to promote the growth of the origin design technique for railway industry to be a growth motive industry in future from intensive speed elevation and new technique competition of advanced nations, we need to prepare the next generation high-speed rail technique and to sustain expansion of the technique with getting hold of new technique tendency of the world. Therefore, this paper make research into necessity of the next generation high-speed rail development project, making an analysis of foreign countries cases and forward plan.

  • PDF

금융 신상품 개발을 위한 IT구현 프로젝트관리 특성에 관한 연구 (A Study on major characteristics of IT implementation project management for new product development in the financial sector)

  • 이연재;이희조;이석주
    • 한국정보처리학회:학술대회논문집
    • /
    • 한국정보처리학회 2014년도 춘계학술발표대회
    • /
    • pp.578-581
    • /
    • 2014
  • 은행의 경영환경은 급변하고 금융시장에서의 경쟁은 심화되고 있는 가운데 은행의 경쟁력 확보는 상품의 시장 진입 속도에 달려있으나, 상품 개발의 지연으로 시장 점유율의 확대 기회를 놓치고 있는 실정이다. 이에 국내 은행들은 시장 선점을 위해 IT기반의 금융 신상품 개발에 많은 투자를 하고 있다. 본 연구는 신속한 금융 신상품 개발을 위해 상품 조건들을 레고 블록처럼 조립하면 쉽고 빠르게 상품이 만들어 지는 IT기반의 상품 팩토리의 아키텍처와 상품 생성 관계도를 정의하며, 변동금리와 층화(Tier) 계층의 상품 생성에 효율적인 매트릭스 조건의 이율형을 제시한다. 아울러 이러한 기반을 활용한 시스템의 개발 생산성과 프로젝트의 특성 및 효과 등을 검증한다.

Serve as You Learn: Problem-Based Service-Learning Integrated into a Product Innovation and Management Class

  • Kim, Eundeok;Lee, Yoon-Jung
    • International Journal of Costume and Fashion
    • /
    • 제18권2호
    • /
    • pp.29-43
    • /
    • 2018
  • Service-learning is a form of experiential education in which students participate in organized activities and develop a sense of civic responsibility while acquiring content knowledge of the discipline. The purpose of this study was first, to examine the underlying theories and principles of service-learning, and second, to present a case of systemic implementation of problem-based service-learning into a Product Innovation and Management class in higher education. The New Product Development for an E-Commerce Small Business project was developed for a community partner, BevShots, reflecting the needs of the firm, and was tightly woven into the course content. Students' participation in the project had a significant effect on increasing their awareness of the needs in the community and identifying their roles as citizens as well as enhancing their content knowledge learning. The community partner also received benefits for his business by participating in the project. Through this study, we aim to inspire fashion design and merchandising educators to implement service-learning projects/classes in the curriculum.

기술문명징후 탐색 (SEARCH FOR TECHNOSIGNATURE)

  • Sungwook E. Hong;Bong Won Sohn;Taehyun Jung;Min-Su Shin;Hyunwoo Kang;Minsun Kim
    • 천문학논총
    • /
    • 제38권2호
    • /
    • pp.75-89
    • /
    • 2023
  • Technosignature, previously known as SETI(search for extraterrestrial intelligence), is the scientific evidence of past or present extraterrestrial civilizations. Since NRAO's Project Ozma was performed in 1960, most of the noticeable technosignature searches have been done by radio telescopes, hoping to find strong and narrow bandwidth signals that cannot be explained by known natural processes. Recently, the Breakthrough Listen project has opened a new opportunity for technosignature by utilizing both optical telescopes, radio telescopes, and next-generation radio telescope arrays. In this review, mainly based on NASA Technosignatures Workshop (2018), we review the current trends of technosignature surveys, as well as other possible methods for detecting technosignature. Also, we suggest what the Korean community could contribute the technosignature research, including the new SETI project with Korea VLBI Network (KVN).

Influencing Variables and Keywords of Technology Strategy for Modernized Hanok Research

  • Jeong, Yeheun;Lee, Yunsub;Kang, Seunghee;Jin, Zhenhui;Jung, Youngsoo
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.433-439
    • /
    • 2020
  • As eco-friendly and sustainable architecture is becoming more popular, the interest in Korean traditional wooden buildings (Hanok) has also been increasing. The building technologies of the wooden construction have been actively developed in all over the world through the diversification of new materials and construction methods. On the other hand, the growth rate of wooden construction market is still slow in Korea. In an attempt to promote the Korean traditional wooden buildings, a comprehensive research project has been conducted. This R&D project is developing standard designs, new materials, and methods for modernized Hanok including houses, public buildings, long-span structures, and even high-rise buildings. To this end, the purpose of this study is to formulate a technological strategy for popularization of modernized Hanok. Influencing variables and issues are analyzed and defined first. At the same time, the five keywords have examined in the perspective of dissemination of modernized Hanok technology. Finally, a technology road map for strategic development of modernized Hanok is proposed through casual diagrams.

  • PDF